X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335031902000

Well Details

Well ID: 0335031902000
Loading map...
Location: 00/02-19-033-03W5/0
Location Alias: 00/02-19-33-03 W5M
Location Alias 2: 00/02-19-033-03 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 03
Section: 19
County/Municipality: Mountain View County
Well Name: TIMBERROCK HZ GARR 2-19-33-3
Operator Name: TimberRock Energy Corp.
License Number: 0486417
License Date: 2017-11-20
License Status: Issued
Spud Date: 2017-12-08
Final Drill Date: 2017-12-19
Well Total Depth: 3926.00 m
Surface Hole Latitude: 51.852558
Surface Hole Longitude: -114.411218

For data sources see[1][2]

Well History

Date Event
2017-11-20 Obtained License
2017-12-08 Lost Circulation Occurred
2017-12-09 Intermediate Casing Operation Performed
2017-12-09 Surface Casing Operation Performed
2017-12-10 Direction Drilling Operation Performed - Deviate
2017-12-14 Direction Drilling Operation Performed - Horizontal
2017-12-14 Well Log Performed
2017-12-15 Intermediate Casing Operation Performed
2017-12-19 Finished Drilling
2017-12-19 Production Casing Operation Performed
2017-12-19 Well Log Performed
2017-12-19 Well Mode changed to Drilled and Cased
2017-12-20 Rig Released
2018-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-15 Well Fluid changed to Gas
2018-02-15 Well Mode changed to Testing
2018-02-23 Well Fluid changed to Gas
2018-02-23 Well Mode changed to Test Completed
2018-03-09 Well Began Production
2018-03-09 Well Fluid changed to Gas
2018-03-09 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-08 Horizon Drilling Inc. 47 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-10 1342.70 Deviate (5 - 79 degrees)
2017-12-14 2643.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-08 Multi-Stage Fracture 3863.10 3865.00 0
2018-02-09 Multi-Stage Fracture 3294.10 3296.00 0
2018-02-09 Multi-Stage Fracture 3232.10 3234.00 0
2018-02-09 Multi-Stage Fracture 3170.30 3172.20 0
2018-02-09 Multi-Stage Fracture 3010.00 3011.90 0
2018-02-09 Multi-Stage Fracture 2962.10 2964.00 0
2018-02-09 Multi-Stage Fracture 2914.20 2916.20 0
2018-02-09 Multi-Stage Fracture 2852.40 2854.30 0
2018-02-09 Multi-Stage Fracture 2790.50 2792.50 0
2018-02-09 Multi-Stage Fracture 2714.30 2716.30 0
2018-02-08 Multi-Stage Fracture 3801.50 3803.40 0
2018-02-08 Multi-Stage Fracture 3739.50 3741.40 0
2018-02-08 Multi-Stage Fracture 3678.30 3680.30 0
2018-02-08 Multi-Stage Fracture 3601.80 3603.70 0
2018-02-08 Multi-Stage Fracture 3539.60 3541.50 0
2018-02-09 Multi-Stage Fracture 3477.40 3479.30 0
2018-02-09 Multi-Stage Fracture 3415.40 3417.30 0
2018-02-09 Multi-Stage Fracture 3354.70 3356.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-08 2018-02-09 2,488 3,365 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.2704 N/A
20/40 SiberProp Calfrac Quartz 14808-60-7 100 4.9044 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 8.8911 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.4699 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.249 N/A
Water 7732-18-5 100 0.249 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0207 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0207 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0207 N/A
Polyethylene glycol 25322-68-3 100 0.0207 N/A
Sodium bromide 7647-15-6 100 0.0207 N/A
DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0199 N/A
Water 7732-18-5 100 0.0199 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0689 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0007 N/A
Cinnamaldehyde 104-55-2 100 0.0007 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0007 N/A
Ethylene Glycol 107-21-1 100 0.0007 N/A
Formic acid 64-18-6 100 0.0007 N/A
Isopropyl alcohol 67-63-0 100 0.0007 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0007 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0007 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0724 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0724 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.3045 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-06 2018-02-10 Surface Water - Runoff 1440

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5563 0.0 0.0 0.0
2019 8578 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-08 Lost Circulation 42.00 42.00
2018-02-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References