X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335031516000

Well Details

Well ID: 0335031516000
Loading map...
Location: 00/16-15-033-03W5/0
Location Alias: 00/16-15-33-03 W5M
Location Alias 2: 00/16-15-033-03 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 03
Section: 15
County/Municipality: Mountain View County
Well Name: WHITECAP GARR 16-15-33-3
Operator Name: Whitecap Resources Inc.
License Number: 0024487
License Date: 1963-07-11
License Status: Issued
Spud Date: 1963-07-13
Final Drill Date: 1963-08-01
Well Total Depth: 1975.10 m
Surface Hole Latitude: 51.836369
Surface Hole Longitude: -114.336296

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-07-11 Obtained License
1963-08-01 Finished Drilling
1963-08-01 Well Mode changed to Drilled and Cased
1963-08-02 Production Casing Operation Performed
1963-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-06 Perforation Treatment Performed - Selective Jet Perforations
1963-08-07 Perforation Treatment Performed - Fractured
1963-09-01 Well Began Production
1963-09-01 Well Fluid changed to Crude Oil
1963-09-01 Well Mode changed to Flowing
1963-09-29 Perforation Treatment Performed - Fractured
1964-07-17 Well Fluid changed to Crude Oil
1964-07-17 Well Mode changed to Pumping
1983-11-30 Well Fluid changed to Crude Oil
1983-11-30 Well Mode changed to Suspended
1990-10-19 Well Fluid changed to Crude Oil
1990-10-19 Well Mode changed to Pumping
2014-06-01 Well Fluid changed to Crude Oil
2014-06-01 Well Mode changed to Suspended
2017-06-02 Well Fluid changed to Crude Oil
2017-06-02 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-08-06 Selective Jet Perforations 1924.50 1924.80 0
1963-08-06 Selective Jet Perforations 1925.10 1925.40 0
1963-08-06 Selective Jet Perforations 1957.70 1958.30 0
1963-08-06 Acid Treatment 1957.70 1958.30 0
1963-08-06 Acid Treatment 1924.50 1925.40 0
1963-08-07 Fracture 1924.50 1958.30 0
1963-09-29 Fracture 1924.50 1958.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 216 0.0 0.0 0.0
1968 3308 0.0 0.0 0.0
1969 2647 0.0 0.0 0.0
1970 2154 0.0 0.0 0.0
1971 1829 0.0 0.0 0.0
1972 3104 0.0 0.0 0.0
1973 8370 0.0 0.0 0.0
1974 8332 0.0 0.0 0.0
1975 2510 0.0 0.0 0.0
1976 707 0.0 0.0 0.0
1977 3949 0.0 0.0 0.0
1978 4503 0.0 0.0 0.0
1979 4582 0.0 0.0 0.0
1980 8340 0.0 0.0 0.0
1981 8512 0.0 0.0 0.0
1982 8168 0.0 0.0 0.0
1983 5718 0.0 0.0 0.0
1990 1982 0.0 0.0 0.0
1991 7108 0.0 0.0 0.0
1992 7488 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8063 0.0 0.0 0.0
1996 8135 0.0 0.0 0.0
1997 8280 0.0 0.0 0.0
1998 7583 0.0 0.0 0.0
1999 24 0.0 0.0 0.0
2000 1619 0.0 0.0 0.0
2001 8116 0.0 0.0 0.0
2002 7583 0.0 0.0 0.0
2003 8262 0.0 0.0 0.0
2004 8772 0.0 0.0 0.0
2005 7252 0.0 0.0 0.0
2006 8569 0.0 0.0 0.0
2007 8652 0.0 0.0 0.0
2008 7877 0.0 0.0 0.0
2009 8401 0.0 0.0 0.0
2010 8338 0.0 0.0 0.0
2011 7377 0.0 0.0 0.0
2012 7508 0.0 0.0 0.0
2013 3575 0.0 0.0 0.0
2017 4964 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 5688 0.0 0.0 0.0

For data sources see[5]

References