If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0334271504003 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/04-15-033-27W4/3 | |
| Location Alias: 00/04-15-33-27 W4M | |
| Location Alias 2: 00/04-15-033-27 W4/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 033 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 15 | |
| County/Municipality: Mountain View County | |
| Well Name: EMBER STEWART 4-15-33-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0332864 | |
| License Date: 2005-06-14 | |
| License Status: Issued | |
| Spud Date: 2005-08-05 | |
| Final Drill Date: 2005-08-06 | |
| Well Total Depth: 1150.00 m | |
| Surface Hole Latitude: 51.825775 | |
| Surface Hole Longitude: -113.757249 |
| Date | Event |
|---|---|
| 2005-06-14 | Obtained License |
| 2005-08-05 | Surface Casing Operation Performed |
| 2005-08-06 | Finished Drilling |
| 2005-08-06 | Well Mode changed to Drilled and Cased |
| 2005-08-07 | Production Casing Operation Performed |
| 2005-08-07 | Rig Released |
| 2005-08-08 | Well Log Performed |
| 2005-09-02 | Perforation Treatment Performed - Jet Perforation |
| 2005-09-02 | Well Log Performed |
| 2005-09-04 | Perforation Treatment Performed - Fractured |
| 2006-03-01 | Well Began Production |
| 2006-03-01 | Well Fluid changed to Gas |
| 2006-03-01 | Well Mode changed to Flowing |
| 2006-06-04 | Perforation Treatment Performed - Jet Perforation |
| 2006-06-04 | Well Log Performed |
| 2006-06-06 | Perforation Treatment Performed - Fractured |
| 2006-06-08 | Well Structure changed to Commingled |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-09-02 | Perforation | 1022.00 | 1024.00 | 17 |
| 2005-09-04 | Fracture | 430.00 | 684.00 | 0 |
| 2006-06-04 | Perforation | 384.00 | 384.50 | 17 |
| 2006-06-04 | Perforation | 390.80 | 391.80 | 17 |
| 2006-06-04 | Perforation | 516.80 | 517.30 | 17 |
| 2006-06-04 | Perforation | 564.80 | 565.30 | 17 |
| 2006-06-04 | Perforation | 615.90 | 616.40 | 17 |
| 2006-06-04 | Perforation | 624.80 | 625.30 | 17 |
| 2006-06-04 | Perforation | 628.00 | 628.50 | 17 |
| 2006-06-04 | Perforation | 632.90 | 633.40 | 17 |
| 2006-06-04 | Perforation | 642.40 | 642.90 | 17 |
| 2005-09-02 | Perforation | 1031.00 | 1036.00 | 17 |
| 2006-06-04 | Perforation | 678.20 | 678.70 | 17 |
| 2006-06-04 | Perforation | 710.90 | 712.90 | 17 |
| 2006-06-04 | Perforation | 717.40 | 717.90 | 17 |
| 2006-06-04 | Perforation | 725.30 | 726.30 | 17 |
| 2006-06-04 | Perforation | 736.50 | 737.00 | 17 |
| 2006-06-04 | Perforation | 747.50 | 748.00 | 17 |
| 2006-06-04 | Perforation | 753.80 | 754.30 | 17 |
| 2006-06-04 | Perforation | 756.80 | 757.30 | 17 |
| 2006-06-04 | Perforation | 771.60 | 772.10 | 17 |
| 2006-06-04 | Perforation | 783.30 | 783.80 | 17 |
| 2005-09-02 | Perforation | 847.00 | 851.00 | 17 |
| 2006-06-04 | Perforation | 785.00 | 787.00 | 17 |
| 2006-06-06 | Fracture | 384.00 | 391.80 | 0 |
| 2006-06-06 | Fracture | 516.80 | 678.70 | 0 |
| 2006-06-06 | Fracture | 710.90 | 787.00 | 0 |
| 2005-09-02 | Perforation | 430.00 | 432.00 | 17 |
| 2005-09-02 | Perforation | 455.50 | 457.00 | 17 |
| 2005-09-02 | Perforation | 498.00 | 503.00 | 17 |
| 2005-09-02 | Perforation | 681.00 | 684.00 | 17 |
| 2005-09-04 | Fracture | 1022.00 | 1036.00 | 0 |
| 2005-09-04 | Fracture | 847.00 | 851.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 2193 | 0.0 | 0.0 | 0.0 |
For data sources see[5]