If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0334270313000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.80703,"lon":-113.757315,"icon":""}]} |
| Location: 00/13-03-033-27W4/0 | |
| Location Alias: 00/13-03-33-27 W4M | |
| Location Alias 2: 00/13-03-033-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 033 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 03 | |
| County/Municipality: Mountain View County | |
| Well Name: EMBER STEWART 13-3-33-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0329911 | |
| License Date: 2005-04-27 | |
| License Status: Issued | |
| Spud Date: 2005-09-06 | |
| Final Drill Date: 2005-09-08 | |
| Well Total Depth: 1175.00 m | |
| Surface Hole Latitude: 51.807030 | |
| Surface Hole Longitude: -113.757315 |
| Date | Event |
|---|---|
| 2005-04-27 | Obtained License |
| 2005-09-07 | Surface Casing Operation Performed |
| 2005-09-08 | Finished Drilling |
| 2005-09-08 | Well Log Performed |
| 2005-09-08 | Well Mode changed to Drilled and Cased |
| 2005-09-09 | Production Casing Operation Performed |
| 2005-09-09 | Rig Released |
| 2005-09-24 | Perforation Treatment Performed - Jet Perforation |
| 2005-09-25 | Perforation Treatment Performed - Fractured |
| 2006-03-03 | Well Began Production |
| 2006-03-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2006-03-03 | Well Mode changed to Flowing |
| 2006-05-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2006-05-18 | Well Mode changed to Flowing |
| 2006-09-08 | Perforation Treatment Performed - Jet Perforation |
| 2006-09-08 | Well Log Performed |
| 2006-09-09 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-09-24 | Perforation | 873.00 | 878.00 | 17 |
| 2006-09-08 | Perforation | 398.10 | 398.60 | 13 |
| 2006-09-08 | Perforation | 487.30 | 487.80 | 13 |
| 2006-09-08 | Perforation | 624.60 | 625.10 | 13 |
| 2006-09-08 | Perforation | 626.90 | 627.40 | 13 |
| 2006-09-08 | Perforation | 634.50 | 635.00 | 13 |
| 2006-09-08 | Perforation | 681.00 | 681.50 | 13 |
| 2006-09-08 | Perforation | 709.60 | 710.10 | 13 |
| 2006-09-08 | Perforation | 714.60 | 715.10 | 13 |
| 2006-09-08 | Perforation | 719.60 | 720.10 | 13 |
| 2006-09-08 | Perforation | 729.50 | 730.00 | 13 |
| 2005-09-24 | Perforation | 913.00 | 914.00 | 17 |
| 2006-09-08 | Perforation | 740.00 | 740.50 | 13 |
| 2006-09-08 | Perforation | 751.10 | 751.60 | 13 |
| 2006-09-08 | Perforation | 761.30 | 762.80 | 13 |
| 2006-09-08 | Perforation | 767.10 | 767.60 | 13 |
| 2006-09-08 | Perforation | 775.20 | 775.70 | 13 |
| 2006-09-08 | Perforation | 785.30 | 785.80 | 13 |
| 2006-09-08 | Perforation | 787.50 | 788.00 | 13 |
| 2006-09-09 | Fracture | 385.60 | 398.60 | 0 |
| 2006-09-09 | Fracture | 487.30 | 487.80 | 0 |
| 2006-09-09 | Fracture | 624.60 | 788.00 | 0 |
| 2005-09-24 | Perforation | 947.00 | 951.00 | 17 |
| 2005-09-24 | Perforation | 411.00 | 414.00 | 17 |
| 2005-09-24 | Perforation | 596.00 | 598.00 | 17 |
| 2005-09-24 | Perforation | 606.00 | 611.00 | 17 |
| 2005-09-25 | Fracture | 873.00 | 951.00 | 0 |
| 2005-09-25 | Fracture | 411.00 | 611.00 | 0 |
| 2006-09-08 | Perforation | 385.60 | 386.10 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 6013 | 0.0 | 0.0 | 0.0 |
| 2007 | 8660 | 0.0 | 0.0 | 0.0 |
| 2008 | 8661 | 0.0 | 0.0 | 0.0 |
| 2009 | 8658 | 0.0 | 0.0 | 0.0 |
| 2010 | 8566 | 0.0 | 0.0 | 0.0 |
| 2011 | 8494 | 0.0 | 0.0 | 0.0 |
| 2012 | 8438 | 0.0 | 0.0 | 0.0 |
| 2013 | 8557 | 0.0 | 0.0 | 0.0 |
| 2014 | 8715 | 0.0 | 0.0 | 0.0 |
| 2015 | 8646 | 0.0 | 0.0 | 0.0 |
| 2016 | 8601 | 0.0 | 0.0 | 0.0 |
| 2017 | 8528 | 0.0 | 0.0 | 0.0 |
| 2018 | 8683 | 0.0 | 0.0 | 0.0 |
| 2019 | 8645 | 0.0 | 0.0 | 0.0 |
| 2020 | 2170 | 0.0 | 0.0 | 0.0 |
For data sources see[5]