X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334262405002

Well Details

Well ID: 0334262405002
Loading map...
Location: 00/05-24-033-26W4/2
Location Alias: 00/05-24-33-26 W4M
Location Alias 2: 00/05-24-033-26 W4/02
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 26
Section: 24
County/Municipality: Kneehill County
Well Name: Vantage WIM 5-24-33-26
Operator Name: Vantage Point Resources Inc.
License Number: 0013256
License Date: 1957-03-29
License Status: Suspension
Spud Date: 1957-04-01
Final Drill Date: 1957-05-07
Well Total Depth: 2304.30 m
Surface Hole Latitude: 51.843722
Surface Hole Longitude: -113.568686

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-03-29 Obtained License
1957-04-29 Drill Stem Test Performed
1957-05-02 Drill Stem Test Performed
1957-05-06 Drill Stem Test Performed
1957-05-07 Finished Drilling
1957-05-07 Well Mode changed to Drilled and Cased
1957-05-10 Production Casing Operation Performed
1957-05-12 Perforation Treatment Performed - Bullet Perforation
1957-05-15 Perforation Treatment Performed - Cement Squeeze
1957-05-18 Perforation Treatment Performed - Bullet Perforation
1957-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-05-20 Perforation Treatment Performed - Acid Wash - No Pressure
1964-03-26 Perforation Treatment Performed - Jet Perforation
1964-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-27 Perforation Treatment Performed - Acid Wash - No Pressure
1964-03-31 Well Began Production
1964-03-31 Well Fluid changed to Crude Oil
1964-03-31 Well Mode changed to Flowing
1972-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-13 Perforation Treatment Performed - Jet Perforation
1974-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-01-23 Perforation Treatment Performed - Jet Perforation
1980-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-22 Well Fluid changed to Crude Oil
1980-09-22 Well Mode changed to Flowing
1981-04-01 Well Fluid changed to Crude Oil
1981-04-01 Well Mode changed to Suspended
1984-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-24 Well Fluid changed to Crude Oil
1984-01-24 Well Mode changed to Flowing
1984-03-01 Well Fluid changed to Crude Oil
1984-03-01 Well Mode changed to Suspended
1985-03-22 Well Fluid changed to Crude Oil
1985-03-22 Well Mode changed to Flowing
1986-01-01 Well Fluid changed to Crude Oil
1986-01-01 Well Mode changed to Suspended
1987-04-27 Well Fluid changed to Crude Oil
1987-04-27 Well Mode changed to Flowing
1987-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-24 Perforation Treatment Performed - Jet Perforation
1991-01-25 Well Log Performed
1991-01-26 Well Log Performed
1991-01-28 Perforation Treatment Performed - Cement Squeeze
1991-01-31 Perforation Treatment Performed - Jet Perforation
1991-01-31 Well Log Performed
1991-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-15 Well Fluid changed to Crude Oil
1991-02-15 Well Mode changed to Pumping
1994-09-15 Perforation Treatment Performed - Jet Perforation
1994-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-15 Well Fluid changed to Crude Oil
2010-10-15 Well Log Performed
2010-10-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-05-12 Bullet Perforation 2279.60 2280.50 13
1972-05-13 Perforation 2271.70 2272.90 7
1972-05-13 Acid Treatment 2271.70 2272.90 0
1974-01-23 Packing Device Capped w/Cement 2273.20 2273.20 0
1974-01-23 Perforation 2265.30 2265.90 13
1974-01-23 Perforation 2266.50 2267.10 13
1980-09-22 Packing Device Capped w/Cement 2233.00 2236.00 0
1980-09-22 Packing Device Capped w/Cement 2224.00 2231.60 0
1984-01-24 Acid Treatment 2218.30 2222.30 0
1987-10-20 Acid Treatment 2218.30 2222.30 0
1991-01-24 Perforation 2221.10 2222.60 16
1957-05-15 Cement Squeeze 2279.60 2280.50 0
1991-01-28 Cement Squeeze 2218.30 2222.60 0
1991-01-31 Perforation 2221.10 2222.60 16
1991-02-01 Acid Treatment 2221.10 2222.60 0
1994-09-15 Perforation 2217.00 2223.00 13
1994-09-17 Acid Treatment 2217.00 2224.00 0
1957-05-18 Bullet Perforation 2277.80 2278.40 13
1957-05-20 Acid Wash 2277.80 2278.40 0
1957-05-20 Acid Treatment 2277.80 2278.40 0
1964-03-26 Perforation 2221.40 2222.30 7
1964-03-26 Perforation 2218.30 2219.20 7
1964-03-27 Acid Wash 2218.30 2222.30 0
1964-03-27 Acid Treatment 2218.30 2222.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1943 0.0 0.0 0.0
1968 1150 0.0 0.0 0.0
1969 2126 0.0 0.0 0.0
1970 355 0.0 0.0 0.0
1971 386 0.0 0.0 0.0
1972 873 0.0 0.0 0.0
1973 2255 0.0 0.0 0.0
1974 660 0.0 0.0 0.0
1975 298 0.0 0.0 0.0
1976 342 0.0 0.0 0.0
1977 1116 0.0 0.0 0.0
1978 464 0.0 0.0 0.0
1979 308 0.0 0.0 0.0
1980 288 0.0 0.0 0.0
1981 104 0.0 0.0 0.0
1984 251 0.0 0.0 0.0
1985 411 0.0 0.0 0.0
1987 698 0.0 0.0 0.0
1988 635 0.0 0.0 0.0
1989 141 0.0 0.0 0.0
1990 12 0.0 0.0 0.0
1991 5089 0.0 0.0 0.0
1992 7930 0.0 0.0 0.0
1993 7522 0.0 0.0 0.0
1994 5673 0.0 0.0 0.0
1995 5016 0.0 0.0 0.0
1996 5525 0.0 0.0 0.0
1997 8160 0.0 0.0 0.0
1998 7955 0.0 0.0 0.0
1999 8507 0.0 0.0 0.0
2000 8320 0.0 0.0 0.0
2001 7903 0.0 0.0 0.0
2002 8689 0.0 0.0 0.0
2003 7351 0.0 0.0 0.0
2004 7061 0.0 0.0 0.0
2005 8384 0.0 0.0 0.0
2006 8246 0.0 0.0 0.0
2007 8275 0.0 0.0 0.0
2008 6892 0.0 0.0 0.0
2009 4443 0.0 0.0 0.0

For data sources see[5]

References