X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334261310003

Well Details

Well ID: 0334261310003
Loading map...
Location: 00/10-13-033-26W4/3
Location Alias: 00/10-13-33-26 W4M
Location Alias 2: 00/10-13-033-26 W4/03
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 26
Section: 13
County/Municipality: Kneehill County
Well Name: Vantage WIM 10-13-33-26
Operator Name: Vantage Point Resources Inc.
License Number: 0036388
License Date: 1969-06-19
License Status: Issued
Spud Date: 1969-06-24
Final Drill Date: 1969-07-09
Well Total Depth: 2273.80 m
Surface Hole Latitude: 51.833372
Surface Hole Longitude: -113.558053

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-06-19 Obtained License
1969-07-09 Finished Drilling
1969-07-09 Well Mode changed to Drilled and Cased
1969-07-12 Drill Stem Test Performed
1969-07-13 Drill Stem Test Performed
1969-07-15 Production Casing Operation Performed
1969-08-03 Perforation Treatment Performed - Jet Perforation
1969-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-13 Perforation Treatment Performed - Jet Perforation
1975-11-05 Perforation Treatment Performed - Cement Squeeze
1975-11-06 Perforation Treatment Performed - Jet Perforation
1975-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-31 Perforation Treatment Performed - Jet Perforation
1983-10-31 Well Log Performed
1983-11-01 Perforation Treatment Performed - Fractured
1985-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-09 Well Log Performed
1989-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-10-01 Plug Back Performed
1994-08-09 Perforation Treatment Performed - Jet Perforation
1994-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-22 Well Log Performed
1995-11-23 Perforation Treatment Performed - Jet Perforation
1995-11-23 Well Log Performed
1995-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-23 Well Log Performed
1999-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-01-24 Perforation Treatment Performed - Jet Perforation
1999-01-24 Plug Back Performed
1999-02-04 Well Began Production
1999-02-04 Well Fluid changed to Gas
1999-02-04 Well Mode changed to Flowing
2005-05-12 Well Log Performed
2005-05-13 Well Log Performed
2005-05-14 Well Log Performed
2005-05-15 Well Log Performed
2005-05-16 Perforation Treatment Performed - Jet Perforation
2005-05-18 Perforation Treatment Performed - Jet Perforation
2005-05-18 Perforation Treatment Performed - Remedial Casing
2005-05-18 Well Log Performed
2005-05-24 Perforation Treatment Performed - Remedial Casing
2006-12-01 Well Fluid changed to Gas
2006-12-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-08-03 Perforation 2255.20 2255.50 13
1983-11-01 Fracture 2247.90 2255.50 0
1985-03-13 Acid Treatment 2247.90 2255.50 0
1985-08-21 Acid Treatment 2247.90 2255.50 0
1989-10-01 Packing Device Capped w/Cement 2224.40 2236.60 0
1994-08-09 Perforation 2195.50 2197.60 13
1994-08-09 Perforation 2201.30 2202.80 13
1994-08-10 Acid Treatment 2195.50 2202.80 0
1995-11-23 Perforation 2191.50 2193.50 14
1995-11-25 Acid Treatment 2191.50 2193.50 0
1999-01-24 Packing Device Capped w/Cement 2180.00 2188.00 0
1969-08-04 Acid Treatment 2255.20 2255.50 0
1999-01-24 Packing Device Capped w/Cement 2160.00 2168.00 0
1999-01-24 Perforation 1987.30 1991.00 13
1999-01-24 Acid Treatment 1987.30 1991.00 0
2005-05-16 Perforation 1312.00 1313.10 99
2005-05-18 Perforation 150.00 150.30 40
2005-05-18 Remedial Casing Cementing 150.00 150.30 0
2005-05-24 Remedial Casing Cementing 1312.00 1313.10 0
1971-03-13 Perforation 2258.60 2259.20 16
1971-03-13 Acid Treatment 2258.60 2259.20 0
1975-11-05 Cement Squeeze 2255.20 2259.20 0
1975-11-06 Perforation 2248.20 2251.30 7
1975-11-07 Acid Treatment 2248.20 2251.30 0
1975-11-10 Acid Treatment 2248.20 2251.30 0
1983-10-31 Perforation 2247.90 2255.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 6904 0.0 0.0 0.0
2000 8403 0.0 0.0 0.0
2001 8752 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8276 0.0 0.0 0.0
2004 8777 0.0 0.0 0.0
2005 3141 0.0 0.0 0.0
2006 6394 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8621 0.0 0.0 0.0
2009 8495 0.0 0.0 0.0
2010 8459 0.0 0.0 0.0
2011 7688 0.0 0.0 0.0
2012 5923 0.0 0.0 0.0
2013 8393 0.0 0.0 0.0
2014 8497 0.0 0.0 0.0
2015 8678 0.0 0.0 0.0
2016 7825 0.0 0.0 0.0
2017 8247 0.0 0.0 0.0
2018 8730 0.0 0.0 0.0
2019 7644 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References