If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334253514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.875246,"lon":-113.444486,"icon":""}]} |
Location: 00/14-35-033-25W4/0 | |
Location Alias: 00/14-35-33-25 W4M | |
Location Alias 2: 00/14-35-033-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 25 | |
Section: 35 | |
County/Municipality: Kneehill County | |
Well Name: EMBER SD TWINING 14-35-33-25 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423640 | |
License Date: 2010-09-21 | |
License Status: Issued | |
Spud Date: 2010-12-30 | |
Final Drill Date: 2011-01-02 | |
Well Total Depth: 1117.00 m | |
Surface Hole Latitude: 51.875246 | |
Surface Hole Longitude: -113.444486 |
Date | Event |
---|---|
2010-09-21 | Obtained License |
2010-12-30 | Blowout Occurred |
2010-12-30 | Direction Drilling Operation Performed - Deviate |
2011-01-01 | Surface Casing Operation Performed |
2011-01-02 | Finished Drilling |
2011-01-02 | Well Mode changed to Drilled and Cased |
2011-01-03 | Production Casing Operation Performed |
2011-01-03 | Rig Released |
2011-01-19 | Well Log Performed |
2011-02-05 | Perforation Treatment Performed - Jet Perforation |
2011-02-21 | Perforation Treatment Performed - Fractured |
2011-02-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-24 | Well Mode changed to Testing |
2011-04-07 | Well Began Production |
2011-04-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-04-07 | Well Mode changed to Flowing |
2012-04-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-04-09 | Well Mode changed to Suspended |
2012-10-04 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-10-04 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-12-30 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-05 | Perforation | 582.60 | 583.00 | 13 |
2011-02-05 | Perforation | 611.30 | 611.60 | 13 |
2011-02-05 | Perforation | 407.00 | 407.30 | 13 |
2011-02-05 | Perforation | 418.70 | 419.50 | 13 |
2011-02-05 | Perforation | 402.70 | 403.00 | 13 |
2011-02-05 | Perforation | 344.30 | 344.60 | 13 |
2011-02-05 | Perforation | 386.70 | 387.00 | 13 |
2011-02-05 | Perforation | 465.20 | 465.50 | 13 |
2011-02-05 | Perforation | 538.10 | 538.50 | 13 |
2011-02-05 | Perforation | 462.40 | 462.70 | 13 |
2011-02-05 | Perforation | 430.10 | 430.40 | 13 |
2011-02-05 | Perforation | 595.60 | 595.90 | 13 |
2011-02-05 | Perforation | 434.40 | 434.70 | 13 |
2011-02-05 | Perforation | 472.00 | 473.00 | 13 |
2011-02-05 | Perforation | 563.80 | 564.80 | 13 |
2011-02-05 | Perforation | 741.20 | 741.50 | 13 |
2011-02-05 | Perforation | 749.30 | 749.70 | 13 |
2011-02-05 | Perforation | 566.00 | 568.50 | 13 |
2011-02-05 | Perforation | 758.10 | 758.40 | 13 |
2011-02-05 | Perforation | 770.90 | 771.20 | 13 |
2011-02-05 | Perforation | 675.50 | 677.50 | 13 |
2011-02-05 | Perforation | 762.00 | 764.00 | 13 |
2011-02-05 | Perforation | 578.60 | 579.00 | 13 |
2011-02-05 | Perforation | 697.70 | 698.00 | 13 |
2011-02-05 | Perforation | 698.80 | 699.10 | 13 |
2011-02-05 | Perforation | 683.00 | 683.30 | 13 |
2011-02-05 | Perforation | 637.10 | 637.50 | 13 |
2011-02-05 | Perforation | 642.10 | 642.40 | 13 |
2011-02-05 | Perforation | 730.10 | 732.60 | 13 |
2011-02-05 | Perforation | 733.10 | 734.20 | 13 |
2011-02-05 | Perforation | 699.70 | 700.00 | 13 |
2011-02-05 | Perforation | 720.50 | 721.20 | 13 |
2011-02-21 | Fracture | 344.30 | 749.70 | 0 |
2011-02-05 | Perforation | 562.50 | 563.20 | 13 |
2011-02-21 | Fracture | 472.00 | 764.00 | 0 |
2011-02-21 | Fracture | 758.10 | 771.20 | 0 |
2011-02-05 | Perforation | 569.30 | 569.60 | 13 |
2011-02-05 | Perforation | 623.00 | 623.50 | 13 |
2011-02-05 | Perforation | 630.40 | 630.80 | 13 |
2011-02-05 | Perforation | 613.80 | 614.40 | 13 |
2011-02-05 | Perforation | 606.80 | 607.40 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6518 | 0.0 | 0.0 | 0.0 |
2012 | 4506 | 0.0 | 0.0 | 0.0 |
2013 | 8736 | 0.0 | 0.0 | 0.0 |
2014 | 8529 | 0.0 | 0.0 | 0.0 |
2015 | 8643 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-12-30 | Blowout | 143.00 | 143.00 |
For data sources see[7]