X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334252308000

Well Details

Well ID: 0334252308000
Loading map...
Location: 00/08-23-033-25W4/0
Location Alias: 00/08-23-33-25 W4M
Location Alias 2: 00/08-23-033-25 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 25
Section: 23
County/Municipality: Kneehill County
Well Name: EOG TWINING 8-23-33-25
Operator Name: Pine Cliff Energy Ltd.
License Number: 0022826
License Date: 1962-08-08
License Status: Abandoned
Spud Date: 1962-08-09
Final Drill Date: 1962-08-26
Well Total Depth: 1694.70 m
Surface Hole Latitude: 51.843630
Surface Hole Longitude: -113.433126

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-08-08 Obtained License
1962-08-23 Drill Stem Test Performed
1962-08-26 Finished Drilling
1962-08-26 Well Mode changed to Drilled and Cased
1962-08-27 Production Casing Operation Performed
1962-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-10 Perforation Treatment Performed - Bullet Perforation
1962-09-22 Well Began Production
1962-09-22 Well Fluid changed to Crude Oil
1962-09-22 Well Mode changed to Pumping
1962-10-10 Perforation Treatment Performed - Cement Squeeze
1962-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-18 Perforation Treatment Performed - Bullet Perforation
1962-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-11-29 Perforation Treatment Performed - Bullet Perforation
1962-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-18 Perforation Treatment Performed - Bullet Perforation
1962-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-22 Perforation Treatment Performed - Jet Perforation
1985-07-08 Perforation Treatment Performed - Jet Perforation
1985-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-01 Well Fluid changed to Crude Oil
1997-10-01 Well Mode changed to Suspended
2013-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-04 Plug Back Performed
2013-11-04 Well Fluid changed to Crude Oil
2013-11-04 Well Mode changed to Abandoned Zone
2013-11-09 Perforation Treatment Performed - Cement Plug
2013-11-09 Plug Back Performed
2013-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-10 Plug Back Performed
2013-11-11 Perforation Treatment Performed - Cement Plug
2013-11-11 Plug Back Performed
2013-11-12 Perforation Treatment Performed - Cement Plug
2013-11-12 Plug Back Performed
2013-11-13 Perforation Treatment Performed - Cement Plug
2013-11-13 Plug Back Performed
2013-11-15 Perforation Treatment Performed - Cement Plug
2013-11-15 Plug Back Performed
2013-11-21 Well Abandoned
2013-11-21 Well Fluid changed to Crude Oil
2013-11-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-09-10 Bullet Perforation 1663.30 1664.50 7
1962-11-30 Acid Treatment 1660.60 1664.80 0
1962-12-18 Bullet Perforation 1657.50 1658.70 7
1962-12-18 Bullet Perforation 1652.00 1653.80 7
1962-12-20 Acid Treatment 1652.00 1658.70 0
1973-06-19 Acid Treatment 1652.00 1669.10 0
1973-06-22 Perforation 1667.90 1672.70 7
1973-06-22 Acid Treatment 1667.90 1672.70 0
1985-07-08 Perforation 1653.40 1654.80 13
1985-07-08 Perforation 1655.60 1656.40 13
1985-07-08 Perforation 1656.80 1658.60 13
1962-09-10 Bullet Perforation 1668.50 1669.10 7
1985-07-08 Perforation 1663.20 1664.70 13
1985-07-08 Perforation 1667.80 1669.60 13
1985-07-08 Perforation 1670.70 1672.70 13
1985-07-09 Acid Treatment 1653.40 1672.70 0
2013-11-04 Packing Device Capped w/Cement 1632.80 1641.20 0
2013-11-09 Cement Plug 1040.00 1240.00 0
2013-11-10 Packing Device Capped w/Cement 1016.80 1025.20 0
2013-11-11 Cement Plug 830.00 860.80 0
2013-11-12 Cement Plug 615.00 634.80 0
2013-11-13 Cement Plug 563.00 583.80 0
1962-09-10 Acid Treatment 1603.50 1669.10 0
2013-11-15 Cement Plug 461.00 481.80 0
1962-10-10 Cement Squeeze 1663.30 1669.10 0
1962-10-18 Bullet Perforation 1668.50 1669.10 7
1962-10-18 Acid Treatment 1668.50 1669.10 0
1962-11-29 Bullet Perforation 1663.60 1664.80 7
1962-11-29 Bullet Perforation 1660.60 1661.20 7
1962-11-29 Acid Treatment 1660.60 1664.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 816 0.0 0.0 0.0
1968 1484 0.0 0.0 0.0
1969 1438 0.0 0.0 0.0
1970 1224 0.0 0.0 0.0
1971 990 0.0 0.0 0.0
1972 744 0.0 0.0 0.0
1973 2482 0.0 0.0 0.0
1974 3046 0.0 0.0 0.0
1975 2584 0.0 0.0 0.0
1976 3573 0.0 0.0 0.0
1977 4059 0.0 0.0 0.0
1978 5111 0.0 0.0 0.0
1979 2209 0.0 0.0 0.0
1980 3810 0.0 0.0 0.0
1981 6731 0.0 0.0 0.0
1982 5844 0.0 0.0 0.0
1983 4800 0.0 0.0 0.0
1984 3996 0.0 0.0 0.0
1985 7649 0.0 0.0 0.0
1986 8711 0.0 0.0 0.0
1987 600 0.0 0.0 0.0
1990 4392 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8663 0.0 0.0 0.0
1993 3623 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References