X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334250304000

Well Details

Well ID: 0334250304000
Loading map...
Location: 00/04-03-033-25W4/0
Location Alias: 00/04-03-33-25 W4M
Location Alias 2: 00/04-03-033-25 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 25
Section: 03
County/Municipality: Kneehill County
Well Name: BARNWELL HZ TWINING 4-3-33-25
Operator Name: Barnwell of Canada, Limited
License Number: 0467534
License Date: 2014-06-20
License Status: Issued
Spud Date: 2014-09-17
Final Drill Date: 2014-09-30
Well Total Depth: 2621.00 m
Surface Hole Latitude: 51.795525
Surface Hole Longitude: -113.457626

For data sources see[1][2]

Well History

Date Event
2014-06-20 Obtained License
2014-09-19 Surface Casing Operation Performed
2014-09-21 Direction Drilling Operation Performed - Deviate
2014-09-23 Direction Drilling Operation Performed - Horizontal
2014-09-25 Intermediate Casing Operation Performed
2014-09-30 Finished Drilling
2014-09-30 Well Log Performed
2014-09-30 Well Mode changed to Drilled and Cased
2014-10-02 Liner Casing Operation Performed
2014-10-02 Rig Released
2014-10-07 Perforation Treatment Performed - Jet Perforation
2014-10-07 Well Log Performed
2014-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-11-18 Well Began Production
2014-11-18 Well Fluid changed to Crude Oil
2014-11-18 Well Mode changed to Pumping
2015-10-05 Perforation Treatment Performed - Jet Perforation
2015-10-09 Perforation Treatment Performed - Jet Perforation
2015-10-09 Well Log Performed
2015-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-09-17 Chinook Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-09-21 1502.30 Deviate (5 - 79 degrees)
2014-09-23 1788.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-07 Perforation 2585.00 2585.50 20
2014-10-07 Perforation 2351.50 2352.00 20
2014-10-07 Perforation 2327.00 2327.50 20
2014-10-07 Perforation 2300.00 2300.50 20
2014-10-07 Perforation 2277.00 2277.50 20
2014-10-07 Perforation 2251.00 2251.50 20
2014-10-07 Perforation 2229.00 2229.50 20
2014-10-07 Perforation 2202.00 2202.50 20
2014-10-07 Perforation 2175.00 2175.50 20
2014-10-07 Perforation 2153.00 2153.50 20
2014-10-07 Perforation 2102.00 2102.50 20
2014-10-07 Perforation 2565.00 2565.50 20
2014-10-07 Perforation 2077.00 2077.50 20
2014-10-07 Perforation 2056.00 2056.50 20
2014-10-07 Perforation 2035.00 2035.50 20
2014-10-07 Perforation 2012.00 2012.50 20
2014-10-07 Perforation 1987.00 1987.50 20
2014-10-07 Perforation 1962.00 1962.50 20
2014-10-07 Perforation 1938.00 1938.50 20
2014-10-07 Perforation 1914.00 1914.50 20
2014-10-07 Perforation 1886.00 1886.50 20
2014-10-07 Perforation 1847.50 1848.00 20
2014-10-07 Perforation 2545.00 2545.50 20
2014-10-09 Acid Treatment 2585.00 2585.50 0
2014-10-09 Acid Treatment 2565.00 2565.50 0
2014-10-09 Acid Treatment 2545.00 2545.50 0
2014-10-09 Acid Treatment 2512.00 2512.50 0
2014-10-09 Acid Treatment 2487.00 2487.50 0
2014-10-09 Acid Treatment 2461.00 2461.50 0
2014-10-09 Acid Treatment 2437.00 2437.50 0
2014-10-09 Acid Treatment 2409.00 2409.50 0
2014-10-09 Acid Treatment 2382.00 2382.50 0
2014-10-09 Acid Treatment 2351.50 2352.00 0
2014-10-07 Perforation 2512.00 2512.50 20
2014-10-09 Acid Treatment 2327.00 2327.50 0
2014-10-09 Acid Treatment 2300.00 2300.50 0
2014-10-09 Acid Treatment 2277.00 2277.50 0
2014-10-09 Acid Treatment 2251.00 2251.50 0
2014-10-09 Acid Treatment 2229.00 2229.50 0
2014-10-09 Acid Treatment 2202.00 2202.50 0
2014-10-09 Acid Treatment 2175.00 2175.50 0
2014-10-09 Acid Treatment 2153.00 2153.50 0
2014-10-09 Acid Treatment 2102.00 2102.50 0
2014-10-09 Acid Treatment 2077.00 2077.50 0
2014-10-07 Perforation 2487.00 2487.50 20
2014-10-09 Acid Treatment 2056.00 2056.50 0
2014-10-09 Acid Treatment 2035.00 2035.50 0
2014-10-09 Acid Treatment 2012.00 2012.50 0
2014-10-09 Acid Treatment 1987.00 1987.50 0
2014-10-09 Acid Treatment 1962.00 1962.50 0
2014-10-09 Acid Treatment 1938.00 1938.50 0
2014-10-09 Acid Treatment 1914.00 1914.50 0
2014-10-10 Acid Treatment 1886.00 1886.50 0
2014-10-10 Acid Treatment 1847.50 1848.00 0
2015-10-05 Perforation 2313.00 2313.50 20
2014-10-07 Perforation 2461.00 2461.50 20
2015-10-05 Perforation 2287.00 2287.50 20
2015-10-05 Perforation 2264.00 2264.50 20
2015-10-05 Perforation 2240.00 2240.50 20
2015-10-05 Perforation 2216.00 2216.50 20
2015-10-05 Perforation 2190.00 2190.50 20
2015-10-05 Perforation 2164.00 2164.50 20
2015-10-05 Perforation 2137.00 2137.50 20
2015-10-05 Perforation 2089.00 2089.50 20
2015-10-05 Perforation 2066.00 2066.50 20
2015-10-05 Perforation 2045.00 2045.50 20
2014-10-07 Perforation 2437.00 2437.50 20
2015-10-09 Perforation 2022.50 2023.00 20
2015-10-09 Perforation 1975.00 1975.50 20
2015-10-09 Perforation 1925.00 1925.50 20
2015-10-09 Perforation 1999.00 1999.50 20
2015-10-09 Perforation 1950.00 1950.50 20
2015-10-09 Perforation 1900.00 1900.50 20
2015-10-10 Acid Treatment 2313.00 2313.50 0
2015-10-10 Acid Treatment 2287.00 2287.50 0
2015-10-10 Acid Treatment 2264.00 2264.50 0
2015-10-10 Acid Treatment 2240.00 2240.50 0
2014-10-07 Perforation 2409.00 2409.50 20
2015-10-10 Acid Treatment 2216.00 2216.50 0
2015-10-10 Acid Treatment 2190.00 2190.50 0
2015-10-10 Acid Treatment 2164.00 2164.50 0
2015-10-10 Acid Treatment 2137.00 2137.50 0
2015-10-10 Acid Treatment 2089.00 2089.50 0
2015-10-10 Acid Treatment 2066.00 2066.50 0
2015-10-10 Acid Treatment 2045.00 2045.50 0
2015-10-10 Acid Treatment 2022.50 2023.00 0
2015-10-10 Acid Treatment 1975.00 1975.50 0
2015-10-10 Acid Treatment 1925.00 1925.50 0
2014-10-07 Perforation 2382.00 2382.50 20
2015-10-10 Acid Treatment 1999.00 1999.50 0
2015-10-10 Acid Treatment 1950.00 1950.50 0
2015-10-10 Acid Treatment 1900.00 1900.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 997 0.0 0.0 0.0
2015 8040 0.0 0.0 0.0
2016 8410 0.0 0.0 0.0
2017 8728 0.0 0.0 0.0
2018 8662 0.0 0.0 0.0
2019 8579 0.0 0.0 0.0
2020 2153 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-02 No Incident Encountered 0.00 0.00
2014-10-14 No Incident Encountered 0.00 0.00
2014-11-09 No Incident Encountered 0.00 0.00
2015-10-14 No Incident Encountered 0.00 0.00

For data sources see[8]

References