X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334250108000

Well Details

Well ID: 0334250108000
Loading map...
Location: 00/08-01-033-25W4/0
Location Alias: 00/08-01-33-25 W4M
Location Alias 2: 00/08-01-033-25 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 25
Section: 01
County/Municipality: Kneehill County
Well Name: EOG TWINING 8-1-33-25
Operator Name: Pine Cliff Energy Ltd.
License Number: 0021753
License Date: 1961-11-29
License Status: Suspension
Spud Date: 1961-12-04
Final Drill Date: 1961-12-16
Well Total Depth: 1683.10 m
Surface Hole Latitude: 51.800011
Surface Hole Longitude: -113.409542

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-11-29 Obtained License
1961-12-16 Finished Drilling
1961-12-16 Well Mode changed to Drilled and Cased
1961-12-17 Drill Stem Test Performed
1961-12-18 Drill Stem Test Performed
1961-12-20 Production Casing Operation Performed
1961-12-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-27 Perforation Treatment Performed - Jet Perforation
1962-01-06 Well Began Production
1962-01-06 Well Fluid changed to Crude Oil
1962-01-06 Well Mode changed to Pumping
1977-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-16 Perforation Treatment Performed - Jet Perforation
1986-09-16 Well Log Performed
1986-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-16 Perforation Treatment Performed - Jet Perforation
1997-11-16 Well Log Performed
2012-05-01 Well Fluid changed to Crude Oil
2012-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-12-27 Perforation 1663.30 1664.50 7
1961-12-27 Perforation 1668.20 1669.40 7
1961-12-27 Acid Treatment 1663.30 1669.40 0
1977-03-03 Acid Treatment 1663.30 1669.40 0
1986-09-16 Perforation 1662.30 1670.20 13
1986-09-16 Perforation 1651.30 1653.80 13
1986-09-16 Perforation 1655.60 1659.90 13
1986-09-22 Acid Treatment 1651.30 1670.20 0
1997-11-16 Perforation 1625.70 1633.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3122 0.0 0.0 0.0
1968 3887 0.0 0.0 0.0
1969 8460 0.0 0.0 0.0
1970 8275 0.0 0.0 0.0
1971 8749 0.0 0.0 0.0
1972 8550 0.0 0.0 0.0
1973 7587 0.0 0.0 0.0
1974 7137 0.0 0.0 0.0
1975 8114 0.0 0.0 0.0
1976 7740 0.0 0.0 0.0
1977 7874 0.0 0.0 0.0
1978 8395 0.0 0.0 0.0
1979 8411 0.0 0.0 0.0
1980 8240 0.0 0.0 0.0
1981 8213 0.0 0.0 0.0
1982 8296 0.0 0.0 0.0
1983 8535 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 8568 0.0 0.0 0.0
1986 7928 0.0 0.0 0.0
1987 8519 0.0 0.0 0.0
1988 8571 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8707 0.0 0.0 0.0
1991 8687 0.0 0.0 0.0
1992 8735 0.0 0.0 0.0
1993 7919 0.0 0.0 0.0
1994 8639 0.0 0.0 0.0
1995 7619 0.0 0.0 0.0
1996 8519 0.0 0.0 0.0
1997 6478 0.0 0.0 0.0
1999 400 0.0 0.0 0.0
2000 1837 0.0 0.0 0.0
2006 312 0.0 0.0 0.0
2007 1680 0.0 0.0 0.0
2008 3671 0.0 0.0 0.0
2009 1008 0.0 0.0 0.0
2010 864 0.0 0.0 0.0
2011 168 0.0 0.0 0.0

For data sources see[5]

References