X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334242507000

Well Details

Well ID: 0334242507000
Loading map...
Location: 00/07-25-033-24W4/0
Location Alias: 00/07-25-33-24 W4M
Location Alias 2: 00/07-25-033-24 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 24
Section: 25
County/Municipality: Kneehill County
Well Name: ARTIS HZ HUXLEY 7-25-33-24
Operator Name: Artis Exploration Ltd.
License Number: 0489984
License Date: 2018-07-12
License Status: Amended
Spud Date: 2018-07-28
Final Drill Date: 2018-08-06
Well Total Depth: 4812.00 m
Surface Hole Latitude: 51.881472
Surface Hole Longitude: -113.278040

For data sources see[1][2]

Well History

Date Event
2018-07-12 Obtained License
2018-07-28 Surface Casing Operation Performed
2018-07-31 Direction Drilling Operation Performed - Deviate
2018-08-01 Well Log Performed
2018-08-02 Direction Drilling Operation Performed - Horizontal
2018-08-06 Finished Drilling
2018-08-06 Well Log Performed
2018-08-06 Well Mode changed to Drilled and Cased
2018-08-07 Production Casing Operation Performed
2018-08-07 Well Log Performed
2018-08-08 Rig Released
2018-09-18 Well Log Performed
2018-09-20 Well Log Performed
2018-09-28 Perforation Treatment Performed - Jet Perforation
2018-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-29 Perforation Treatment Performed - Jet Perforation
2018-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-30 Perforation Treatment Performed - Jet Perforation
2018-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-01 Perforation Treatment Performed - Jet Perforation
2018-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-02 Perforation Treatment Performed - Jet Perforation
2018-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-03 Perforation Treatment Performed - Jet Perforation
2018-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-04 Perforation Treatment Performed - Jet Perforation
2018-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-05 Perforation Treatment Performed - Jet Perforation
2018-10-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-06 Perforation Treatment Performed - Jet Perforation
2018-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-13 Well Began Production
2018-10-13 Well Fluid changed to Crude Oil
2018-10-13 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-07-31 1953.40 Deviate (5 - 79 degrees)
2018-08-02 2380.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-09-28 Perforation 4751.50 4752.00 7
2018-09-28 Perforation 4650.00 4650.50 7
2018-10-04 Perforation 3390.00 3390.50 7
2018-10-04 Perforation 3372.50 3373.00 7
2018-10-04 Perforation 3355.00 3355.50 7
2018-10-04 Multi-Stage Fracture 3355.00 3408.00 0
2018-10-04 Perforation 3337.50 3338.00 7
2018-10-04 Perforation 3320.00 3320.50 7
2018-10-04 Perforation 3302.50 3303.00 7
2018-10-04 Perforation 3285.00 3285.50 7
2018-10-04 Multi-Stage Fracture 3285.00 3338.00 0
2018-10-04 Perforation 3267.50 3268.00 7
2018-09-28 Perforation 4632.50 4633.00 7
2018-10-04 Perforation 3250.00 3250.50 7
2018-10-04 Perforation 3232.50 3233.00 7
2018-10-04 Perforation 3215.00 3215.50 7
2018-10-04 Multi-Stage Fracture 3215.00 3268.00 0
2018-10-04 Perforation 3197.50 3198.00 7
2018-10-04 Perforation 3180.00 3180.50 7
2018-10-04 Perforation 3162.50 3163.00 7
2018-10-04 Perforation 3145.00 3145.50 7
2018-10-04 Multi-Stage Fracture 3145.00 3198.00 0
2018-10-04 Perforation 3127.50 3128.00 7
2018-09-28 Perforation 4615.00 4615.50 7
2018-10-04 Perforation 3110.00 3110.50 7
2018-10-04 Perforation 3092.50 3093.00 7
2018-10-04 Perforation 3075.00 3075.50 7
2018-10-04 Multi-Stage Fracture 3075.00 3128.00 0
2018-10-04 Perforation 3057.50 3058.00 7
2018-10-04 Perforation 3040.00 3040.50 7
2018-10-04 Perforation 3022.50 3023.00 7
2018-10-04 Perforation 3005.00 3005.50 7
2018-10-04 Multi-Stage Fracture 3005.00 3058.00 0
2018-10-05 Perforation 2987.50 2988.00 7
2018-09-28 Multi-Stage Fracture 4615.00 4668.00 0
2018-10-05 Perforation 2970.00 2970.50 7
2018-10-05 Perforation 2952.50 2953.00 7
2018-10-05 Perforation 2935.00 2935.50 7
2018-10-05 Multi-Stage Fracture 2935.00 2988.00 0
2018-10-05 Perforation 2917.50 2918.00 7
2018-10-05 Perforation 2900.00 2900.50 7
2018-10-05 Perforation 2882.50 2883.00 7
2018-10-05 Perforation 2865.00 2865.50 7
2018-10-05 Multi-Stage Fracture 2865.00 2918.00 0
2018-10-05 Perforation 2847.50 2848.00 7
2018-09-29 Perforation 4597.50 4598.00 7
2018-10-05 Perforation 2830.00 2830.50 7
2018-10-05 Perforation 2812.50 2813.00 7
2018-10-05 Perforation 2795.00 2795.50 7
2018-10-05 Multi-Stage Fracture 2795.00 2848.00 0
2018-10-05 Perforation 2777.50 2778.00 7
2018-10-05 Perforation 2760.00 2760.50 7
2018-10-05 Perforation 2742.50 2743.00 7
2018-10-05 Perforation 2725.00 2725.50 7
2018-10-05 Multi-Stage Fracture 2725.00 2778.00 0
2018-10-05 Perforation 2707.50 2708.00 7
2018-09-29 Perforation 4580.00 4580.50 7
2018-10-05 Perforation 2690.00 2690.50 7
2018-10-05 Perforation 2672.50 2673.00 7
2018-10-05 Perforation 2655.00 2655.50 7
2018-10-05 Multi-Stage Fracture 2655.00 2708.00 0
2018-10-05 Perforation 2637.50 2638.00 7
2018-10-05 Perforation 2620.00 2620.50 7
2018-10-05 Perforation 2602.50 2603.00 7
2018-10-05 Perforation 2585.00 2585.50 7
2018-10-05 Multi-Stage Fracture 2585.00 2638.00 0
2018-10-06 Perforation 2567.50 2568.00 7
2018-09-29 Perforation 4562.50 4563.00 7
2018-10-06 Perforation 2550.00 2550.50 7
2018-10-06 Perforation 2532.50 2533.00 7
2018-10-06 Perforation 2515.00 2515.50 7
2018-10-06 Multi-Stage Fracture 2515.00 2568.00 0
2018-10-06 Perforation 2497.50 2498.00 7
2018-10-06 Perforation 2480.00 2480.50 7
2018-10-06 Perforation 2462.50 2463.00 7
2018-10-06 Perforation 2445.00 2445.50 7
2018-10-06 Multi-Stage Fracture 2445.00 2498.00 0
2018-10-06 Perforation 2432.00 2432.50 7
2018-09-29 Perforation 4545.00 4545.50 7
2018-10-06 Perforation 2427.00 2427.50 7
2018-10-06 Perforation 2422.00 2422.50 7
2018-10-06 Perforation 2417.00 2417.50 7
2018-10-06 Multi-Stage Fracture 2417.00 2432.50 0
2018-09-29 Multi-Stage Fracture 4545.00 4598.00 0
2018-09-29 Perforation 4527.50 4528.00 7
2018-09-28 Perforation 4746.50 4747.00 7
2018-09-29 Perforation 4510.00 4510.50 7
2018-09-29 Perforation 4492.50 4493.00 7
2018-09-29 Perforation 4475.00 4475.50 7
2018-09-29 Multi-Stage Fracture 4475.00 4528.00 0
2018-09-30 Perforation 4457.50 4458.00 7
2018-09-30 Perforation 4440.00 4440.50 7
2018-09-30 Perforation 4422.50 4423.00 7
2018-09-30 Perforation 4405.00 4405.50 7
2018-09-30 Multi-Stage Fracture 4405.00 4458.00 0
2018-09-30 Perforation 4387.50 4388.00 7
2018-09-28 Multi-Stage Fracture 4746.50 4782.60 0
2018-09-30 Perforation 4370.00 4370.50 7
2018-09-30 Perforation 4352.50 4353.00 7
2018-09-30 Perforation 4335.00 4335.50 7
2018-09-30 Multi-Stage Fracture 4335.00 4388.00 0
2018-09-30 Perforation 4317.50 4318.00 7
2018-09-30 Perforation 4300.00 4300.50 7
2018-09-30 Perforation 4282.50 4283.00 7
2018-09-30 Perforation 4265.00 4265.50 7
2018-09-30 Multi-Stage Fracture 4265.00 4318.00 0
2018-10-01 Perforation 4247.50 4248.00 7
2018-09-28 Perforation 4733.00 4733.50 7
2018-10-01 Perforation 4230.00 4230.50 7
2018-10-01 Perforation 4212.50 4213.00 7
2018-10-01 Perforation 4195.00 4195.50 7
2018-10-01 Multi-Stage Fracture 4195.00 4248.00 0
2018-10-01 Perforation 4177.50 4178.00 7
2018-10-01 Perforation 4160.00 4160.50 7
2018-10-01 Perforation 4142.50 4143.00 7
2018-10-01 Perforation 4125.00 4125.50 7
2018-10-01 Multi-Stage Fracture 4125.00 4178.00 0
2018-10-02 Perforation 4107.50 4108.00 7
2018-09-28 Perforation 4720.00 4720.50 7
2018-10-02 Perforation 4090.00 4090.50 7
2018-10-02 Perforation 4072.50 4073.00 7
2018-10-02 Perforation 4055.00 4055.50 7
2018-10-02 Multi-Stage Fracture 4055.00 4108.00 0
2018-10-02 Perforation 4037.50 4038.00 7
2018-10-02 Perforation 4020.00 4020.50 7
2018-10-02 Perforation 4002.50 4003.00 7
2018-10-02 Perforation 3985.00 3985.50 7
2018-10-02 Multi-Stage Fracture 3985.00 4038.00 0
2018-10-02 Perforation 3967.50 3968.00 7
2018-09-28 Perforation 4702.50 4703.00 7
2018-10-02 Perforation 3950.00 3950.50 7
2018-10-02 Perforation 3932.50 3933.00 7
2018-10-02 Perforation 3915.00 3915.50 7
2018-10-02 Multi-Stage Fracture 3915.00 3968.00 0
2018-10-02 Perforation 3897.50 3898.00 7
2018-10-02 Perforation 3880.00 3880.50 7
2018-10-02 Perforation 3862.50 3863.00 7
2018-10-02 Perforation 3845.00 3845.50 7
2018-10-02 Multi-Stage Fracture 3845.00 3898.00 0
2018-10-03 Perforation 3827.50 3828.00 7
2018-09-28 Perforation 4685.00 4685.50 7
2018-10-03 Perforation 3810.00 3810.50 7
2018-10-03 Perforation 3792.50 3793.00 7
2018-10-03 Perforation 3775.00 3775.50 7
2018-10-03 Multi-Stage Fracture 3775.00 3828.00 0
2018-10-03 Perforation 3757.50 3758.00 7
2018-10-03 Perforation 3740.00 3740.50 7
2018-10-03 Perforation 3722.50 3723.00 7
2018-10-03 Perforation 3705.00 3705.50 7
2018-10-03 Multi-Stage Fracture 3705.00 3758.00 0
2018-10-03 Perforation 3687.50 3688.00 7
2018-09-28 Multi-Stage Fracture 4685.00 4733.50 0
2018-10-03 Perforation 3670.00 3670.50 7
2018-10-03 Perforation 3652.50 3653.00 7
2018-10-03 Perforation 3635.00 3635.50 7
2018-10-03 Multi-Stage Fracture 3635.00 3688.00 0
2018-10-03 Perforation 3617.50 3618.00 7
2018-10-03 Perforation 3600.00 3600.50 7
2018-10-03 Perforation 3582.50 3583.00 7
2018-10-03 Perforation 3565.00 3565.50 7
2018-10-03 Multi-Stage Fracture 3565.00 3618.00 0
2018-10-03 Perforation 3547.50 3548.00 7
2018-09-28 Perforation 4667.50 4668.00 7
2018-10-03 Perforation 3530.00 3530.50 7
2018-10-03 Perforation 3512.50 3513.00 7
2018-10-03 Perforation 3495.00 3495.50 7
2018-10-03 Multi-Stage Fracture 3495.00 3548.00 0
2018-10-03 Perforation 3477.50 3478.00 7
2018-10-03 Perforation 3460.00 3460.50 7
2018-10-03 Perforation 3442.50 3443.00 7
2018-10-03 Perforation 3425.00 3425.50 7
2018-10-03 Multi-Stage Fracture 3425.00 3478.00 0
2018-10-04 Perforation 3407.50 3408.00 7

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-28 2018-10-06 2,221 30,835 N/A
2 2018-10-03 2018-10-06 2,221 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 0.316 N/A
water Not Available 100 52.7375 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 6.9442 N/A
Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 4.0302 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.5037 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0213 N/A
dibromoacetonitrile 3252-43-5 100 0.0213 N/A
non-hazardous ingredients Not Available 100 0.0213 N/A
polyethylene glycol 25322-68-3 100 0.0213 N/A
sodium bromide 7647-15-6 100 0.0213 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0062 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.0021 N/A
potassium iodide 7681-11-0 100 0.0021 N/A
propargyl alcohol 107-19-7 100 0.0021 N/A
propargyl alcohol derivative 9393 100 0.0021 N/A
Bulk WXB-17 Trican Crosslinker monoethanolamine 141-43-5 100 0.0831 N/A
monoethanolamine borate 26038-87-9 100 0.0831 N/A
non-hazardous ingredients Not Available 100 0.0831 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0038 N/A
propylene glycol 57-55-6 100 0.0038 N/A
Bulk FR-24 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0559 N/A
non-hazardous ingredients Not Available 100 0.0559 N/A
WG-111DA Trican Gelling Agent fumaric acid 110-17-8 100 0.1141 N/A
guar gum 9000-30-0 100 0.1141 N/A
Bulk SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0421 N/A
Bulk S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.082 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.082 N/A
methanol 67-56-1 100 0.082 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.082 N/A
non-hazardous ingredients Not Available 100 0.082 N/A
2 pH- 2 Trican Buffer acetic acid 64-19-7 100 0.004 N/A
water Not Available 100 0.004 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-09-23 2018-10-01 Surface Water - Lake 29676
2018-09-26 2018-09-27 Recycled Fracturing Water (treated at well site) 2175

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 860 0.0 0.0 0.0
2019 8282 0.0 0.0 0.0
2020 2155 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-02 No Incident Encountered 0.00 0.00
2018-09-28 No Incident Encountered 0.00 0.00

For data sources see[9]

References