X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334241906000

Well Details

Well ID: 0334241906000
Loading map...
Location: 00/06-19-033-24W4/0
Location Alias: 00/06-19-33-24 W4M
Location Alias 2: 00/06-19-033-24 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 24
Section: 19
County/Municipality: Kneehill County
Well Name: EOG TWINING 6-19-33-24
Operator Name: Pine Cliff Energy Ltd.
License Number: 0022032
License Date: 1962-02-01
License Status: Issued
Spud Date: 1962-02-02
Final Drill Date: 1962-02-13
Well Total Depth: 1681.00 m
Surface Hole Latitude: 51.843633
Surface Hole Longitude: -113.397539

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-02-01 Obtained License
1962-02-13 Finished Drilling
1962-02-15 Drill Stem Test Performed
1962-02-16 Production Casing Operation Performed
1962-02-16 Well Mode changed to Drilled and Cased
1976-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-08 Perforation Treatment Performed - Jet Perforation
1977-01-21 Perforation Treatment Performed - Jet Perforation
1977-01-21 Well Mode changed to Drilled and Cased
1977-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-11-06 Perforation Treatment Performed - Cement Squeeze
1981-11-06 Well Mode changed to Drilled and Cased
1981-11-11 Perforation Treatment Performed - Jet Perforation
1981-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-11-26 Well Began Production
1981-11-26 Well Fluid changed to Crude Oil
1981-11-26 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-12-08 Perforation 1653.20 1657.20 10
1976-12-08 Perforation 1660.20 1662.10 10
1976-12-08 Acid Treatment 1653.20 1662.10 0
1977-01-21 Perforation 1630.40 1631.60 7
1977-01-22 Acid Treatment 1630.40 1631.60 0
1981-11-06 Cement Squeeze 1630.40 1631.60 0
1981-11-11 Perforation 1660.20 1662.20 13
1981-11-12 Acid Treatment 1660.20 1662.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1981 456 0.0 0.0 0.0
1982 6716 0.0 0.0 0.0
1983 8229 0.0 0.0 0.0
1984 6943 0.0 0.0 0.0
1985 7146 0.0 0.0 0.0
1986 5224 0.0 0.0 0.0
1987 6768 0.0 0.0 0.0
1988 6046 0.0 0.0 0.0
1989 4729 0.0 0.0 0.0
1990 4248 0.0 0.0 0.0
1991 4248 0.0 0.0 0.0
1992 4156 0.0 0.0 0.0
1993 6294 0.0 0.0 0.0
1994 8657 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 7417 0.0 0.0 0.0
1998 5567 0.0 0.0 0.0
1999 5630 0.0 0.0 0.0
2000 3963 0.0 0.0 0.0
2001 3335 0.0 0.0 0.0
2002 3822 0.0 0.0 0.0
2003 7765 0.0 0.0 0.0
2004 7466 0.0 0.0 0.0
2005 8562 0.0 0.0 0.0
2006 7078 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8518 0.0 0.0 0.0
2009 8756 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8600 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 6908 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References