X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334240509000

Well Details

Well ID: 0334240509000
Loading map...
Location: 00/09-05-033-24W4/0
Location Alias: 00/09-05-33-24 W4M
Location Alias 2: 00/09-05-033-24 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 24
Section: 05
County/Municipality: Kneehill County
Well Name: ARTIS HZ TWINING 9-5-33-24
Operator Name: Artis Exploration Ltd.
License Number: 0484951
License Date: 2017-08-10
License Status: Issued
Spud Date: 2017-08-17
Final Drill Date: 2017-08-28
Well Total Depth: 4785.00 m
Surface Hole Latitude: 51.778413
Surface Hole Longitude: -113.361647

For data sources see[1][2]

Well History

Date Event
2017-08-10 Obtained License
2017-08-18 Surface Casing Operation Performed
2017-08-21 Direction Drilling Operation Performed - Deviate
2017-08-24 Direction Drilling Operation Performed - Horizontal
2017-08-24 Well Log Performed
2017-08-28 Finished Drilling
2017-08-28 Well Log Performed
2017-08-28 Well Mode changed to Drilled and Cased
2017-08-29 Production Casing Operation Performed
2017-08-30 Rig Released
2017-09-25 Well Log Performed
2017-10-06 Perforation Treatment Performed - Jet Perforation
2017-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-07 Perforation Treatment Performed - Jet Perforation
2017-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-08 Perforation Treatment Performed - Jet Perforation
2017-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-09 Perforation Treatment Performed - Jet Perforation
2017-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-10 Perforation Treatment Performed - Jet Perforation
2017-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-11 Perforation Treatment Performed - Jet Perforation
2017-10-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-12 Perforation Treatment Performed - Jet Perforation
2017-10-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-13 Perforation Treatment Performed - Jet Perforation
2017-10-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-14 Perforation Treatment Performed - Jet Perforation
2017-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-27 Well Began Production
2017-10-27 Well Fluid changed to Crude Oil
2017-10-27 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-08-17 Trinidad Drilling Ltd. 418 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-21 1925.30 Deviate (5 - 79 degrees)
2017-08-24 2356.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-10-06 Multi-Stage Fracture 4707.00 4733.00 0
2017-10-07 Perforation 4587.00 4588.00 11
2017-10-10 Perforation 3801.00 3802.00 11
2017-10-10 Perforation 3791.00 3792.00 11
2017-10-10 Perforation 3781.00 3782.00 11
2017-10-10 Multi-Stage Fracture 3781.00 3822.00 0
2017-10-10 Perforation 3771.00 3772.00 11
2017-10-10 Perforation 3761.00 3762.00 11
2017-10-10 Perforation 3751.00 3752.00 11
2017-10-10 Perforation 3741.00 3742.00 11
2017-10-10 Perforation 3731.00 3732.00 11
2017-10-11 Multi-Stage Fracture 3731.00 3772.00 0
2017-10-07 Perforation 4572.00 4573.00 11
2017-10-11 Perforation 3721.00 3722.00 11
2017-10-11 Perforation 3711.00 3712.00 11
2017-10-11 Perforation 3701.00 3702.00 11
2017-10-11 Perforation 3691.00 3692.00 11
2017-10-11 Perforation 3681.00 3682.00 11
2017-10-11 Multi-Stage Fracture 3681.00 3722.00 0
2017-10-11 Perforation 3671.00 3672.00 11
2017-10-11 Perforation 3661.00 3662.00 11
2017-10-11 Perforation 3651.00 3652.00 11
2017-10-11 Perforation 3641.00 3642.00 11
2017-10-07 Perforation 4557.00 4558.00 11
2017-10-11 Perforation 3631.00 3632.00 11
2017-10-11 Multi-Stage Fracture 3631.00 3672.00 0
2017-10-11 Perforation 3621.00 3622.00 11
2017-10-11 Perforation 3611.00 3612.00 11
2017-10-11 Perforation 3601.00 3602.00 11
2017-10-11 Perforation 3591.00 3592.00 11
2017-10-11 Perforation 3581.00 3582.00 11
2017-10-11 Multi-Stage Fracture 3581.00 3622.00 0
2017-10-11 Perforation 3571.00 3572.00 11
2017-10-11 Perforation 3561.00 3562.00 11
2017-10-07 Multi-Stage Fracture 4557.00 4618.00 0
2017-10-11 Perforation 3551.00 3552.00 11
2017-10-11 Perforation 3541.00 3542.00 11
2017-10-11 Perforation 3531.00 3532.00 11
2017-10-11 Multi-Stage Fracture 3531.00 3572.00 0
2017-10-11 Perforation 3521.00 3522.00 11
2017-10-11 Perforation 3511.00 3512.00 11
2017-10-11 Perforation 3501.00 3502.00 11
2017-10-11 Perforation 3491.00 3492.00 11
2017-10-11 Perforation 3481.00 3482.00 11
2017-10-11 Multi-Stage Fracture 3481.00 3522.00 0
2017-10-07 Perforation 4542.00 4543.00 11
2017-10-12 Perforation 3471.00 3472.00 11
2017-10-12 Perforation 3461.00 3462.00 11
2017-10-12 Perforation 3451.00 3452.00 11
2017-10-12 Perforation 3441.00 3442.00 11
2017-10-12 Perforation 3431.00 3432.00 11
2017-10-12 Multi-Stage Fracture 3431.00 3472.00 0
2017-10-12 Perforation 3421.00 3422.00 11
2017-10-12 Perforation 3411.00 3412.00 11
2017-10-12 Perforation 3401.00 3402.00 11
2017-10-12 Perforation 3391.00 3392.00 11
2017-10-07 Perforation 4527.00 4528.00 11
2017-10-12 Perforation 3381.00 3382.00 11
2017-10-12 Multi-Stage Fracture 3381.00 3422.00 0
2017-10-12 Perforation 3371.00 3372.00 11
2017-10-12 Perforation 3361.00 3362.00 11
2017-10-12 Perforation 3351.00 3352.00 11
2017-10-12 Perforation 3341.00 3342.00 11
2017-10-12 Perforation 3331.00 3332.00 11
2017-10-12 Multi-Stage Fracture 3331.00 3372.00 0
2017-10-12 Perforation 3321.00 3322.00 11
2017-10-12 Perforation 3311.00 3312.00 11
2017-10-07 Perforation 4512.00 4513.00 11
2017-10-12 Perforation 3301.00 3302.00 11
2017-10-12 Perforation 3291.00 3292.00 11
2017-10-12 Perforation 3281.00 3282.00 11
2017-10-12 Multi-Stage Fracture 3281.00 3322.00 0
2017-10-12 Perforation 3271.00 3272.00 11
2017-10-12 Perforation 3261.00 3262.00 11
2017-10-12 Perforation 3251.00 3252.00 11
2017-10-12 Perforation 3241.00 3242.00 11
2017-10-12 Perforation 3231.00 3232.00 11
2017-10-12 Multi-Stage Fracture 3231.00 3272.00 0
2017-10-07 Perforation 4497.00 4498.00 11
2017-10-12 Perforation 3221.00 3222.00 11
2017-10-12 Perforation 3211.00 3212.00 11
2017-10-12 Perforation 3201.00 3202.00 11
2017-10-12 Perforation 3191.00 3192.00 11
2017-10-12 Perforation 3181.00 3182.00 11
2017-10-13 Multi-Stage Fracture 3181.00 3222.00 0
2017-10-13 Perforation 3171.00 3172.00 11
2017-10-13 Perforation 3161.00 3162.00 11
2017-10-13 Perforation 3151.00 3152.00 11
2017-10-13 Perforation 3141.00 3142.00 11
2017-10-07 Perforation 4482.00 4483.00 11
2017-10-13 Perforation 3131.00 3132.00 11
2017-10-13 Multi-Stage Fracture 3131.00 3172.00 0
2017-10-13 Perforation 3121.00 3122.00 11
2017-10-13 Perforation 3111.00 3112.00 11
2017-10-13 Perforation 3101.00 3102.00 11
2017-10-13 Perforation 3091.00 3092.00 11
2017-10-13 Perforation 3081.00 3082.00 11
2017-10-13 Multi-Stage Fracture 3081.00 3122.00 0
2017-10-13 Perforation 3071.00 3072.00 11
2017-10-13 Perforation 3061.00 3062.00 11
2017-10-08 Multi-Stage Fracture 4482.00 4543.00 0
2017-10-13 Perforation 3051.00 3052.00 11
2017-10-13 Perforation 3041.00 3042.00 11
2017-10-13 Perforation 3031.00 3032.00 11
2017-10-13 Multi-Stage Fracture 3031.00 3072.00 0
2017-10-13 Perforation 3021.00 3022.00 11
2017-10-13 Perforation 3011.00 3012.00 11
2017-10-13 Perforation 3001.00 3002.00 11
2017-10-13 Perforation 2991.00 2992.00 11
2017-10-13 Perforation 2981.00 2982.00 11
2017-10-13 Multi-Stage Fracture 2981.00 3022.00 0
2017-10-06 Perforation 4689.00 4690.00 11
2017-10-08 Perforation 4472.00 4473.00 11
2017-10-13 Perforation 2971.00 2972.00 11
2017-10-13 Perforation 2961.00 2962.00 11
2017-10-13 Perforation 2951.00 2952.00 11
2017-10-13 Perforation 2941.00 2942.00 11
2017-10-13 Perforation 2931.00 2932.00 11
2017-10-14 Multi-Stage Fracture 2931.00 2972.00 0
2017-10-14 Perforation 2921.00 2922.00 11
2017-10-14 Perforation 2911.00 2912.00 11
2017-10-14 Perforation 2901.00 2902.00 11
2017-10-14 Perforation 2891.00 2892.00 11
2017-10-08 Perforation 4462.00 4463.00 11
2017-10-14 Perforation 2881.00 2882.00 11
2017-10-14 Multi-Stage Fracture 2881.00 2922.00 0
2017-10-14 Perforation 2871.00 2872.00 11
2017-10-14 Perforation 2861.00 2862.00 11
2017-10-14 Perforation 2851.00 2852.00 11
2017-10-14 Perforation 2841.00 2842.00 11
2017-10-14 Perforation 2831.00 2832.00 11
2017-10-14 Multi-Stage Fracture 2831.00 2872.00 0
2017-10-14 Perforation 2821.00 2822.00 11
2017-10-14 Perforation 2811.00 2812.00 11
2017-10-08 Perforation 4452.00 4453.00 11
2017-10-14 Perforation 2801.00 2802.00 11
2017-10-14 Perforation 2791.00 2792.00 11
2017-10-14 Perforation 2781.00 2782.00 11
2017-10-14 Multi-Stage Fracture 2781.00 2822.00 0
2017-10-14 Perforation 2771.00 2772.00 11
2017-10-14 Perforation 2761.00 2762.00 11
2017-10-14 Perforation 2751.00 2752.00 11
2017-10-14 Perforation 2741.00 2742.00 11
2017-10-14 Perforation 2731.00 2732.00 11
2017-10-14 Multi-Stage Fracture 2731.00 2772.00 0
2017-10-08 Perforation 4442.00 4443.00 11
2017-10-14 Perforation 2721.00 2722.00 11
2017-10-14 Perforation 2711.00 2712.00 11
2017-10-14 Perforation 2701.00 2702.00 11
2017-10-14 Perforation 2691.00 2692.00 11
2017-10-14 Perforation 2681.00 2682.00 11
2017-10-14 Multi-Stage Fracture 2681.00 2722.00 0
2017-10-08 Perforation 4432.00 4433.00 11
2017-10-08 Multi-Stage Fracture 4432.00 4473.00 0
2017-10-08 Perforation 4422.00 4423.00 11
2017-10-08 Perforation 4412.00 4413.00 11
2017-10-08 Perforation 4402.00 4403.00 11
2017-10-08 Perforation 4392.00 4393.00 11
2017-10-06 Perforation 4677.00 4678.00 11
2017-10-08 Perforation 4382.00 4383.00 11
2017-10-08 Multi-Stage Fracture 4382.00 4423.00 0
2017-10-08 Perforation 4372.00 4373.00 11
2017-10-08 Perforation 4362.00 4363.00 11
2017-10-08 Perforation 4352.00 4353.00 11
2017-10-08 Perforation 4342.00 4343.00 11
2017-10-08 Perforation 4332.00 4333.00 11
2017-10-08 Multi-Stage Fracture 4332.00 4373.00 0
2017-10-08 Perforation 4322.00 4323.00 11
2017-10-08 Perforation 4312.00 4313.00 11
2017-10-06 Perforation 4662.00 4663.00 11
2017-10-08 Perforation 4302.00 4303.00 11
2017-10-08 Perforation 4292.00 4293.00 11
2017-10-08 Perforation 4282.00 4283.00 11
2017-10-09 Multi-Stage Fracture 4282.00 4323.00 0
2017-10-09 Perforation 4272.00 4273.00 11
2017-10-09 Perforation 4262.00 4263.00 11
2017-10-09 Perforation 4252.00 4253.00 11
2017-10-09 Perforation 4242.00 4243.00 11
2017-10-09 Perforation 4232.00 4233.00 11
2017-10-09 Multi-Stage Fracture 4232.00 4273.00 0
2017-10-06 Perforation 4647.00 4648.00 11
2017-10-09 Perforation 4222.00 4223.00 11
2017-10-09 Perforation 4212.00 4213.00 11
2017-10-09 Perforation 4202.00 4203.00 11
2017-10-09 Perforation 4192.00 4193.00 11
2017-10-09 Perforation 4182.00 4183.00 11
2017-10-09 Multi-Stage Fracture 4182.00 4223.00 0
2017-10-09 Perforation 4172.00 4173.00 11
2017-10-09 Perforation 4162.00 4163.00 11
2017-10-09 Perforation 4152.00 4153.00 11
2017-10-09 Perforation 4142.00 4143.00 11
2017-10-06 Perforation 4632.00 4633.00 11
2017-10-09 Perforation 4132.00 4133.00 11
2017-10-09 Multi-Stage Fracture 4132.00 4173.00 0
2017-10-09 Perforation 4122.00 4123.00 11
2017-10-09 Perforation 4111.00 4112.00 11
2017-10-09 Perforation 4101.00 4102.00 11
2017-10-09 Perforation 4091.00 4092.00 11
2017-10-09 Perforation 4081.00 4082.00 11
2017-10-09 Multi-Stage Fracture 4081.00 4123.00 0
2017-10-09 Perforation 4071.00 4072.00 11
2017-10-09 Perforation 4061.00 4062.00 11
2017-10-07 Multi-Stage Fracture 4632.00 4690.00 0
2017-10-09 Perforation 4051.00 4052.00 11
2017-10-09 Perforation 4041.00 4042.00 11
2017-10-09 Perforation 4031.00 4032.00 11
2017-10-10 Multi-Stage Fracture 4031.00 4072.00 0
2017-10-10 Perforation 4021.00 4022.00 11
2017-10-10 Perforation 4011.00 4012.00 11
2017-10-10 Perforation 4001.00 4002.00 11
2017-10-10 Perforation 3991.00 3992.00 11
2017-10-10 Perforation 3981.00 3982.00 11
2017-10-10 Multi-Stage Fracture 3981.00 4022.00 0
2017-10-07 Perforation 4617.00 4618.00 11
2017-10-10 Perforation 3971.00 3972.00 11
2017-10-10 Perforation 3961.00 3962.00 11
2017-10-10 Perforation 3951.00 3952.00 11
2017-10-10 Perforation 3941.00 3942.00 11
2017-10-10 Perforation 3931.00 3932.00 11
2017-10-10 Multi-Stage Fracture 3931.00 3972.00 0
2017-10-10 Perforation 3921.00 3922.00 11
2017-10-10 Perforation 3911.00 3912.00 11
2017-10-10 Perforation 3901.00 3902.00 11
2017-10-10 Perforation 3891.00 3892.00 11
2017-10-07 Perforation 4602.00 4603.00 11
2017-10-10 Perforation 3881.00 3882.00 11
2017-10-10 Multi-Stage Fracture 3881.00 3922.00 0
2017-10-10 Perforation 3871.00 3872.00 11
2017-10-10 Perforation 3861.00 3862.00 11
2017-10-10 Perforation 3851.00 3852.00 11
2017-10-10 Perforation 3841.00 3842.00 11
2017-10-10 Perforation 3831.00 3832.00 11
2017-10-10 Multi-Stage Fracture 3831.00 3872.00 0
2017-10-10 Perforation 3821.00 3822.00 11
2017-10-10 Perforation 3811.00 3812.00 11

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-06 2017-10-14 2,241 30,688 N/A
2 2017-10-07 2017-10-14 2,241 0 N/A
3 2017-10-07 2017-10-07 2,241 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.1102 N/A
40/70 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 4.4864 N/A
50/140 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 0.5644 N/A
15% HCL Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 1.1289 N/A
Water 7732-18-5 100 1.1289 N/A
Aqucar 742 (Biocide) Step Energy Services Bactericide/Biocide Ethanol 64-17-5 100 0.0174 N/A
Glutaraldehyde 111-30-8 100 0.0174 N/A
Methanol 67-56-1 100 0.0173 N/A
Non-Hazardous Ingredients Not Available 100 0.0174 N/A
Quaternary ammonium compounds.
benzyl-C12-16-alkyldimethyl. chlorides
68424-85-1 100 0.0174 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0085 N/A
Methyl Alcohol 67-56-1 100 0.0085 N/A
Non-Hazardous Ingredients Not Available 100 0.0085 N/A
SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0043 N/A
Cured Acrylic Resin Not Available 100 0.0043 N/A
Non-Hazardous Ingredients Not Available 100 0.0043 N/A
SCI-9 (Corrosion Inhibitor) Step Energy Services Corrosion Inhibitor Acetophenone. thiourea. formaldehyde polymer 68527-49-1 100 0.0033 N/A
Butyl cellosolve 111-76-2 100 0.0033 N/A
Cinnamaldehyde 104-55-2 100 0.0033 N/A
Ethylene Glycol 107-21-1 100 0.0033 N/A
Formic Acid 64-18-6 100 0.0033 N/A
Methanol 67-56-1 100 0.0033 N/A
Polyether Not Available 100 0.0033 N/A
SBX-7 (Crosslinker) Step Energy Services Crosslinker Non-Hazardous Ingredients Not Available 100 0.0662 N/A
Petroleum Distillates. hydrotreated light 64742-47-8 100 0.0662 N/A
SFR-102S (Friction Reducer) STEP Energy Services Friction Reducer Distillates. Petroleum. Hydrotreated Light 64742-47-8 100 0.0545 N/A
Proprietary Trade Secret 100 0.0545 N/A
SWG-101 (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.059 N/A
SIR-2 (Iron Reducer) Step Energy Services Iron Control Copper Chloride (CuCl2) 7447-39-4 100 0.0033 N/A
Ethanol. 2-amino- 141-43-5 100 0.0033 N/A
Ethanol. 2-mecapto 60-24-2 100 0.0033 N/A
SAS-4 (Anti-Sludge) Step Energy Services Surfactant 1.1' - Oxybisbenzene. tetrapropylene dervis. sulfonated 119345-03-8 100 0.0056 N/A
Alkylbenzene sulfonic acid 27176-87-0 100 0.0056 N/A
Methanol 67-56-1 100 0.0056 N/A
Xylene 1330-20-7 100 0.0056 N/A
2 30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 7.6761 N/A
3 SWG-101L (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.1947 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.1947 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-30 2017-10-14 Waste Water - Municipal 32283

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 456 0.0 0.0 0.0
2018 7748 0.0 0.0 0.0
2019 8471 0.0 0.0 0.0
2020 2020 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-24 No Incident Encountered 0.00 0.00
2017-10-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References