X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334240302000

Well Details

Well ID: 0334240302000
Loading map...
Location: 00/02-03-033-24W4/0
Location Alias: 00/02-03-33-24 W4M
Location Alias 2: 00/02-03-033-24 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 24
Section: 03
County/Municipality: Kneehill County
Well Name: EMBER SD TWINING 2-3-33-24
Operator Name: Ember Resources Inc.
License Number: 0425348
License Date: 2010-11-01
License Status: Issued
Spud Date: 2010-12-28
Final Drill Date: 2010-12-29
Well Total Depth: 1081.00 m
Surface Hole Latitude: 51.800911
Surface Hole Longitude: -113.316349

For data sources see[1][2]

Well History

Date Event
2010-11-01 Obtained License
2010-12-28 Direction Drilling Operation Performed - Deviate
2010-12-28 Surface Casing Operation Performed
2010-12-29 Finished Drilling
2010-12-29 Well Mode changed to Drilled and Cased
2010-12-30 Production Casing Operation Performed
2010-12-30 Rig Released
2011-01-07 Well Log Performed
2011-01-23 Perforation Treatment Performed - Jet Perforation
2011-02-03 Perforation Treatment Performed - Fractured
2011-02-06 Well Fluid changed to Coalbed Methane-Coals Only
2011-02-06 Well Mode changed to Testing
2011-02-17 Well Began Production
2011-02-17 Well Fluid changed to Coalbed Methane-Coals Only
2011-02-17 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-28 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-23 Perforation 534.00 535.70 13
2011-01-23 Perforation 412.00 412.90 13
2011-01-23 Perforation 393.50 393.90 13
2011-01-23 Perforation 395.80 396.50 13
2011-01-23 Perforation 459.80 460.90 13
2011-01-23 Perforation 468.10 468.70 13
2011-01-23 Perforation 444.30 445.00 13
2011-01-23 Perforation 457.10 457.50 13
2011-01-23 Perforation 582.70 584.40 13
2011-01-23 Perforation 675.10 676.40 13
2011-01-23 Perforation 665.50 666.90 13
2011-01-23 Perforation 541.30 542.30 13
2011-01-23 Perforation 664.20 664.80 13
2011-01-23 Perforation 680.80 682.20 13
2011-01-23 Perforation 712.50 713.30 13
2011-01-23 Perforation 696.20 697.40 13
2011-01-23 Perforation 689.60 690.20 13
2011-01-23 Perforation 651.40 652.50 13
2011-01-23 Perforation 592.70 593.70 13
2011-01-23 Perforation 589.00 589.30 13
2011-01-23 Perforation 585.60 585.90 13
2011-01-23 Perforation 597.00 597.50 13
2011-01-23 Perforation 479.00 481.50 13
2011-01-23 Perforation 629.20 630.10 13
2011-01-23 Perforation 640.30 641.10 13
2011-01-23 Perforation 598.20 598.50 13
2011-02-03 Fracture 393.50 690.20 0
2011-02-03 Fracture 696.20 713.30 0
2011-01-23 Perforation 528.90 530.30 13
2011-01-23 Perforation 571.30 571.60 13
2011-01-23 Perforation 579.40 580.40 13
2011-01-23 Perforation 549.80 550.80 13
2011-01-23 Perforation 551.70 552.00 13
2011-01-23 Perforation 406.50 407.40 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7630 0.0 0.0 0.0
2012 8679 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 8699 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8770 0.0 0.0 0.0
2017 8572 0.0 0.0 0.0
2018 8749 0.0 0.0 0.0
2019 8749 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[6]

References