If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334240105023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.800521,"lon":-113.282881,"icon":""}]} |
Location: 02/05-01-033-24W4/3 | |
Location Alias: 02/05-01-33-24 W4M | |
Location Alias 2: 02/05-01-033-24 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 24 | |
Section: 01 | |
County/Municipality: Kneehill County | |
Well Name: EMBER 102 TWINING 5-1-33-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0397367 | |
License Date: 2008-06-09 | |
License Status: Issued | |
Spud Date: 2009-01-10 | |
Final Drill Date: 2009-01-11 | |
Well Total Depth: 652.00 m | |
Surface Hole Latitude: 51.800521 | |
Surface Hole Longitude: -113.282881 |
Date | Event |
---|---|
2008-06-09 | Obtained License |
2009-01-10 | Surface Casing Operation Performed |
2009-01-11 | Finished Drilling |
2009-01-11 | Production Casing Operation Performed |
2009-01-11 | Rig Released |
2009-01-11 | Well Mode changed to Drilled and Cased |
2009-01-13 | Well Log Performed |
2009-02-05 | Perforation Treatment Performed - Jet Perforation |
2009-02-05 | Well Log Performed |
2009-02-11 | Perforation Treatment Performed - Jet Perforation |
2009-02-15 | Perforation Treatment Performed - Fractured |
2009-02-19 | Well Structure changed to Commingled |
2009-09-15 | Perforation Treatment Performed - Jet Perforation |
2009-09-20 | Perforation Treatment Performed - Fractured |
2009-09-22 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-05 | Perforation | 623.00 | 624.00 | 20 |
2009-02-11 | Perforation | 472.60 | 473.10 | 13 |
2009-02-11 | Perforation | 566.00 | 566.50 | 13 |
2009-02-11 | Perforation | 556.90 | 558.40 | 13 |
2009-02-11 | Perforation | 577.80 | 578.30 | 13 |
2009-02-11 | Perforation | 574.50 | 575.00 | 13 |
2009-02-11 | Perforation | 530.90 | 531.90 | 13 |
2009-02-11 | Perforation | 485.50 | 486.00 | 13 |
2009-02-11 | Perforation | 553.20 | 554.20 | 13 |
2009-02-11 | Perforation | 544.90 | 545.40 | 13 |
2009-02-15 | Fracture | 453.00 | 454.00 | 0 |
2009-02-11 | Perforation | 433.90 | 434.40 | 13 |
2009-02-15 | Fracture | 406.70 | 578.30 | 0 |
2009-09-15 | Perforation | 247.50 | 248.00 | 13 |
2009-09-15 | Perforation | 296.30 | 296.80 | 13 |
2009-09-15 | Perforation | 330.00 | 330.50 | 13 |
2009-09-15 | Perforation | 622.00 | 626.00 | 13 |
2009-09-15 | Perforation | 583.70 | 584.20 | 13 |
2009-09-15 | Perforation | 238.00 | 239.00 | 13 |
2009-09-15 | Perforation | 482.40 | 482.90 | 13 |
2009-09-15 | Perforation | 483.70 | 484.20 | 13 |
2009-09-15 | Perforation | 520.80 | 521.30 | 13 |
2009-02-11 | Perforation | 427.90 | 428.90 | 13 |
2009-09-15 | Perforation | 368.20 | 369.20 | 13 |
2009-09-15 | Perforation | 360.90 | 361.40 | 13 |
2009-09-15 | Perforation | 379.20 | 379.70 | 13 |
2009-09-20 | Fracture | 622.00 | 626.00 | 0 |
2009-09-20 | Fracture | 238.00 | 521.30 | 0 |
2009-09-20 | Fracture | 583.70 | 584.20 | 0 |
2009-02-11 | Perforation | 468.00 | 468.50 | 13 |
2009-02-11 | Perforation | 456.90 | 457.40 | 13 |
2009-02-11 | Perforation | 406.70 | 407.20 | 13 |
2009-02-11 | Perforation | 453.00 | 454.00 | 13 |
2009-02-11 | Perforation | 424.10 | 425.10 | 13 |
2009-02-11 | Perforation | 418.80 | 419.80 | 13 |
For data sources see[4]