If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334231814000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.837973,"lon":-113.253651,"icon":""}]} |
Location: 00/14-18-033-23W4/0 | |
Location Alias: 00/14-18-33-23 W4M | |
Location Alias 2: 00/14-18-033-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 23 | |
Section: 18 | |
County/Municipality: Kneehill County | |
Well Name: PINE CLIFF TWINING 14-18-33-23 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0377956 | |
License Date: 2007-06-08 | |
License Status: Issued | |
Spud Date: 2007-07-06 | |
Final Drill Date: 2007-07-07 | |
Well Total Depth: 625.00 m | |
Surface Hole Latitude: 51.837973 | |
Surface Hole Longitude: -113.253651 |
Date | Event |
---|---|
2007-06-08 | Obtained License |
2007-07-06 | Surface Casing Operation Performed |
2007-07-07 | Finished Drilling |
2007-07-07 | Production Casing Operation Performed |
2007-07-07 | Rig Released |
2007-07-07 | Well Mode changed to Drilled and Cased |
2007-07-14 | Well Log Performed |
2007-11-24 | Perforation Treatment Performed - Jet Perforation |
2007-11-26 | Perforation Treatment Performed - Fractured |
2007-11-28 | Well Fluid changed to Coalbed Methane-Coals Only |
2007-11-28 | Well Mode changed to Testing |
2007-12-04 | Well Began Production |
2007-12-04 | Well Fluid changed to Coalbed Methane-Coals Only |
2007-12-04 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-11-24 | Perforation | 277.60 | 278.60 | 7 |
2007-11-24 | Perforation | 444.10 | 445.10 | 7 |
2007-11-24 | Perforation | 449.70 | 450.70 | 7 |
2007-11-24 | Perforation | 454.10 | 455.10 | 7 |
2007-11-24 | Perforation | 479.10 | 480.10 | 7 |
2007-11-24 | Perforation | 489.40 | 490.40 | 7 |
2007-11-24 | Perforation | 501.20 | 502.20 | 7 |
2007-11-24 | Perforation | 523.40 | 525.40 | 7 |
2007-11-24 | Perforation | 528.60 | 529.60 | 7 |
2007-11-24 | Perforation | 538.10 | 539.10 | 7 |
2007-11-24 | Perforation | 546.40 | 547.40 | 7 |
2007-11-24 | Perforation | 283.30 | 284.30 | 7 |
2007-11-26 | Fracture | 277.60 | 547.40 | 0 |
2007-11-24 | Perforation | 341.40 | 342.40 | 7 |
2007-11-24 | Perforation | 388.90 | 389.90 | 7 |
2007-11-24 | Perforation | 391.10 | 392.10 | 7 |
2007-11-24 | Perforation | 405.50 | 406.50 | 7 |
2007-11-24 | Perforation | 409.90 | 411.40 | 7 |
2007-11-24 | Perforation | 413.40 | 414.40 | 7 |
2007-11-24 | Perforation | 437.90 | 438.90 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 792 | 0.0 | 0.0 | 0.0 |
2008 | 3848 | 0.0 | 0.0 | 0.0 |
2009 | 6960 | 0.0 | 0.0 | 0.0 |
2010 | 8759 | 0.0 | 0.0 | 0.0 |
2011 | 8746 | 0.0 | 0.0 | 0.0 |
2012 | 8754 | 0.0 | 0.0 | 0.0 |
2013 | 8736 | 0.0 | 0.0 | 0.0 |
2014 | 8529 | 0.0 | 0.0 | 0.0 |
2015 | 8643 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]