X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334231616000

Well Details

Well ID: 0334231616000
Loading map...
Location: 00/16-16-033-23W4/0
Location Alias: 00/16-16-33-23 W4M
Location Alias 2: 00/16-16-033-23 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 23
Section: 16
County/Municipality: Kneehill County
Well Name: PINE CLIFF GPINE 16-16-33-23
Operator Name: Pine Cliff Energy Ltd.
License Number: 0111072
License Date: 1984-11-27
License Status: Amended
Spud Date: 1984-12-11
Final Drill Date: 1984-12-19
Well Total Depth: 1572.00 m
Surface Hole Latitude: 51.835091
Surface Hole Longitude: -113.194788

For data sources see[1][2]

Well History

Date Event
1984-01-15 Well Log Performed
1984-11-27 Obtained License
1984-12-12 Surface Casing Operation Performed
1984-12-19 Finished Drilling
1984-12-20 Well Log Performed
1984-12-21 Drill Stem Test Performed
1984-12-22 Drill Stem Test Performed
1984-12-23 Production Casing Operation Performed
1984-12-24 Rig Released
1985-01-09 Perforation Treatment Performed - Jet Perforation
1985-01-09 Well Log Performed
1985-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-01-12 Plug Back Performed
1985-01-13 Perforation Treatment Performed - Jet Perforation
1985-01-13 Well Log Performed
1985-01-21 Well Mode changed to Drilled and Cased
1985-10-01 Well Began Production
1985-10-01 Well Fluid changed to Gas
1985-10-01 Well Mode changed to Flowing
1989-06-13 Perforation Treatment Performed - Jet Perforation
1989-06-13 Well Log Performed
1992-01-01 Well Fluid changed to Gas
1992-01-01 Well Mode changed to Suspended
1992-09-29 Perforation Treatment Performed - Cement Squeeze
1992-09-29 Well Fluid changed to Gas
1992-09-29 Well Mode changed to Abandoned Zone
1992-10-04 Perforation Treatment Performed - Jet Perforation
1992-10-05 Perforation Treatment Performed - Jet Perforation
1992-10-07 Perforation Treatment Performed - Fractured
1995-12-05 Well Log Performed
1995-12-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-06 Plug Back Performed
1995-12-06 Well Log Performed
2000-11-03 Perforation Treatment Performed - Jet Perforation
2000-11-03 Perforation Treatment Performed - Remedial Casing
2000-11-03 Well Log Performed
2000-11-04 Perforation Treatment Performed - Cement Plug
2000-11-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-01-09 Perforation 1544.60 1546.20 13
1995-12-06 Packing Device Capped w/Cement 1527.00 1535.00 0
1995-12-06 Packing Device Capped w/Cement 1502.00 1510.00 0
2000-11-03 Perforation 320.00 321.00 14
2000-11-03 Remedial Casing Cementing 320.00 321.00 0
2000-11-04 Cement Plug 184.80 320.00 0
1985-01-10 Acid Treatment 1544.60 1546.20 0
1985-01-12 Packing Device Capped w/Cement 1532.00 1540.00 0
1985-01-13 Perforation 1517.00 1520.00 13
1989-06-13 Perforation 1520.00 1523.00 13
1992-09-29 Cement Squeeze 1517.00 1523.00 0
1992-10-04 Perforation 1544.60 1546.20 13
1992-10-05 Perforation 1541.00 1542.40 13
1992-10-07 Fracture 1541.00 1546.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1758 0.0 0.0 0.0
1986 7109 0.0 0.0 0.0
1987 6548 0.0 0.0 0.0
1988 3673 0.0 0.0 0.0
1989 1410 0.0 0.0 0.0
1990 3206 0.0 0.0 0.0

For data sources see[5]

References