X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334230706000

Well Details

Well ID: 0334230706000
Loading map...
Location: 00/06-07-033-23W4/0
Location Alias: 00/06-07-33-23 W4M
Location Alias 2: 00/06-07-033-23 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 23
Section: 07
County/Municipality: Kneehill County
Well Name: SOC TWINING 6-7-33-23
Operator Name: Pine Cliff Energy Ltd.
License Number: 0087799
License Date: 1980-12-22
License Status: Suspension
Spud Date: 1981-02-02
Final Drill Date: 1981-02-09
Well Total Depth: 1638.00 m
Surface Hole Latitude: 51.815849
Surface Hole Longitude: -113.257446

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-12-22 Obtained License
1981-02-07 Drill Stem Test Performed
1981-02-09 Finished Drilling
1981-02-10 Drill Stem Test Performed
1981-02-12 Production Casing Operation Performed
1981-02-12 Well Mode changed to Drilled and Cased
1981-12-03 Perforation Treatment Performed - Jet Perforation
1981-12-04 Perforation Treatment Performed - Fractured
1981-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-12-05 Perforation Treatment Performed - Jet Perforation
1981-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-12-09 Perforation Treatment Performed - Jet Perforation
1981-12-10 Perforation Treatment Performed - Jet Perforation
1983-07-22 Well Began Production
1983-07-22 Well Fluid changed to Crude Oil
1983-07-22 Well Mode changed to Flowing
1983-08-12 Perforation Treatment Performed - Cement Squeeze
1983-08-18 Perforation Treatment Performed - Jet Perforation
1983-08-18 Well Log Performed
1985-08-07 Well Fluid changed to Crude Oil
1985-08-07 Well Mode changed to Pumping
1993-12-07 Perforation Treatment Performed - Jet Perforation
1993-12-07 Well Log Performed
1993-12-08 Well Log Performed
1993-12-10 Perforation Treatment Performed - Fractured
1993-12-11 Well Log Performed
1994-02-18 Well Began Injection
1994-02-18 Well Fluid changed to Water
1994-02-18 Well Type changed to Injection
2007-04-15 Well Fluid changed to Water
2007-04-15 Well Mode changed to Suspended
2007-04-15 Well Type changed to Injection
2010-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-13 Perforation Treatment Performed - Bridge Plug No Cement Required
2010-03-13 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2010-03-13 Plug Back Performed
2010-03-13 Well Fluid changed to Water
2010-03-13 Well Log Performed
2010-03-13 Well Mode changed to Abandoned Zone
2010-03-13 Well Type changed to Injection
2010-03-14 Perforation Treatment Performed - Jet Perforation
2010-03-14 Well Log Performed
2010-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-16 Perforation Treatment Performed - Cement Squeeze
2010-03-16 Plug Back Performed
2010-03-17 Perforation Treatment Performed - Jet Perforation
2010-03-17 Well Log Performed
2010-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-18 Perforation Treatment Performed - Cement Squeeze
2010-03-18 Plug Back Performed
2011-03-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-12-03 Perforation 1615.00 1615.50 7
1983-08-18 Perforation 1603.00 1606.00 13
1983-08-18 Perforation 1595.50 1597.50 13
1993-12-07 Perforation 1585.00 1589.50 13
1993-12-07 Perforation 1594.50 1597.50 13
1993-12-10 Fracture 1585.00 1597.50 0
2010-03-13 Bridge Plug, No Cement 1601.70 1602.00 0
2010-03-13 Packing Dev Cpd w/Res-Gyp Cem 1597.70 1601.00 0
2010-03-13 Packing Device Capped w/Cement 1567.00 1575.30 0
2010-03-14 Perforation 540.00 541.00 17
2010-03-16 Cement Squeeze 540.00 541.00 0
1981-12-04 Fracture 1615.00 1615.50 0
2010-03-16 Packing Device Capped w/Cement 527.70 528.30 0
2010-03-17 Perforation 335.00 336.00 17
2010-03-18 Cement Squeeze 335.00 336.00 0
2010-03-18 Packing Device Capped w/Cement 326.70 327.70 0
1981-12-05 Packing Device Capped w/Cement 1613.50 1613.50 0
1981-12-05 Perforation 1594.50 1597.50 7
1981-12-05 Perforation 1603.00 1606.00 7
1981-12-07 Acid Treatment 1594.50 1606.00 0
1981-12-09 Perforation 1585.00 1589.50 7
1981-12-10 Perforation 1585.00 1589.50 7
1983-08-12 Cement Squeeze 1585.00 1589.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 63 0.0 0.0 0.0
1983 2634 0.0 0.0 0.0
1984 7885 0.0 0.0 0.0
1985 5864 0.0 0.0 0.0
1986 4448 0.0 0.0 0.0
1987 4811 0.0 0.0 0.0
1988 6502 0.0 0.0 0.0
1989 4151 0.0 0.0 0.0
1990 4982 0.0 0.0 0.0
1991 3844 0.0 0.0 0.0
1992 3155 0.0 0.0 0.0
1993 2161 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0

For data sources see[5]

References