X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334230205000

Well Details

Well ID: 0334230205000
Loading map...
Location: 00/05-02-033-23W4/0
Location Alias: 00/05-02-33-23 W4M
Location Alias 2: 00/05-02-033-23 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 23
Section: 02
County/Municipality: Kneehill County
Well Name: EMBER GPINE 5-2-33-23
Operator Name: Ember Resources Inc.
License Number: 0360892
License Date: 2006-07-27
License Status: Issued
Spud Date: 2006-09-10
Final Drill Date: 2006-09-11
Well Total Depth: 782.00 m
Surface Hole Latitude: 51.801354
Surface Hole Longitude: -113.164454

For data sources see[1][2]

Well History

Date Event
2006-07-27 Obtained License
2006-09-10 Surface Casing Operation Performed
2006-09-11 Finished Drilling
2006-09-11 Production Casing Operation Performed
2006-09-11 Rig Released
2006-09-11 Well Mode changed to Drilled and Cased
2006-09-29 Well Log Performed
2006-11-03 Perforation Treatment Performed - Jet Perforation
2006-11-14 Perforation Treatment Performed - Fractured
2007-07-17 Well Began Production
2007-07-17 Well Fluid changed to Coalbed Methane-Coals and Other
2007-07-17 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-11-03 Perforation 225.30 225.80 13
2006-11-03 Perforation 364.70 365.20 13
2006-11-03 Perforation 373.30 374.80 13
2006-11-03 Perforation 379.50 381.00 13
2006-11-03 Perforation 383.00 385.00 13
2006-11-03 Perforation 415.00 417.00 13
2006-11-03 Perforation 440.50 441.00 13
2006-11-03 Perforation 444.70 445.20 13
2006-11-03 Perforation 447.60 448.10 13
2006-11-03 Perforation 468.00 470.50 13
2006-11-14 Fracture 468.00 470.50 0
2006-11-03 Perforation 266.20 266.70 13
2006-11-14 Fracture 444.70 448.10 0
2006-11-14 Fracture 440.50 441.00 0
2006-11-14 Fracture 415.00 417.00 0
2006-11-14 Fracture 383.00 385.00 0
2006-11-14 Fracture 383.00 385.00 0
2006-11-14 Fracture 379.50 381.00 0
2006-11-14 Fracture 373.30 374.80 0
2006-11-14 Fracture 360.70 365.20 0
2006-11-14 Fracture 354.00 356.00 0
2006-11-14 Fracture 330.90 334.50 0
2006-11-03 Perforation 313.50 316.00 13
2006-11-14 Fracture 319.70 325.00 0
2006-11-14 Fracture 313.50 316.00 0
2006-11-14 Fracture 266.20 266.70 0
2006-11-14 Fracture 225.30 225.80 0
2006-11-03 Perforation 319.70 320.20 13
2006-11-03 Perforation 324.00 325.00 13
2006-11-03 Perforation 330.90 331.90 13
2006-11-03 Perforation 334.00 334.50 13
2006-11-03 Perforation 354.00 356.00 13
2006-11-03 Perforation 360.70 361.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 3624 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8182 0.0 0.0 0.0
2010 7913 0.0 0.0 0.0
2011 7021 0.0 0.0 0.0
2012 2695 0.0 0.0 0.0
2013 446 0.0 0.0 0.0
2014 665 0.0 0.0 0.0
2015 8546 0.0 0.0 0.0
2016 8749 0.0 0.0 0.0
2017 8756 0.0 0.0 0.0
2018 8593 0.0 0.0 0.0
2019 8755 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References