X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334221807000

Well Details

Well ID: 0334221807000
Loading map...
Location: 00/07-18-033-22W4/0
Location Alias: 00/07-18-33-22 W4M
Location Alias 2: 00/07-18-033-22 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 22
Section: 18
County/Municipality: Kneehill County
Well Name: EMBER GPINE 7-18-33-22
Operator Name: Ember Resources Inc.
License Number: 0358901
License Date: 2006-06-14
License Status: Issued
Spud Date: 2006-07-20
Final Drill Date: 2006-07-23
Well Total Depth: 854.00 m
Surface Hole Latitude: 51.828178
Surface Hole Longitude: -113.108178

For data sources see[1][2]

Well History

Date Event
2006-06-14 Obtained License
2006-07-21 Surface Casing Operation Performed
2006-07-23 Finished Drilling
2006-07-23 Production Casing Operation Performed
2006-07-23 Rig Released
2006-07-23 Well Mode changed to Drilled and Cased
2006-07-30 Well Log Performed
2006-08-15 Perforation Treatment Performed - Jet Perforation
2006-08-15 Well Log Performed
2006-08-18 Perforation Treatment Performed - Jet Perforation
2006-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-25 Perforation Treatment Performed - Jet Perforation
2006-08-25 Plug Back Performed
2006-08-25 Well Log Performed
2006-08-25 Well Mode changed to Abandoned Zone
2006-08-31 Perforation Treatment Performed - Fractured
2009-01-13 Well Log Performed
2010-04-28 Well Log Performed
2011-08-18 Well Log Performed
2012-11-19 Well Log Performed
2013-10-04 Well Log Performed
2014-05-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-08-15 Perforation 765.00 768.50 17
2006-08-25 Perforation 453.40 453.70 14
2006-08-25 Perforation 445.00 445.30 14
2006-08-25 Perforation 443.90 444.20 14
2006-08-25 Perforation 430.20 430.60 14
2006-08-25 Perforation 400.20 400.90 14
2006-08-25 Perforation 396.90 397.50 14
2006-08-25 Perforation 395.10 395.50 14
2006-08-25 Perforation 387.90 388.20 14
2006-08-25 Perforation 384.80 385.90 14
2006-08-25 Perforation 374.80 375.10 14
2006-08-18 Perforation 536.50 537.50 17
2006-08-25 Perforation 366.10 366.40 14
2006-08-25 Perforation 363.10 363.70 14
2006-08-25 Perforation 354.90 357.90 14
2006-08-25 Perforation 340.50 341.10 14
2006-08-25 Perforation 339.70 340.10 14
2006-08-25 Perforation 288.20 288.50 14
2006-08-25 Perforation 287.70 288.00 14
2006-08-25 Perforation 282.90 283.20 14
2006-08-31 Fracture 282.90 497.60 0
2006-08-18 Perforation 531.50 534.00 17
2006-08-25 Packing Device Capped w/Cement 521.80 529.80 0
2006-08-25 Perforation 496.90 497.60 14
2006-08-25 Perforation 495.90 496.20 14
2006-08-25 Perforation 467.80 468.40 14
2006-08-25 Perforation 466.90 467.50 14
2006-08-25 Perforation 461.90 462.20 14

For data sources see[4]



References