X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334192108002

Well Details

Well ID: 0334192108002
Loading map...
Location: 00/08-21-033-19W4/2
Location Alias: 00/08-21-33-19 W4M
Location Alias 2: 00/08-21-033-19 W4/02
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 19
Section: 21
County/Municipality: Starland County
Well Name: WILD RIVER DELIA 0-0-0-0
Operator Name: Crescent Point Energy Corp.
License Number: 0223452
License Date: 1999-06-07
License Status: Abandoned
Spud Date: 1999-08-04
Final Drill Date: 1999-08-05
Well Total Depth: 1425.00 m
Surface Hole Latitude: 51.842144
Surface Hole Longitude: -112.632658

For data sources see[1][2]

Well History

Date Event
1999-06-07 Obtained License
1999-08-05 Finished Drilling
1999-08-05 Perforation Treatment Performed - Jet Perforation
1999-08-05 Rig Released
1999-08-05 Well Mode changed to Drilled and Cased
1999-11-27 Well Began Production
1999-11-27 Well Fluid changed to Gas
1999-11-27 Well Mode changed to Flowing
2009-03-01 Well Fluid changed to Gas
2009-03-01 Well Mode changed to Suspended
2017-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-11-09 Plug Back Performed
2017-11-09 Well Fluid changed to Gas
2017-11-09 Well Log Performed
2017-11-09 Well Mode changed to Abandoned Zone
2017-11-10 Perforation Treatment Performed - Jet Perforation
2017-11-10 Well Log Performed
2017-11-14 Perforation Treatment Performed - Cement Plug
2017-11-14 Perforation Treatment Performed - Remedial Casing
2017-11-14 Plug Back Performed
2017-11-15 Perforation Treatment Performed - Jet Perforation
2017-11-15 Well Log Performed
2017-11-16 Perforation Treatment Performed - Cement Plug
2017-11-16 Perforation Treatment Performed - Remedial Casing
2017-11-16 Plug Back Performed
2017-11-17 Perforation Treatment Performed - Jet Perforation
2017-11-17 Well Log Performed
2017-11-18 Perforation Treatment Performed - Cement Plug
2017-11-18 Perforation Treatment Performed - Remedial Casing
2017-11-18 Plug Back Performed
2017-12-06 Well Abandoned
2017-12-06 Well Fluid changed to Gas
2017-12-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-08-05 Perforation 625.00 634.00 17
2017-11-18 Remedial Casing Cementing 253.00 254.00 0
2017-11-18 Cement Plug 243.00 251.00 0
2017-11-09 Packing Device Capped w/Cement 612.00 620.00 0
2017-11-10 Perforation 430.00 431.00 17
2017-11-14 Remedial Casing Cementing 430.00 431.00 0
2017-11-14 Cement Plug 418.00 426.00 0
2017-11-15 Perforation 345.00 346.00 17
2017-11-16 Remedial Casing Cementing 345.00 346.00 0
2017-11-16 Cement Plug 334.00 342.00 0
2017-11-17 Perforation 253.00 254.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 732 0.0 0.0 0.0
2000 7770 0.0 0.0 0.0
2001 8686 0.0 0.0 0.0
2002 8304 0.0 0.0 0.0
2003 8641 0.0 0.0 0.0
2004 8632 0.0 0.0 0.0
2005 744 0.0 0.0 0.0
2006 3672 0.0 0.0 0.0
2007 1941 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References