X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334170306000

Well Details

Well ID: 0334170306000
Loading map...
Location: 00/06-03-033-17W4/0
Location Alias: 00/06-03-33-17 W4M
Location Alias 2: 00/06-03-033-17 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 17
Section: 03
County/Municipality: Starland County
Well Name: TEAC CHAIN 6-3-33-17
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0353125
License Date: 2006-03-01
License Status: Issued
Spud Date: 2006-03-20
Final Drill Date: 2006-03-21
Well Total Depth: 600.00 m
Surface Hole Latitude: 51.798648
Surface Hole Longitude: -112.336242

For data sources see[1][2]

Well History

Date Event
2006-03-01 Obtained License
2006-03-20 Surface Casing Operation Performed
2006-03-21 Finished Drilling
2006-03-21 Production Casing Operation Performed
2006-03-21 Rig Released
2006-03-21 Well Mode changed to Drilled and Cased
2006-05-10 Well Log Performed
2006-08-24 Perforation Treatment Performed - Jet Perforation
2006-10-26 Perforation Treatment Performed - Jet Perforation
2006-10-26 Well Log Performed
2006-11-14 Perforation Treatment Performed - Fractured
2006-12-13 Well Began Production
2006-12-13 Well Fluid changed to Coalbed Methane-Coals and Other
2006-12-13 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-08-24 Perforation 154.70 156.70 7
2006-10-26 Perforation 153.30 154.30 7
2006-10-26 Perforation 152.00 153.00 7
2006-10-26 Perforation 149.30 150.30 7
2006-10-26 Perforation 145.90 147.40 7
2006-10-26 Perforation 144.10 145.10 7
2006-10-26 Perforation 139.20 140.70 7
2006-10-26 Perforation 137.40 138.40 7
2006-10-26 Perforation 132.50 134.00 7
2006-10-26 Perforation 128.00 129.00 7
2006-10-26 Perforation 122.00 122.50 13
2006-10-26 Perforation 320.50 321.00 13
2006-10-26 Perforation 112.00 114.00 7
2006-10-26 Perforation 108.70 109.20 13
2006-10-26 Perforation 103.80 104.30 13
2006-10-26 Perforation 95.50 96.50 7
2006-10-26 Perforation 93.40 93.90 13
2006-10-26 Perforation 89.50 90.50 7
2006-11-14 Fracture 320.50 321.00 0
2006-11-14 Fracture 313.40 314.90 0
2006-11-14 Fracture 280.00 280.50 0
2006-11-14 Fracture 253.60 255.10 0
2006-10-26 Perforation 313.40 314.90 7
2006-11-14 Fracture 243.00 243.50 0
2006-11-14 Fracture 200.40 200.90 0
2006-11-14 Fracture 195.00 196.00 0
2006-11-14 Fracture 152.00 156.70 0
2006-11-14 Fracture 144.10 150.30 0
2006-11-14 Fracture 137.40 140.70 0
2006-11-14 Fracture 132.50 134.00 0
2006-11-14 Fracture 128.00 129.00 0
2006-11-14 Fracture 122.00 122.50 0
2006-11-14 Fracture 112.00 114.00 0
2006-10-26 Perforation 280.00 280.50 13
2006-11-14 Fracture 108.70 109.20 0
2006-11-14 Fracture 103.80 104.30 0
2006-11-14 Fracture 93.40 96.50 0
2006-11-14 Fracture 89.50 90.50 0
2006-10-26 Perforation 253.60 255.10 7
2006-10-26 Perforation 243.00 243.50 13
2006-10-26 Perforation 200.40 200.90 13
2006-10-26 Perforation 195.00 196.00 7
2006-10-26 Perforation 154.70 156.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 312 0.0 0.0 0.0
2007 8692 0.0 0.0 0.0
2008 8664 0.0 0.0 0.0
2009 8584 0.0 0.0 0.0
2010 8725 0.0 0.0 0.0
2011 8626 0.0 0.0 0.0
2012 8636 0.0 0.0 0.0
2013 8635 0.0 0.0 0.0
2014 8644 0.0 0.0 0.0
2015 8153 0.0 0.0 0.0
2016 8679 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 2879 0.0 0.0 0.0

For data sources see[5]

References