X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334162313002

Well Details

Well ID: 0334162313002
Loading map...
Location: 00/13-23-033-16W4/2
Location Alias: 00/13-23-33-16 W4M
Location Alias 2: 00/13-23-033-16 W4/02
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 16
Section: 23
County/Municipality: Special Areas No. 2
Well Name: CITADEL ET AL FARRELL 13-23-33-16
Operator Name: Citadel Resources Ltd.
License Number: 0089495
License Date: 1981-03-12
License Status: RecExempt
Spud Date: 1981-03-25
Final Drill Date: 1981-03-29
Well Total Depth: 1242.00 m
Surface Hole Latitude: 51.849748
Surface Hole Longitude: -112.173530

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-03-12 Obtained License
1981-03-29 Finished Drilling
1981-03-30 Drill Stem Test Performed
1981-03-31 Drill Stem Test Performed
1981-04-01 Production Casing Operation Performed
1981-05-19 Perforation Treatment Performed - Jet Perforation
1981-05-21 Perforation Treatment Performed - Jet Perforation
1981-05-21 Perforation Treatment Performed - Selective Jet Perforations
1981-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-25 Well Mode changed to Drilled and Cased
1981-12-12 Well Began Production
1981-12-12 Well Fluid changed to Gas
1981-12-12 Well Mode changed to Flowing
1985-03-04 Plug Back Performed
1985-08-31 Well Fluid changed to Gas
1985-08-31 Well Mode changed to Suspended
1986-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-03-04 Well Abandoned
1986-03-04 Well Fluid changed to Gas
1986-03-04 Well Log Performed
1986-03-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-05-19 Perforation 1200.00 1201.50 13
1981-05-21 Perforation 1050.20 1051.20 3
1981-05-21 Perforation 1052.70 1055.20 3
1981-05-21 Perforation 1045.70 1048.20 3
1981-05-21 Selective Jet Perforations 1050.70 1050.70 1
1981-05-22 Acid Treatment 1045.70 1055.20 0
1981-06-02 Acid Treatment 1200.00 1201.50 0
1986-03-04 Packing Device Capped w/Cement 1188.00 1196.00 0
1986-03-04 Packing Device Capped w/Cement 1032.00 1040.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 111 0.0 0.0 0.0
1982 4028 0.0 0.0 0.0
1983 38 0.0 0.0 0.0
1984 803 0.0 0.0 0.0

For data sources see[5]

References