X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334143013000

Well Details

Well ID: 0334143013000
Loading map...
Location: 00/13-30-033-14W4/0
Location Alias: 00/13-30-33-14 W4M
Location Alias 2: 00/13-30-033-14 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 14
Section: 30
County/Municipality: Special Areas No. 2
Well Name: RENAISSANCE SULVANLK 13-30-33-14
Operator Name: Baytex Energy Ltd.
License Number: 0095518
License Date: 1982-03-11
License Status: RecCertified
Spud Date: 1982-04-03
Final Drill Date: 1982-04-07
Well Total Depth: 1229.00 m
Surface Hole Latitude: 51.864162
Surface Hole Longitude: -111.984624

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-03-11 Obtained License
1982-04-07 Finished Drilling
1982-04-07 Well Log Performed
1982-04-07 Well Mode changed to Drilled and Cased
1982-04-08 Drill Stem Test Performed
1982-04-09 Drill Stem Test Performed
1982-04-10 Production Casing Operation Performed
1982-05-13 Perforation Treatment Performed - Jet Perforation
1982-05-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-05-14 Perforation Treatment Performed - Jet Perforation
1982-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-20 Well Began Production
1982-05-20 Well Fluid changed to Crude Oil
1982-05-20 Well Mode changed to Flowing
1982-09-14 Well Fluid changed to Crude Oil
1982-09-14 Well Mode changed to Suspended
1986-04-01 Perforation Treatment Performed - Jet Perforation
1986-06-01 Well Fluid changed to Crude Oil
1986-06-01 Well Mode changed to Suspended
1992-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-16 Plug Back Performed
1992-09-16 Well Fluid changed to Crude Oil
1992-09-16 Well Mode changed to Abandoned Zone
1992-09-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-05-13 Perforation 1198.00 1200.00 13
1982-05-14 Perforation 1188.00 1191.50 13
1982-05-14 Packing Device Capped w/Cement 1195.00 1197.00 0
1982-05-15 Acid Treatment 1188.00 1191.50 0
1986-04-01 Perforation 1166.50 1168.50 13
1992-09-16 Packing Device Capped w/Cement 1152.00 1160.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2659 0.0 0.0 0.0

For data sources see[5]

References