X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334091010000

Well Details

Well ID: 0334091010000
Loading map...
Location: 00/10-10-033-09W4/0
Location Alias: 00/10-10-33-09 W4M
Location Alias 2: 00/10-10-033-09 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 09
Section: 10
County/Municipality: Special Areas No. 4
Well Name: SPUR PROVOST 10-10-33-9
Operator Name: Tamarack Acquisition Corp.
License Number: 0074933
License Date: 1979-03-15
License Status: Issued
Spud Date: 1979-06-11
Final Drill Date: 1979-06-20
Well Total Depth: 1235.00 m
Surface Hole Latitude: 51.819060
Surface Hole Longitude: -111.194435

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-15 Obtained License
1979-06-13 Surface Casing Operation Performed
1979-06-20 Finished Drilling
1979-06-20 Well Log Performed
1979-06-22 Drill Stem Test Performed
1979-06-24 Production Casing Operation Performed
1979-07-29 Perforation Treatment Performed - Jet Perforation
1979-07-29 Well Mode changed to Drilled and Cased
1980-09-23 Well Began Production
1980-09-23 Well Fluid changed to Gas
1980-09-23 Well Mode changed to Flowing
1999-08-29 Perforation Treatment Performed - Jet Perforation
1999-08-29 Well Log Performed
2001-03-29 Well Fluid changed to Gas
2001-03-29 Well Mode changed to Closed
2001-04-12 Well Fluid changed to Gas
2001-04-12 Well Mode changed to Flowing
2001-06-01 Well Fluid changed to Gas
2001-06-01 Well Mode changed to Suspended
2002-08-09 Perforation Treatment Performed - Cement Squeeze
2002-08-09 Plug Back Performed
2002-08-14 Perforation Treatment Performed - Jet Perforation
2002-09-01 Well Fluid changed to Gas
2002-09-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-29 Perforation 896.50 899.00 4
1999-08-29 Perforation 358.80 359.30 13
2002-08-09 Cement Squeeze 358.80 359.30 0
2002-08-14 Perforation 896.50 899.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 2424 0.0 0.0 0.0
1981 6852 0.0 0.0 0.0
1982 6090 0.0 0.0 0.0
1983 7795 0.0 0.0 0.0
1984 4866 0.0 0.0 0.0
1985 1300 0.0 0.0 0.0
1986 1990 0.0 0.0 0.0
1989 5252 0.0 0.0 0.0
1990 7785 0.0 0.0 0.0
1991 4547 0.0 0.0 0.0
1998 4991 0.0 0.0 0.0
1999 4316 0.0 0.0 0.0
2002 2687 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8754 0.0 0.0 0.0
2005 8292 0.0 0.0 0.0
2006 8199 0.0 0.0 0.0
2007 8725 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8753 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8758 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8039 0.0 0.0 0.0
2017 5375 0.0 0.0 0.0
2018 3427 0.0 0.0 0.0
2019 4200 0.0 0.0 0.0

For data sources see[5]

References