X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334090510000

Well Details

Well ID: 0334090510000
Loading map...
Location: 00/10-05-033-09W4/0
Location Alias: 00/10-05-33-09 W4M
Location Alias 2: 00/10-05-033-09 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 09
Section: 05
County/Municipality: Special Areas No. 4
Well Name: GNOL KIRKPAT 10-5-33-9
Operator Name: Fairwest Energy Corporation
License Number: 0055978
License Date: 1975-11-27
License Status: Abandoned
Spud Date: 1975-12-03
Final Drill Date: 1975-12-07
Well Total Depth: 916.80 m
Surface Hole Latitude: 51.804760
Surface Hole Longitude: -111.241774

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-27 Obtained License
1975-12-07 Finished Drilling
1975-12-08 Drill Stem Test Performed
1975-12-09 Production Casing Operation Performed
1976-06-15 Well Mode changed to Drilled and Cased
1978-10-03 Perforation Treatment Performed - Jet Perforation
1978-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-10-16 Perforation Treatment Performed - Fractured
1979-10-09 Well Log Performed
1979-10-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-11 Perforation Treatment Performed - Jet Perforation
1979-10-11 Plug Back Performed
1979-10-11 Well Mode changed to Abandoned Zone
1979-11-16 Perforation Treatment Performed - Jet Perforation
2004-11-08 Perforation Treatment Performed - Cement Squeeze
2004-11-08 Plug Back Performed
2004-11-13 Perforation Treatment Performed - Jet Perforation
2004-11-16 Perforation Treatment Performed - Fractured
2018-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-18 Plug Back Performed
2018-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-19 Plug Back Performed
2019-07-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-03 Perforation 894.90 897.90 13
2004-11-13 Perforation 528.00 529.00 14
2004-11-13 Perforation 516.50 517.50 14
2004-11-13 Perforation 507.50 508.50 14
2004-11-13 Perforation 480.50 481.50 14
2004-11-13 Perforation 469.00 470.00 14
2004-11-16 Fracture 469.00 529.00 0
2018-10-18 Packing Device Capped w/Cement 449.80 458.00 0
2018-10-19 Packing Device Capped w/Cement 330.50 338.70 0
1978-10-05 Acid Treatment 894.90 897.90 0
1978-10-10 Acid Treatment 894.90 897.90 0
1978-10-16 Fracture 894.90 897.90 0
1979-10-11 Packing Device Capped w/Cement 885.40 891.50 0
1979-10-11 Perforation 350.20 351.40 13
1979-11-16 Perforation 352.00 353.60 13
2004-11-08 Cement Squeeze 350.20 351.40 0
2004-11-08 Cement Squeeze 352.00 353.60 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-10-18 No Incident Encountered 0.00 0.00
2018-10-19 No Incident Encountered 0.00 0.00

For data sources see[5]

References