X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334030309000

Well Details

Well ID: 0334030309000
Loading map...
Location: 00/09-03-033-03W4/0
Location Alias: 00/09-03-33-03 W4M
Location Alias 2: 00/09-03-033-03 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 03
Section: 03
County/Municipality: Special Areas No. 4
Well Name: PENN WEST ET AL ESTHER 9-3-33-3
Operator Name: Obsidian Energy Ltd.
License Number: 0119342
License Date: 1985-11-15
License Status: Amended
Spud Date: 1985-11-15
Final Drill Date: 1985-11-18
Well Total Depth: 793.00 m
Surface Hole Latitude: 51.802852
Surface Hole Longitude: -110.337601

For data sources see[1][2]

Well History

Date Event
1985-11-15 Obtained License
1985-11-16 Surface Casing Operation Performed
1985-11-18 Finished Drilling
1985-11-18 Well Mode changed to Drilled and Cased
1985-11-19 Production Casing Operation Performed
1985-11-19 Well Log Performed
1985-11-20 Rig Released
1985-11-29 Perforation Treatment Performed - Jet Perforation
1985-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-30 Well Log Performed
1985-12-04 Well Began Production
1985-12-04 Well Fluid changed to Crude Oil
1985-12-04 Well Mode changed to Pumping
1992-03-03 Well Fluid changed to Crude Oil
1992-03-03 Well Mode changed to Suspended
1993-03-07 Well Fluid changed to Crude Oil
1993-03-07 Well Mode changed to Flowing
1995-12-01 Well Fluid changed to Crude Oil
1995-12-01 Well Mode changed to Suspended
2001-03-02 Well Log Performed
2001-06-28 Well Began Injection
2001-06-28 Well Fluid changed to Water
2001-06-28 Well Type changed to Disposal
2009-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-27 Plug Back Performed
2009-03-27 Well Fluid changed to Water
2009-03-27 Well Log Performed
2009-03-27 Well Mode changed to Abandoned Zone
2009-03-27 Well Type changed to Disposal
2009-03-28 Perforation Treatment Performed - Jet Perforation
2009-03-28 Well Log Performed
2009-03-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-29 Perforation 729.60 731.10 13
1985-11-30 Acid Treatment 729.60 731.10 0
2009-03-27 Packing Device Capped w/Cement 716.00 724.00 0
2009-03-28 Perforation 686.70 689.70 17
2009-03-29 Fracture 686.70 689.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 658 0.0 0.0 0.0
1986 8731 0.0 0.0 0.0
1987 8751 0.0 0.0 0.0
1988 8390 0.0 0.0 0.0
1989 8687 0.0 0.0 0.0
1990 8495 0.0 0.0 0.0
1991 3680 0.0 0.0 0.0
1993 4270 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0

For data sources see[5]

References