X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334020207020

Well Details

Well ID: 0334020207020
Loading map...
Location: 02/07-02-033-02W4/0
Location Alias: 02/07-02-33-02 W4M
Location Alias 2: 02/07-02-033-02 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 02
Section: 02
County/Municipality: Special Areas No. 4
Well Name: ANEGADA HZ 7A ESTHER 7-2-33-2
Operator Name: Baytex Energy Ltd.
License Number: 0476172
License Date: 2015-07-17
License Status: Issued
Spud Date: 2015-08-20
Final Drill Date: 2015-08-26
Well Total Depth: 2325.00 m
Surface Hole Latitude: 51.784670
Surface Hole Longitude: -110.177880

For data sources see[1][2]

Well History

Date Event
2015-07-17 Obtained License
2015-08-21 Surface Casing Operation Performed
2015-08-24 Direction Drilling Operation Performed - Deviate
2015-08-24 Direction Drilling Operation Performed - Horizontal
2015-08-26 Finished Drilling
2015-08-26 Production Casing Operation Performed
2015-08-26 Rig Released
2015-08-26 Well Log Performed
2015-08-26 Well Mode changed to Drilled and Cased
2015-09-01 Well Log Performed
2015-09-04 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-05 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-13 Well Began Production
2015-09-13 Well Fluid changed to Crude Oil
2015-09-13 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-08-20 Precision Drilling Corporation 145 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-08-24 519.40 Deviate (5 - 79 degrees)
2015-08-24 835.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-04 Multi-Stage Fracture 2301.00 2301.50 0
2015-09-04 Multi-Stage Fracture 1910.00 1910.50 0
2015-09-04 Multi-Stage Fracture 1882.00 1882.50 0
2015-09-04 Multi-Stage Fracture 1845.00 1845.50 0
2015-09-04 Multi-Stage Fracture 1818.00 1818.50 0
2015-09-04 Multi-Stage Fracture 1790.00 1790.50 0
2015-09-04 Multi-Stage Fracture 1760.00 1760.50 0
2015-09-04 Multi-Stage Fracture 1733.00 1733.50 0
2015-09-04 Multi-Stage Fracture 1697.00 1697.50 0
2015-09-04 Multi-Stage Fracture 1655.00 1655.50 0
2015-09-04 Multi-Stage Fracture 1614.00 1614.50 0
2015-09-04 Multi-Stage Fracture 2266.00 2266.50 0
2015-09-04 Multi-Stage Fracture 1585.00 1585.50 0
2015-09-04 Multi-Stage Fracture 1556.00 1556.50 0
2015-09-04 Multi-Stage Fracture 1529.00 1529.50 0
2015-09-04 Multi-Stage Fracture 1493.00 1493.50 0
2015-09-04 Multi-Stage Fracture 1465.00 1465.50 0
2015-09-04 Multi-Stage Fracture 1300.00 1300.50 0
2015-09-04 Multi-Stage Fracture 1273.00 1273.50 0
2015-09-04 Multi-Stage Fracture 1237.00 1237.50 0
2015-09-04 Multi-Stage Fracture 1210.00 1210.50 0
2015-09-04 Multi-Stage Fracture 1180.00 1180.50 0
2015-09-04 Multi-Stage Fracture 2236.00 2236.50 0
2015-09-05 Multi-Stage Fracture 1152.00 1152.50 0
2015-09-05 Multi-Stage Fracture 1115.00 1115.50 0
2015-09-05 Multi-Stage Fracture 1088.00 1088.50 0
2015-09-05 Multi-Stage Fracture 936.00 936.50 0
2015-09-05 Multi-Stage Fracture 909.00 909.50 0
2015-09-05 Multi-Stage Fracture 873.00 873.50 0
2015-09-04 Multi-Stage Fracture 2209.00 2209.50 0
2015-09-04 Multi-Stage Fracture 2060.00 2060.50 0
2015-09-04 Multi-Stage Fracture 2030.00 2030.50 0
2015-09-04 Multi-Stage Fracture 2003.00 2003.50 0
2015-09-04 Multi-Stage Fracture 1967.00 1967.50 0
2015-09-04 Multi-Stage Fracture 1940.00 1940.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-04 2015-09-05 732 1,454 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 78.5246 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 22.3274 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.2574 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.1025 N/A
IH-NE-1 Fusion Technologies Inc. Surfactant 2-ethyhexanol 104-76-7 100 0.0636 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.0636 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.0636 N/A
Heavy aromatic naptha 64742-94-5 100 0.0636 N/A
Isopropanol 67-63-0 100 0.0636 N/A
Methanol 67-56-1 100 0.0636 N/A
Napthalene 91-20-3 100 0.0636 N/A
Polyethylene glycol 25322-68-3 100 0.0636 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-04 2015-09-21 Municipal Water 1309

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2612 0.0 0.0 0.0
2016 8694 0.0 0.0 0.0
2017 8636 0.0 0.0 0.0
2018 8516 0.0 0.0 0.0
2019 8627 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-26 No Incident Encountered 0.00 0.00
2015-09-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References