If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334011413000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.834679,"lon":-110.046457,"icon":""}]} |
Location: 00/13-14-033-01W4/0 | |
Location Alias: 00/13-14-33-01 W4M | |
Location Alias 2: 00/13-14-033-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 01 | |
Section: 14 | |
County/Municipality: Special Areas No. 4 | |
Well Name: CLETOM COMPEER 13-14-33-1 | |
Operator Name: Cletom Energy Ltd. | |
License Number: 0081785 | |
License Date: 1990-07-26 | |
License Status: RecCertified | |
Spud Date: 1980-06-18 | |
Final Drill Date: 1980-06-25 | |
Well Total Depth: 900.00 m | |
Surface Hole Latitude: 51.834679 | |
Surface Hole Longitude: -110.046457 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-06-23 | Drill Stem Test Performed |
1980-06-24 | Drill Stem Test Performed |
1980-06-25 | Finished Drilling |
1980-06-25 | Well Mode changed to Drilled and Cased |
1980-06-26 | Drill Stem Test Performed |
1980-06-28 | Production Casing Operation Performed |
1980-07-23 | Perforation Treatment Performed - Jet Perforation |
1980-07-25 | Perforation Treatment Performed - Cement Squeeze |
1980-07-27 | Perforation Treatment Performed - Jet Perforation |
1980-08-17 | Well Began Production |
1980-08-17 | Well Fluid changed to Crude Oil |
1980-08-17 | Well Mode changed to Pumping |
1980-10-09 | Perforation Treatment Performed - Jet Perforation |
1980-10-30 | Well Fluid changed to Crude Oil |
1980-10-30 | Well Mode changed to Suspended |
1982-07-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-06-14 | Perforation Treatment Performed - Jet Perforation |
1990-06-15 | Perforation Treatment Performed - Cement Squeeze |
1990-06-15 | Plug Back Performed |
1990-06-15 | Well Fluid changed to Crude Oil |
1990-06-15 | Well Mode changed to Abandoned Zone |
1990-07-26 | Obtained License |
1991-08-30 | Perforation Treatment Performed - Jet Perforation |
1998-03-14 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-07-23 | Perforation | 858.00 | 861.00 | 6 |
1980-07-25 | Cement Squeeze | 858.00 | 861.00 | 0 |
1980-07-27 | Perforation | 854.80 | 856.80 | 5 |
1980-10-09 | Perforation | 854.80 | 856.80 | 13 |
1982-07-17 | Packing Device Capped w/Cement | 837.20 | 845.00 | 0 |
1990-06-14 | Perforation | 854.80 | 856.80 | 13 |
1990-06-15 | Cement Squeeze | 854.80 | 856.80 | 0 |
1991-08-30 | Perforation | 204.00 | 207.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 155 | 0.0 | 0.0 | 0.0 |
For data sources see[5]