X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325091905000

Well Details

Well ID: 0325091905000
Loading map...
Location: 00/05-19-032-09W5/0
Location Alias: 00/05-19-32-09 W5M
Location Alias 2: 00/05-19-032-09 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 09
Section: 19
County/Municipality: Clearwater County
Well Name: SHELL 9 LIMESTONE 5-19-32-9
Operator Name: Shell Canada Limited
License Number: 0055416
License Date: 1975-10-17
License Status: Abandoned
Spud Date: 1975-10-22
Final Drill Date: 1976-02-15
Well Total Depth: 4253.80 m
Surface Hole Latitude: 51.755703
Surface Hole Longitude: -115.273537

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-17 Obtained License
1976-02-15 Finished Drilling
1976-02-18 Liner Casing Operation Performed
1976-02-22 Perforation Treatment Performed - Jet Perforation
1976-02-23 Drill Stem Test Performed
1976-02-24 Drill Stem Test Performed
1976-02-25 Perforation Treatment Performed - Jet Perforation
1976-02-26 Drill Stem Test Performed
1976-02-27 Perforation Treatment Performed - Jet Perforation
1976-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-03-04 Perforation Treatment Performed - Jet Perforation
1976-03-05 Perforation Treatment Performed - Acid Wash - No Pressure
1976-03-07 Perforation Treatment Performed - Jet Perforation
1976-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-16 Perforation Treatment Performed - Fractured
1976-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-03-30 Perforation Treatment Performed - Jet Perforation
1976-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-04-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-04-20 Perforation Treatment Performed - Jet Perforation
1976-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-04-23 Perforation Treatment Performed - Fractured
1976-06-01 Well Mode changed to Drilled and Cased
1980-11-17 Well Began Production
1980-11-17 Well Fluid changed to Gas
1980-11-17 Well Mode changed to Flowing
1989-10-27 Well Fluid changed to Gas
1989-10-27 Well Mode changed to Suspended
1994-04-30 Well Fluid changed to Gas
1994-04-30 Well Mode changed to Flowing
1994-12-01 Well Fluid changed to Gas
1994-12-01 Well Mode changed to Suspended
2012-06-20 Perforation Treatment Performed - Cement Plug
2012-06-20 Plug Back Performed
2012-06-23 Perforation Treatment Performed - Jet Perforation
2012-06-24 Perforation Treatment Performed - Cement Squeeze
2012-06-24 Plug Back Performed
2012-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-25 Plug Back Performed
2012-06-25 Well Fluid changed to Gas
2012-06-25 Well Mode changed to Abandoned Zone
2012-12-11 Well Abandoned
2012-12-11 Well Fluid changed to Gas
2012-12-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-02-22 Perforation 4203.20 4209.30 7
1976-02-27 Perforation 4105.70 4113.00 7
1976-02-27 Perforation 4116.00 4120.90 7
1976-02-27 Perforation 4123.30 4127.60 7
1976-02-27 Perforation 4128.80 4130.60 7
1976-03-01 Packing Device Capped w/Cement 3962.40 3970.00 0
1976-03-04 Perforation 3793.20 3794.80 3
1976-03-04 Perforation 3799.30 3823.70 3
1976-03-04 Perforation 3830.70 3835.00 3
1976-03-05 Acid Wash 3793.20 3835.00 0
1976-03-07 Perforation 3773.40 3774.90 3
1976-02-22 Perforation 4214.20 4218.40 7
1976-03-07 Perforation 3778.00 3788.70 3
1976-03-08 Acid Treatment 3773.40 3788.70 0
1976-03-16 Fracture 3773.40 3835.00 0
1976-03-28 Packing Device Capped w/Cement 3735.60 3735.60 7
1976-03-28 Packing Device Capped w/Cement 3599.70 3599.70 7
1976-03-30 Perforation 3291.80 3296.70 7
1976-03-30 Perforation 3299.50 3301.60 7
1976-03-30 Perforation 3308.30 3310.70 7
1976-03-30 Perforation 3375.40 3381.10 7
1976-03-30 Perforation 3385.40 3387.50 7
1976-02-22 Perforation 4224.50 4227.00 7
1976-03-30 Perforation 3390.60 3392.40 7
1976-03-31 Acid Treatment 3291.80 3392.40 7
1976-04-01 Acid Treatment 3291.80 3392.40 0
1976-04-09 Packing Device Capped w/Cement 3243.10 3243.10 0
1976-04-20 Perforation 3162.90 3214.40 7
1976-04-21 Acid Treatment 3162.90 3214.40 0
1976-04-23 Fracture 3162.90 3214.40 0
2012-06-20 Cement Plug 1765.80 1865.30 0
2012-06-23 Perforation 600.00 601.00 20
2012-06-24 Cement Squeeze 600.00 601.00 0
1976-02-22 Perforation 4230.00 4233.10 7
2012-06-25 Packing Device Capped w/Cement 0.00 592.00 0
1976-02-25 Perforation 4148.30 4154.40 7
1976-02-25 Perforation 4159.90 4164.20 7
1976-02-25 Perforation 4170.90 4178.20 7
1976-02-27 Perforation 4095.30 4097.10 7
1976-02-27 Perforation 4099.60 4101.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1034 0.0 0.0 0.0
1981 6961 0.0 0.0 0.0
1982 4507 0.0 0.0 0.0
1983 292 0.0 0.0 0.0
1984 3393 0.0 0.0 0.0
1985 3489 0.0 0.0 0.0
1986 4397 0.0 0.0 0.0
1987 7108 0.0 0.0 0.0
1988 1513 0.0 0.0 0.0
1989 509 0.0 0.0 0.0
1994 620 0.0 0.0 0.0
1995 80 0.0 0.0 0.0
1996 1 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References