X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325082707000

Well Details

Well ID: 0325082707000
Loading map...
Location: 00/07-27-032-08W5/0
Location Alias: 00/07-27-32-08 W5M
Location Alias 2: 00/07-27-032-08 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 08
Section: 27
County/Municipality: Clearwater County
Well Name: AMOCO ET AL BEARBERRY 7-27-32-8
Operator Name: BP Canada Energy Group ULC
License Number: 0077223
License Date: 1979-07-31
License Status: RecCertified
Spud Date: 1979-08-31
Final Drill Date: 1980-02-07
Well Total Depth: 3962.00 m
Surface Hole Latitude: 51.769535
Surface Hole Longitude: -115.054515

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-31 Obtained License
1980-02-07 Finished Drilling
1980-02-17 Production Casing Operation Performed
1980-05-16 Perforation Treatment Performed - Jet Perforation
1980-05-20 Perforation Treatment Performed - Jet Perforation
1980-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-06-01 Perforation Treatment Performed - Fractured
1980-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-06-12 Perforation Treatment Performed - Jet Perforation
1980-06-22 Perforation Treatment Performed - Fractured
1980-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-05 Perforation Treatment Performed - Cement Squeeze
1980-07-06 Perforation Treatment Performed - Jet Perforation
1980-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-17 Well Mode changed to Drilled and Cased
1991-11-01 Well Began Production
1991-11-01 Well Fluid changed to Gas
1991-11-01 Well Mode changed to Flowing
1991-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-11-14 Plug Back Performed
1991-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-11-15 Perforation Treatment Performed - Jet Perforation
1991-11-15 Plug Back Performed
1991-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-11-16 Perforation Treatment Performed - Remedial Casing
1991-11-16 Plug Back Performed
1991-11-16 Well Fluid changed to Gas
1991-11-16 Well Mode changed to Abandoned
1991-11-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-16 Perforation 3776.00 3777.00 7
1980-07-05 Cement Squeeze 2174.00 2179.00 0
1980-07-06 Perforation 2150.50 2155.00 7
1980-07-09 Acid Treatment 2150.50 2155.00 0
1991-11-14 Packing Device Capped w/Cement 2400.00 2408.00 0
1991-11-15 Packing Device Capped w/Cement 2134.00 2142.00 0
1991-11-15 Perforation 605.00 605.30 68
1991-11-16 Remedial Casing Cementing 605.00 605.30 0
1991-11-16 Packing Device Capped w/Cement 580.00 600.00 0
1980-05-20 Perforation 3761.00 3762.00 7
1980-05-20 Perforation 3766.50 3769.00 7
1980-05-23 Acid Treatment 3761.00 3777.00 0
1980-06-01 Fracture 3761.00 3777.00 0
1980-06-12 Packing Device Capped w/Cement 3708.00 3716.00 0
1980-06-12 Perforation 2174.00 2179.00 7
1980-06-22 Fracture 2174.00 2179.00 0
1980-06-27 Acid Treatment 2174.00 2179.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 360 0.0 0.0 0.0

For data sources see[5]

References