X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325073511000

Well Details

Well ID: 0325073511000
Loading map...
Location: 00/11-35-032-07W5/0
Location Alias: 00/11-35-32-07 W5M
Location Alias 2: 00/11-35-032-07 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 07
Section: 35
County/Municipality: Mountain View County
Well Name: MOBIL RICINUS 11-35-32-7
Operator Name: ExxonMobil Canada Ltd.
License Number: 0164024
License Date: 1994-01-14
License Status: Abandoned
Spud Date: 1994-01-27
Final Drill Date: 1994-05-31
Well Total Depth: 4100.00 m
Surface Hole Latitude: 51.789224
Surface Hole Longitude: -114.885882

For data sources see[1][2]

Well History

Date Event
1994-01-14 Obtained License
1994-01-31 Surface Casing Operation Performed
1994-02-09 Well Log Performed
1994-02-16 Direction Drilling Operation Performed - Deviate
1994-03-08 Lost Circulation Occurred
1994-03-23 Lost Circulation Occurred
1994-04-01 Intermediate Casing Operation Performed
1994-04-02 Well Log Performed
1994-05-22 Plug Back Performed
1994-05-24 Direction Drilling Operation Performed - Sidetrack Fish
1994-05-31 Finished Drilling
1994-05-31 Well Log Performed
1994-06-05 Well Log Performed
1994-06-08 Liner Casing Operation Performed
1994-06-10 Rig Released
1994-06-10 Well Mode changed to Drilled and Cased
1994-07-22 Well Log Performed
1994-07-26 Perforation Treatment Performed - Jet Perforation
1994-07-27 Well Log Performed
1994-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-01 Well Fluid changed to Crude Oil
1994-08-01 Well Mode changed to Potential
1994-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-02 Plug Back Performed
1994-08-03 Well Log Performed
1994-08-04 Perforation Treatment Performed - Jet Perforation
1994-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-16 Plug Back Performed
1994-08-16 Well Fluid changed to Crude Oil
1994-08-16 Well Log Performed
1994-08-16 Well Mode changed to Abandoned Zone
2003-07-07 Perforation Treatment Performed - Cement Plug
2003-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-10 Perforation Treatment Performed - Jet Perforation
2003-07-10 Perforation Treatment Performed - Remedial Casing
2003-07-11 Perforation Treatment Performed - Jet Perforation
2003-07-12 Perforation Treatment Performed - Cement Plug
2003-07-12 Perforation Treatment Performed - Remedial Casing
2003-07-13 Perforation Treatment Performed - Jet Perforation
2003-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-14 Perforation Treatment Performed - Remedial Casing
2003-07-15 Perforation Treatment Performed - Jet Perforation
2003-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-16 Perforation Treatment Performed - Remedial Casing
2003-07-18 Well Abandoned
2003-07-18 Well Fluid changed to Crude Oil
2003-07-18 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-02-16 2302.00 Deviate (5 - 79 degrees)
1994-05-24 3834.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-07-26 Perforation 3990.00 4008.00 13
2003-07-10 Packing Device Capped w/Cement 2796.00 2821.00 0
2003-07-11 Perforation 2762.00 2763.00 17
2003-07-12 Remedial Casing Cementing 2762.00 2763.00 0
2003-07-12 Cement Plug 2720.00 2765.00 0
2003-07-13 Perforation 2475.00 2476.00 17
2003-07-14 Remedial Casing Cementing 2475.00 2476.00 0
2003-07-14 Packing Device Capped w/Cement 2434.80 2475.00 0
2003-07-15 Perforation 600.00 602.00 17
2003-07-16 Remedial Casing Cementing 600.00 602.00 0
2003-07-16 Packing Device Capped w/Cement 529.40 604.00 0
1994-07-30 Acid Treatment 3990.00 4008.00 0
1994-08-02 Packing Device Capped w/Cement 3972.00 3982.00 0
1994-08-04 Perforation 3902.00 3924.00 13
1994-08-05 Acid Treatment 3902.00 3924.00 0
1994-08-16 Packing Device Capped w/Cement 3884.00 3894.00 0
2003-07-07 Cement Plug 2911.80 3684.00 0
2003-07-10 Perforation 2819.00 2820.00 17
2003-07-10 Remedial Casing Cementing 2819.00 2820.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 17 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-03-08 Lost Circulation 2898.00 2898.00
1994-03-23 Lost Circulation 2778.00 2801.00

For data sources see[7]

References