X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325072610000

Well Details

Well ID: 0325072610000
Loading map...
Location: 00/10-26-032-07W5/0
Location Alias: 00/10-26-32-07 W5M
Location Alias 2: 00/10-26-032-07 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 07
Section: 26
County/Municipality: Mountain View County
Well Name: BEC RICINUS 10-26-32-7
Operator Name: Bonavista Energy Corporation
License Number: 0173050
License Date: 1994-11-25
License Status: Issued
Spud Date: 1994-12-13
Final Drill Date: 1994-12-28
Well Total Depth: 2164.00 m
Surface Hole Latitude: 51.774825
Surface Hole Longitude: -114.885104

For data sources see[1][2]

Well History

Date Event
1994-11-25 Obtained License
1994-12-13 Surface Casing Operation Performed
1994-12-13 Well Log Performed
1994-12-19 Direction Drilling Operation Performed - Deviate
1994-12-28 Finished Drilling
1994-12-28 Perforation Treatment Performed - Open-Hole Completion
1994-12-28 Well Mode changed to Drilled and Cased
1994-12-29 Well Log Performed
1995-01-01 Production Casing Operation Performed
1995-01-01 Well Began Production
1995-01-01 Well Fluid changed to Gas
1995-01-01 Well Log Performed
1995-01-01 Well Mode changed to Flowing
1995-01-03 Well Log Performed
1995-01-04 Rig Released
1995-01-13 Perforation Treatment Performed - Cement Plug
1995-01-13 Perforation Treatment Performed - Open-Hole Completion
1995-01-13 Plug Back Performed
1995-01-13 Well Log Performed
1995-01-16 Perforation Treatment Performed - Jet Perforation
1995-01-31 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-12-19 1315.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-12-28 Open Hole/Barefoot Completion 1980.20 2164.00 0
1995-01-13 Cement Plug 2037.00 2041.00 0
1995-01-13 Open Hole/Barefoot Completion 1980.20 2037.00 0
1995-01-16 Perforation 1979.60 1995.60 13
1995-01-31 Fracture 1979.60 2037.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4581 0.0 0.0 0.0
1996 8606 0.0 0.0 0.0
1997 8473 0.0 0.0 0.0
1998 8323 0.0 0.0 0.0
1999 7910 0.0 0.0 0.0
2000 8639 0.0 0.0 0.0
2001 8597 0.0 0.0 0.0
2002 8485 0.0 0.0 0.0
2003 8574 0.0 0.0 0.0
2004 8431 0.0 0.0 0.0
2005 8167 0.0 0.0 0.0
2006 8459 0.0 0.0 0.0
2007 6365 0.0 0.0 0.0
2008 6598 0.0 0.0 0.0
2009 8390 0.0 0.0 0.0
2010 8337 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8675 0.0 0.0 0.0
2013 8352 0.0 0.0 0.0
2014 8473 0.0 0.0 0.0
2015 8275 0.0 0.0 0.0
2016 8211 0.0 0.0 0.0
2017 8097 0.0 0.0 0.0
2018 6185 0.0 0.0 0.0
2019 5422 0.0 0.0 0.0
2020 2118 0.0 0.0 0.0

For data sources see[6]

References