X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325072413003

Well Details

Well ID: 0325072413003
Loading map...
Location: 00/13-24-032-07W5/3
Location Alias: 00/13-24-32-07 W5M
Location Alias 2: 00/13-24-032-07 W5/03
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 07
Section: 24
County/Municipality: Clearwater County
Well Name: PC ET AL 16-23DR RICINUS 13-24-32-7
Operator Name: TAQA North Ltd.
License Number: 0270895
License Date: 2002-06-14
License Status: Issued
Spud Date: 2002-07-10
Final Drill Date: 2002-08-13
Well Total Depth: 3028.00 m
Surface Hole Latitude: 51.762680
Surface Hole Longitude: -114.878485

For data sources see[1][2]

Well History

Date Event
2002-06-14 Obtained License
2002-08-05 Direction Drilling Operation Performed - Deviate
2002-08-13 Finished Drilling
2002-08-13 Well Log Performed
2002-08-13 Well Mode changed to Drilled and Cased
2002-08-14 Well Log Performed
2002-08-16 Production Casing Operation Performed
2002-08-16 Rig Released
2002-08-28 Well Log Performed
2002-08-30 Perforation Treatment Performed - Jet Perforation
2002-09-05 Perforation Treatment Performed - Fractured
2002-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-10 Perforation Treatment Performed - Jet Perforation
2002-09-10 Plug Back Performed
2002-09-13 Perforation Treatment Performed - Fractured
2002-09-16 Perforation Treatment Performed - Jet Perforation
2002-09-19 Perforation Treatment Performed - Fractured
2002-09-26 Perforation Treatment Performed - Jet Perforation
2002-09-27 Perforation Treatment Performed - Jet Perforation
2002-11-13 Well Began Production
2002-11-13 Well Fluid changed to Gas
2002-11-13 Well Mode changed to Flowing
2004-10-01 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-08-05 2492.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-08-30 Perforation 3005.00 3010.00 20
2002-09-19 Fracture 2794.00 2805.00 0
2002-09-26 Perforation 2808.00 2812.00 20
2002-09-26 Perforation 2805.00 2808.00 20
2002-09-26 Perforation 2797.00 2800.00 20
2002-09-26 Perforation 2914.00 2920.00 20
2002-09-27 Perforation 2791.00 2797.00 20
2002-08-30 Perforation 3000.00 3005.00 20
2002-09-05 Fracture 3000.00 3010.00 0
2002-09-10 Packing Device Capped w/Cement 2978.00 2986.00 0
2002-09-10 Perforation 2925.00 2930.00 20
2002-09-10 Perforation 2920.00 2925.00 20
2002-09-13 Fracture 2920.00 2930.00 0
2002-09-16 Perforation 2800.00 2805.00 20
2002-09-16 Perforation 2794.00 2795.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 603 0.0 0.0 0.0
2003 2639 0.0 0.0 0.0
2004 5101 0.0 0.0 0.0

For data sources see[6]

References