X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325042315000

Well Details

Well ID: 0325042315000
Loading map...
Location: 00/15-23-032-04W5/0
Location Alias: 00/15-23-32-04 W5M
Location Alias 2: 00/15-23-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 23
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 15-23-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0016501
License Date: 1958-12-29
License Status: Abandoned
Spud Date: 1958-12-31
Final Drill Date: 1959-02-08
Well Total Depth: 2667.00 m
Surface Hole Latitude: 51.763320
Surface Hole Longitude: -114.458261

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-12-29 Obtained License
1959-02-08 Finished Drilling
1959-02-08 Well Mode changed to Drilled and Cased
1959-02-10 Production Casing Operation Performed
1959-02-12 Perforation Treatment Performed - Open-Hole Completion
1959-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-02-16 Well Began Production
1959-02-16 Well Fluid changed to Crude Oil
1959-02-16 Well Mode changed to Flowing
1959-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-18 Well Fluid changed to Crude Oil
1979-07-18 Well Mode changed to Pumping
1998-04-09 Well Fluid changed to Crude Oil
1998-04-09 Well Mode changed to Suspended
2005-02-14 Well Log Performed
2005-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-15 Plug Back Performed
2005-02-15 Well Fluid changed to Crude Oil
2005-02-15 Well Log Performed
2005-02-15 Well Mode changed to Abandoned Zone
2005-02-16 Perforation Treatment Performed - Jet Perforation
2005-02-16 Well Log Performed
2005-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-02-17 Perforation Treatment Performed - Remedial Casing
2005-02-17 Plug Back Performed
2005-03-08 Perforation Treatment Performed - Jet Perforation
2005-03-08 Well Log Performed
2005-03-09 Perforation Treatment Performed - Remedial Casing
2005-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-11 Perforation Treatment Performed - Jet Perforation
2005-03-11 Plug Back Performed
2005-03-11 Well Log Performed
2005-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-13 Perforation Treatment Performed - Remedial Casing
2005-03-13 Plug Back Performed
2005-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-14 Perforation Treatment Performed - Jet Perforation
2005-03-14 Plug Back Performed
2005-03-14 Well Log Performed
2005-03-15 Well Log Performed
2005-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-16 Perforation Treatment Performed - Remedial Casing
2005-03-16 Plug Back Performed
2005-07-07 Well Abandoned
2005-07-07 Well Fluid changed to Crude Oil
2005-07-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-02-12 Open Hole/Barefoot Completion 2633.50 2667.00 0
2005-03-08 Perforation 605.00 606.00 17
2005-03-09 Remedial Casing Cementing 605.00 606.00 0
2005-03-11 Packing Device Capped w/Cement 586.70 597.40 0
2005-03-11 Perforation 537.00 538.00 17
2005-03-13 Remedial Casing Cementing 537.00 538.00 0
2005-03-13 Packing Device Capped w/Cement 520.40 531.00 0
2005-03-14 Perforation 468.00 469.00 17
2005-03-14 Packing Device Capped w/Cement 421.50 462.50 0
2005-03-14 Perforation 251.00 252.00 17
2005-03-16 Remedial Casing Cementing 251.00 252.00 0
1959-02-14 Acid Treatment 2633.50 2667.00 0
2005-03-16 Packing Device Capped w/Cement 221.00 246.90 0
1959-04-08 Acid Treatment 2633.50 2667.00 0
1959-08-14 Acid Treatment 2633.50 2667.00 0
1962-03-27 Acid Treatment 2633.50 2667.00 0
2005-02-15 Packing Device Capped w/Cement 2612.00 2620.00 0
2005-02-16 Perforation 2070.00 2072.00 17
2005-02-17 Remedial Casing Cementing 2070.00 2072.00 0
2005-02-17 Packing Device Capped w/Cement 2053.00 2063.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1979 3434 0.0 0.0 0.0
1980 7829 0.0 0.0 0.0
1981 5754 0.0 0.0 0.0
1982 8321 0.0 0.0 0.0
1983 8110 0.0 0.0 0.0
1984 8560 0.0 0.0 0.0
1985 6972 0.0 0.0 0.0
1986 4636 0.0 0.0 0.0
1987 2542 0.0 0.0 0.0
1988 1155 0.0 0.0 0.0
1989 4924 0.0 0.0 0.0
1990 6809 0.0 0.0 0.0
1991 1162 0.0 0.0 0.0
1993 1295 0.0 0.0 0.0

For data sources see[5]

References