X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325042313000

Well Details

Well ID: 0325042313000
Loading map...
Location: 00/13-23-032-04W5/0
Location Alias: 00/13-23-32-04 W5M
Location Alias 2: 00/13-23-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 23
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 13-23-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0022358
License Date: 1962-05-02
License Status: Abandoned
Spud Date: 1962-05-22
Final Drill Date: 1962-06-26
Well Total Depth: 2693.80 m
Surface Hole Latitude: 51.763324
Surface Hole Longitude: -114.469878

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-04-29 Perforation Treatment Performed - Permeator Perforation
1962-05-02 Obtained License
1962-06-26 Finished Drilling
1962-06-26 Well Mode changed to Drilled and Cased
1962-06-29 Production Casing Operation Performed
1962-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-07-04 Perforation Treatment Performed - Acid Wash - No Pressure
1962-07-06 Well Began Production
1962-07-06 Well Fluid changed to Crude Oil
1962-07-06 Well Mode changed to Flowing
1962-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-11 Well Fluid changed to Crude Oil
1963-03-11 Well Mode changed to Pumping
1998-04-09 Well Fluid changed to Crude Oil
1998-04-09 Well Mode changed to Suspended
2008-02-02 Well Log Performed
2008-02-06 Perforation Treatment Performed - Jet Perforation
2008-02-06 Well Log Performed
2008-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-07 Plug Back Performed
2008-02-07 Well Fluid changed to Crude Oil
2008-02-07 Well Mode changed to Abandoned Zone
2008-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-08 Perforation Treatment Performed - Remedial Casing
2008-02-10 Perforation Treatment Performed - Jet Perforation
2008-02-10 Well Log Performed
2008-02-11 Perforation Treatment Performed - Remedial Casing
2008-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-13 Perforation Treatment Performed - Jet Perforation
2008-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-14 Perforation Treatment Performed - Remedial Casing
2008-02-15 Perforation Treatment Performed - Jet Perforation
2008-02-15 Well Log Performed
2008-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-18 Perforation Treatment Performed - Jet Perforation
2008-02-18 Perforation Treatment Performed - Remedial Casing
2008-02-19 Perforation Treatment Performed - Jet Perforation
2008-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-20 Perforation Treatment Performed - Remedial Casing
2008-02-28 Perforation Treatment Performed - Jet Perforation
2008-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-12 Perforation Treatment Performed - Remedial Casing
2008-10-24 Well Abandoned
2008-10-24 Well Fluid changed to Crude Oil
2008-10-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-04-29 Permeator Perforation 2653.90 2656.90 10
2008-02-08 Remedial Casing Cementing 2065.00 2066.00 0
2008-02-08 Packing Device Capped w/Cement 1940.00 2058.00 0
2008-02-10 Perforation 1425.00 1426.00 17
2008-02-11 Remedial Casing Cementing 1425.00 1426.00 0
2008-02-13 Packing Device Capped w/Cement 1044.50 1515.00 0
2008-02-13 Perforation 650.00 651.00 17
2008-02-14 Remedial Casing Cementing 650.00 651.00 0
2008-02-14 Packing Device Capped w/Cement 608.00 643.00 0
2008-02-15 Perforation 468.00 470.00 17
2008-02-18 Remedial Casing Cementing 468.00 470.00 0
1962-04-29 Permeator Perforation 2658.80 2660.60 10
2008-02-18 Packing Device Capped w/Cement 440.00 460.00 0
2008-02-18 Perforation 435.00 436.00 17
2008-02-19 Perforation 415.00 416.00 17
2008-02-19 Perforation 390.00 391.00 17
2008-02-19 Perforation 377.00 378.00 17
2008-02-19 Perforation 350.00 351.00 17
2008-02-19 Perforation 325.00 326.00 17
2008-02-19 Perforation 305.00 306.00 17
2008-02-19 Perforation 270.00 271.00 17
2008-02-19 Perforation 257.00 258.00 17
1962-04-29 Permeator Perforation 2661.80 2664.90 10
2008-02-19 Perforation 242.00 243.00 17
2008-02-20 Remedial Casing Cementing 242.00 436.00 0
2008-02-20 Packing Device Capped w/Cement 226.00 234.00 0
2008-02-28 Perforation 200.00 201.00 17
2008-03-12 Remedial Casing Cementing 200.00 201.00 0
2008-03-12 Packing Device Capped w/Cement 189.00 197.00 0
1962-04-29 Permeator Perforation 2667.00 2668.20 10
1962-07-04 Acid Wash 2653.90 2668.20 0
1962-07-04 Acid Treatment 2653.90 2668.20 0
1962-07-19 Acid Treatment 2653.90 2668.20 0
2008-02-06 Perforation 2065.00 2066.00 17
2008-02-07 Packing Device Capped w/Cement 2634.00 2642.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1980 6390 0.0 0.0 0.0
1981 3408 0.0 0.0 0.0
1982 6415 0.0 0.0 0.0
1983 8119 0.0 0.0 0.0
1984 8038 0.0 0.0 0.0
1985 7382 0.0 0.0 0.0
1986 5957 0.0 0.0 0.0
1987 7988 0.0 0.0 0.0
1988 2714 0.0 0.0 0.0
1989 4200 0.0 0.0 0.0
1990 7446 0.0 0.0 0.0
1991 2000 0.0 0.0 0.0

For data sources see[5]

References