X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325041413000

Well Details

Well ID: 0325041413000
Loading map...
Location: 00/13-14-032-04W5/0
Location Alias: 00/13-14-32-04 W5M
Location Alias 2: 00/13-14-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 14
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 13-14-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0022934
License Date: 1962-08-29
License Status: Suspension
Spud Date: 1962-09-17
Final Drill Date: 1962-10-22
Well Total Depth: 2708.10 m
Surface Hole Latitude: 51.748862
Surface Hole Longitude: -114.469876

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-08-29 Obtained License
1962-10-22 Finished Drilling
1962-10-22 Well Mode changed to Drilled and Cased
1962-10-24 Drill Stem Test Performed
1962-10-25 Production Casing Operation Performed
1962-10-26 Perforation Treatment Performed - Jet Perforation
1962-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-11-02 Well Began Production
1962-11-02 Well Fluid changed to Crude Oil
1962-11-02 Well Mode changed to Flowing
1975-05-30 Well Fluid changed to Crude Oil
1975-05-30 Well Mode changed to Pumping
1975-07-29 Perforation Treatment Performed - Cement Squeeze
1975-07-31 Perforation Treatment Performed - Jet Perforation
1975-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-15 Perforation Treatment Performed - Jet Perforation
1988-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-05 Well Fluid changed to Crude Oil
1998-05-05 Well Mode changed to Suspended
2003-05-29 Well Fluid changed to Crude Oil
2003-05-29 Well Mode changed to Pumping
2003-05-31 Well Fluid changed to Crude Oil
2003-05-31 Well Mode changed to Suspended
2007-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-12 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-10-26 Perforation 2663.60 2668.50 3
1975-07-31 Perforation 2681.60 2686.50 7
1975-08-01 Acid Treatment 2663.60 2680.40 0
1975-08-01 Acid Treatment 2663.60 2680.40 0
1988-06-15 Perforation 2662.70 2686.50 13
1988-06-16 Acid Treatment 2662.70 2686.50 0
2007-11-12 Packing Device Capped w/Cement 2652.00 2660.00 0
1962-10-26 Perforation 2669.40 2671.00 3
1962-10-26 Perforation 2672.20 2673.40 3
1962-10-26 Perforation 2676.40 2682.20 3
1962-10-26 Perforation 2684.10 2685.60 3
1962-11-02 Acid Treatment 2663.60 2685.60 0
1975-07-29 Cement Squeeze 2663.60 2680.40 0
1975-07-31 Perforation 2662.70 2665.20 7
1975-07-31 Perforation 2666.40 2670.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 744 0.0 0.0 0.0
1968 815 0.0 0.0 0.0
1969 6168 0.0 0.0 0.0
1970 5499 0.0 0.0 0.0
1971 5748 0.0 0.0 0.0
1972 4757 0.0 0.0 0.0
1973 6238 0.0 0.0 0.0
1988 2624 0.0 0.0 0.0
1989 6794 0.0 0.0 0.0
1990 5323 0.0 0.0 0.0
1991 7028 0.0 0.0 0.0
1992 2490 0.0 0.0 0.0
1993 6508 0.0 0.0 0.0
1994 7222 0.0 0.0 0.0
1995 2240 0.0 0.0 0.0

For data sources see[5]

References