X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325040910002

Well Details

Well ID: 0325040910002
Loading map...
Location: 00/10-09-032-04W5/2
Location Alias: 00/10-09-32-04 W5M
Location Alias 2: 00/10-09-032-04 W5/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 09
County/Municipality: Mountain View County
Well Name: CDN-SUP H.W. BASS HARM 10-9L-32-4
Operator Name: ExxonMobil Canada Resources Company
License Number: 0030230
License Date: 1966-03-14
License Status: RecCertified
Spud Date: 1966-04-06
Final Drill Date: 1966-06-09
Well Total Depth: 3371.10 m
Surface Hole Latitude: 51.731705
Surface Hole Longitude: -114.506331

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-03-14 Obtained License
1966-05-05 Drill Stem Test Performed
1966-06-09 Finished Drilling
1966-06-10 Production Casing Operation Performed
1966-06-18 Perforation Treatment Performed - Jet Perforation
1966-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-20 Perforation Treatment Performed - Acid Wash - No Pressure
1966-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-22 Perforation Treatment Performed - Acid Wash - No Pressure
1966-06-22 Perforation Treatment Performed - Jet Perforation
1966-07-30 Perforation Treatment Performed - Fractured
1966-08-02 Perforation Treatment Performed - Fractured
1966-08-03 Perforation Treatment Performed - Cement Squeeze
1966-08-03 Perforation Treatment Performed - Jet Perforation
1966-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-08-11 Perforation Treatment Performed - Jet Perforation
1966-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-08-22 Perforation Treatment Performed - Acid Wash - No Pressure
1966-08-22 Perforation Treatment Performed - Jet Perforation
1966-08-23 Perforation Treatment Performed - Cement Squeeze
1966-08-28 Perforation Treatment Performed - Bullet Perforation
1966-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-01 Perforation Treatment Performed - Cement Squeeze
1966-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-05 Perforation Treatment Performed - Jet Perforation
1966-09-06 Perforation Treatment Performed - Jet Perforation
1966-09-07 Perforation Treatment Performed - Acid Wash - No Pressure
1966-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-04 Perforation Treatment Performed - Cement Squeeze
1967-08-07 Perforation Treatment Performed - Jet Perforation
1967-08-08 Well Mode changed to Drilled and Cased
1968-06-25 Perforation Treatment Performed - Cement Squeeze
1968-06-25 Well Mode changed to Abandoned and Whipstocked
1989-08-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-06-18 Perforation 3332.40 3337.60 7
1966-08-02 Fracture 3332.40 3350.40 0
1966-08-03 Perforation 3361.30 3365.00 7
1966-08-03 Cement Squeeze 3361.30 3365.00 0
1966-08-09 Acid Treatment 3332.40 3350.40 0
1966-08-11 Perforation 3332.40 3337.60 7
1966-08-11 Perforation 3340.90 3350.40 7
1966-08-13 Acid Treatment 3332.40 3350.40 0
1966-08-22 Perforation 3353.10 3354.00 13
1966-08-22 Perforation 3355.80 3357.10 10
1966-08-22 Acid Wash 3353.10 3357.10 0
1966-06-18 Perforation 3340.90 3350.40 7
1966-08-23 Cement Squeeze 3332.40 3357.10 0
1966-08-28 Bullet Perforation 3347.30 3349.80 13
1966-08-29 Acid Treatment 3347.30 3349.80 0
1966-08-31 Acid Treatment 3347.30 3349.80 0
1966-09-01 Cement Squeeze 3347.30 3349.80 0
1966-09-05 Perforation 3345.80 3347.30 13
1966-09-05 Acid Treatment 3345.80 3347.30 0
1966-09-06 Perforation 3331.50 3345.80 10
1966-09-07 Acid Wash 3331.50 3345.80 0
1966-09-08 Acid Treatment 3331.50 3347.30 0
1966-06-20 Acid Wash 3332.40 3350.40 0
1966-09-09 Acid Treatment 3331.50 3347.30 0
1966-09-24 Acid Treatment 3331.50 3347.30 0
1967-08-04 Cement Squeeze 3331.50 3347.30 0
1967-08-07 Perforation 2627.70 2631.00 13
1968-06-25 Cement Squeeze 2627.70 2631.00 0
1966-06-20 Acid Treatment 3332.40 3350.40 0
1966-06-22 Perforation 3332.40 3340.90 7
1966-06-22 Perforation 3340.90 3350.40 7
1966-06-22 Acid Wash 3332.40 3350.40 0
1966-06-22 Acid Treatment 3332.40 3350.40 0
1966-07-30 Fracture 3332.40 3350.40 0

For data sources see[4]



References