X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325040611002

Well Details

Well ID: 0325040611002
Loading map...
Location: 00/11-06-032-04W5/2
Location Alias: 00/11-06-32-04 W5M
Location Alias 2: 00/11-06-032-04 W5/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 06
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARM 11-6-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0017426
License Date: 1959-07-15
License Status: Suspension
Spud Date: 1959-07-24
Final Drill Date: 1985-03-02
Well Total Depth: 2847.00 m
Surface Hole Latitude: 51.716820
Surface Hole Longitude: -114.558337

For data sources see[1][2]

Well History

Date Event
1959-07-15 Obtained License
1959-09-08 Perforation Treatment Performed - Bullet Perforation
1959-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-13 Perforation Treatment Performed - Cement Squeeze
1985-03-02 Finished Drilling
1985-03-02 Perforation Treatment Performed - Open-Hole Completion
1985-03-02 Well Mode changed to Drilled and Cased
1985-03-05 Liner Casing Operation Performed
1985-03-05 Perforation Treatment Performed - Cement Squeeze
1985-03-09 Perforation Treatment Performed - Jet Perforation
1985-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-11 Rig Released
1985-10-02 Well Began Injection
1985-10-02 Well Fluid changed to Water
1985-10-02 Well Type changed to Disposal
1990-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-25 Perforation Treatment Performed - Chemical Squeeze
1993-06-01 Well Fluid changed to Water
1993-06-01 Well Mode changed to Suspended
1993-06-01 Well Type changed to Disposal
1997-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-08 Bullet Perforation 2807.20 2808.40 20
1991-04-25 Chemical Squeeze 2821.00 2828.00 0
1997-11-02 Packing Device Capped w/Cement 2719.00 2727.00 0
1959-09-08 Bullet Perforation 2808.40 2809.60 13
1959-09-11 Acid Treatment 2807.20 2809.60 0
1985-02-13 Cement Squeeze 2807.20 2809.60 0
1985-03-02 Open Hole/Barefoot Completion 2811.80 2847.00 0
1985-03-05 Cement Squeeze 2811.80 2847.00 0
1985-03-09 Perforation 2821.00 2828.00 13
1985-03-11 Acid Treatment 2821.00 2828.00 0
1990-03-09 Acid Treatment 2821.00 2828.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0

For data sources see[5]

References