X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325040204000

Well Details

Well ID: 0325040204000
Loading map...
Location: 00/04-02-032-04W5/0
Location Alias: 00/04-02-32-04 W5M
Location Alias 2: 00/04-02-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 02
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARM 4-2-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0020961
License Date: 1961-06-23
License Status: Suspension
Spud Date: 1961-06-25
Final Drill Date: 1961-09-14
Well Total Depth: 3503.70 m
Surface Hole Latitude: 51.708697
Surface Hole Longitude: -114.472092

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-06-23 Obtained License
1961-07-26 Drill Stem Test Performed
1961-07-30 Production Casing Operation Performed
1961-08-06 Drill Stem Test Performed
1961-09-08 Drill Stem Test Performed
1961-09-09 Drill Stem Test Performed
1961-09-13 Drill Stem Test Performed
1961-09-14 Finished Drilling
1961-09-26 Well Mode changed to Drilled and Cased
1961-12-11 Perforation Treatment Performed - Open-Hole Completion
1961-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-12 Perforation Treatment Performed - Bullet Perforation
1961-12-13 Perforation Treatment Performed - Cement Plug
1961-12-13 Perforation Treatment Performed - Jet Perforation
1961-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-19 Well Began Injection
1962-03-19 Well Fluid changed to Gas
1962-03-19 Well Type changed to Injection
1973-09-07 Well Began Production
1973-09-07 Well Fluid changed to Gas
1973-09-07 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-12-11 Open Hole/Barefoot Completion 2744.10 2747.20 0
1961-12-12 Acid Treatment 2744.10 2747.20 0
1961-12-12 Bullet Perforation 2723.40 2723.40 20
1961-12-13 Cement Plug 2718.80 2747.20 0
1961-12-13 Perforation 2694.70 2696.90 3
1961-12-13 Perforation 2699.90 2713.90 3
1961-12-15 Acid Treatment 2694.70 2713.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 116 0.0 0.0 0.0
1974 1751 0.0 0.0 0.0
1975 2027 0.0 0.0 0.0
1976 2188 0.0 0.0 0.0
1977 827 0.0 0.0 0.0
1978 1237 0.0 0.0 0.0
1979 91 0.0 0.0 0.0
1980 764 0.0 0.0 0.0
1981 556 0.0 0.0 0.0
1982 700 0.0 0.0 0.0
1988 67 0.0 0.0 0.0
1990 13 0.0 0.0 0.0
1994 4193 0.0 0.0 0.0
1995 8650 0.0 0.0 0.0
1996 8196 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8560 0.0 0.0 0.0
1999 8141 0.0 0.0 0.0
2000 8588 0.0 0.0 0.0
2001 8731 0.0 0.0 0.0
2002 8324 0.0 0.0 0.0
2003 8373 0.0 0.0 0.0
2004 8751 0.0 0.0 0.0
2005 8244 0.0 0.0 0.0
2006 8593 0.0 0.0 0.0
2007 8549 0.0 0.0 0.0
2008 8181 0.0 0.0 0.0
2009 8629 0.0 0.0 0.0
2010 8752 0.0 0.0 0.0
2011 8218 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 4954 0.0 0.0 0.0
2014 71 0.0 0.0 0.0

For data sources see[5]

References