X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325032916030

Well Details

Well ID: 0325032916030
Loading map...
Location: 03/16-29-032-03W5/0
Location Alias: 03/16-29-32-03 W5M
Location Alias 2: 03/16-29-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 29
County/Municipality: Mountain View County
Well Name: TAC ET AL HZ 103 HARME 16-29-32-3
Operator Name: Tamarack Acquisition Corp.
License Number: 0445895
License Date: 2012-05-15
License Status: Issued
Spud Date: 2012-05-17
Final Drill Date: 2012-05-28
Well Total Depth: 3422.00 m
Surface Hole Latitude: 51.765244
Surface Hole Longitude: -114.380587

For data sources see[1][2]

Well History

Date Event
2012-05-15 Obtained License
2012-05-20 Surface Casing Operation Performed
2012-05-22 Direction Drilling Operation Performed - Horizontal
2012-05-28 Finished Drilling
2012-05-28 Well Mode changed to Drilled and Cased
2012-05-30 Production Casing Operation Performed
2012-05-31 Rig Released
2012-07-03 Well Log Performed
2012-07-14 Well Began Production
2012-07-14 Well Fluid changed to Crude Oil
2012-07-14 Well Mode changed to Flowing
2012-07-18 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-24 Well Fluid changed to Crude Oil
2013-08-24 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-05-17 Excalibur Drilling Ltd. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-05-22 1655.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-18 Multi-Stage Fracture 3396.00 3396.50 0
2012-07-18 Multi-Stage Fracture 2746.00 2746.50 0
2012-07-18 Multi-Stage Fracture 2673.50 2674.00 0
2012-07-18 Multi-Stage Fracture 2590.00 2590.50 0
2012-07-18 Multi-Stage Fracture 2518.00 2518.50 0
2012-07-18 Multi-Stage Fracture 2435.00 2435.50 0
2012-07-18 Multi-Stage Fracture 2363.00 2363.50 0
2012-07-18 Multi-Stage Fracture 2291.00 2291.50 0
2012-07-18 Multi-Stage Fracture 2196.50 2197.00 0
2012-07-18 Multi-Stage Fracture 2123.50 2124.00 0
2012-07-18 Multi-Stage Fracture 3334.00 3334.50 0
2012-07-18 Multi-Stage Fracture 3262.00 3262.50 0
2012-07-18 Multi-Stage Fracture 3178.00 3178.50 0
2012-07-18 Multi-Stage Fracture 3107.00 3107.50 0
2012-07-18 Multi-Stage Fracture 3034.50 3035.00 0
2012-07-18 Multi-Stage Fracture 2963.00 2963.50 0
2012-07-18 Multi-Stage Fracture 2890.50 2891.00 0
2012-07-18 Multi-Stage Fracture 2818.00 2818.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3151 0.0 0.0 0.0
2013 8063 0.0 0.0 0.0
2014 8454 0.0 0.0 0.0
2015 8117 0.0 0.0 0.0
2016 8538 0.0 0.0 0.0
2017 8549 0.0 0.0 0.0
2018 8116 0.0 0.0 0.0
2019 8662 0.0 0.0 0.0
2020 2106 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-31 No Incident Encountered 0.00 0.00
2012-07-27 No Incident Encountered 0.00 0.00

For data sources see[8]

References