If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0325032816020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.765178,"lon":-114.360662,"icon":""}]} |
Location: 02/16-28-032-03W5/0 | |
Location Alias: 02/16-28-32-03 W5M | |
Location Alias 2: 02/16-28-032-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 5 | |
Range: 03 | |
Section: 28 | |
County/Municipality: Mountain View County | |
Well Name: RIDGEBACK HARME 16-28-32-3 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0447719 | |
License Date: 2012-08-13 | |
License Status: Issued | |
Spud Date: 2012-08-14 | |
Final Drill Date: 2012-08-23 | |
Well Total Depth: 3501.00 m | |
Surface Hole Latitude: 51.765178 | |
Surface Hole Longitude: -114.360662 |
Date | Event |
---|---|
2012-08-13 | Obtained License |
2012-08-16 | Surface Casing Operation Performed |
2012-08-18 | Direction Drilling Operation Performed - Deviate |
2012-08-19 | Direction Drilling Operation Performed - Horizontal |
2012-08-23 | Finished Drilling |
2012-08-23 | Well Log Performed |
2012-08-23 | Well Mode changed to Drilled and Cased |
2012-08-25 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-25 | Production Casing Operation Performed |
2012-08-25 | Rig Released |
2012-08-30 | Well Log Performed |
2012-09-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-14 | Well Began Production |
2012-09-14 | Well Fluid changed to Crude Oil |
2012-09-14 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-14 | Savanna Drilling Corp. | 652E | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-18 | 1600.80 | Deviate (5 - 79 degrees) |
2012-08-19 | 2065.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-25 | Open Hole/Barefoot Completion | 3498.00 | 3501.00 | 0 |
2012-09-13 | Multi-Stage Fracture | 2929.20 | 2929.30 | 0 |
2012-09-13 | Multi-Stage Fracture | 2852.50 | 2852.60 | 0 |
2012-09-13 | Multi-Stage Fracture | 2792.00 | 2792.10 | 0 |
2012-09-13 | Multi-Stage Fracture | 2729.40 | 2729.50 | 0 |
2012-09-13 | Multi-Stage Fracture | 2653.30 | 2653.40 | 0 |
2012-09-13 | Multi-Stage Fracture | 2592.40 | 2592.50 | 0 |
2012-09-13 | Multi-Stage Fracture | 2515.60 | 2515.70 | 0 |
2012-09-13 | Multi-Stage Fracture | 2455.20 | 2455.30 | 0 |
2012-09-13 | Multi-Stage Fracture | 2392.50 | 2392.60 | 0 |
2012-09-13 | Multi-Stage Fracture | 2317.50 | 2317.60 | 0 |
2012-09-13 | Multi-Stage Fracture | 3452.90 | 3453.00 | 0 |
2012-09-13 | Multi-Stage Fracture | 2255.70 | 2255.80 | 0 |
2012-09-13 | Multi-Stage Fracture | 2193.30 | 2193.40 | 0 |
2012-09-13 | Multi-Stage Fracture | 3389.20 | 3389.30 | 0 |
2012-09-13 | Multi-Stage Fracture | 3328.00 | 3328.10 | 0 |
2012-09-13 | Multi-Stage Fracture | 3253.10 | 3253.20 | 0 |
2012-09-13 | Multi-Stage Fracture | 3193.00 | 3193.10 | 0 |
2012-09-13 | Multi-Stage Fracture | 3130.50 | 3130.60 | 0 |
2012-09-13 | Multi-Stage Fracture | 3054.00 | 3054.10 | 0 |
2012-09-13 | Multi-Stage Fracture | 2991.80 | 2991.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1399 | 0.0 | 0.0 | 0.0 |
2013 | 8735 | 0.0 | 0.0 | 0.0 |
2014 | 8127 | 0.0 | 0.0 | 0.0 |
2015 | 8086 | 0.0 | 0.0 | 0.0 |
2016 | 8262 | 0.0 | 0.0 | 0.0 |
2017 | 8249 | 0.0 | 0.0 | 0.0 |
2018 | 7913 | 0.0 | 0.0 | 0.0 |
2019 | 8496 | 0.0 | 0.0 | 0.0 |
2020 | 2110 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-25 | No Incident Encountered | 0.00 | 0.00 |
2012-09-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]