If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0325032802S02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.75999,"lon":-114.37056,"icon":""}]} |
| Location: S0/02-28-032-03W5/2 | |
| Location Alias: S0/02-28-32-03 W5M | |
| Location Alias 2: S0/02-28-032-03 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 28 | |
| County/Municipality: Mountain View County | |
| Well Name: EMC HARME 11-21-32-3 | |
| Operator Name: ExxonMobil Canada Ltd. | |
| License Number: 0020285 | |
| License Date: 1961-01-17 | |
| License Status: Amended | |
| Spud Date: 1961-01-18 | |
| Final Drill Date: 1994-05-31 | |
| Well Total Depth: 3303.00 m | |
| Surface Hole Latitude: 51.759990 | |
| Surface Hole Longitude: -114.370560 |
| Date | Event |
|---|---|
| 1961-01-17 | Obtained License |
| 1994-04-25 | Well Log Performed |
| 1994-05-12 | Direction Drilling Operation Performed - Horizontal |
| 1994-05-31 | Finished Drilling |
| 1994-05-31 | Perforation Treatment Performed - Open-Hole Completion |
| 1994-05-31 | Well Log Performed |
| 1994-05-31 | Well Mode changed to Drilled and Cased |
| 1994-06-01 | Liner Casing Operation Performed |
| 1994-06-02 | Rig Released |
| 1994-06-09 | Well Log Performed |
| 1994-06-30 | Well Log Performed |
| 1994-07-05 | Well Began Production |
| 1994-07-05 | Well Fluid changed to Gas |
| 1994-07-05 | Well Mode changed to Flowing |
| 2009-04-01 | Well Fluid changed to Gas |
| 2009-04-01 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1994-05-12 | 2400.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-05-31 | Open Hole/Barefoot Completion | 2565.00 | 3303.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 4276 | 0.0 | 0.0 | 0.0 |
| 1995 | 8492 | 0.0 | 0.0 | 0.0 |
| 1996 | 8130 | 0.0 | 0.0 | 0.0 |
| 1997 | 8738 | 0.0 | 0.0 | 0.0 |
| 1998 | 8640 | 0.0 | 0.0 | 0.0 |
| 1999 | 8047 | 0.0 | 0.0 | 0.0 |
| 2000 | 8589 | 0.0 | 0.0 | 0.0 |
| 2001 | 8729 | 0.0 | 0.0 | 0.0 |
| 2002 | 8262 | 0.0 | 0.0 | 0.0 |
| 2003 | 8403 | 0.0 | 0.0 | 0.0 |
| 2004 | 8677 | 0.0 | 0.0 | 0.0 |
| 2005 | 8146 | 0.0 | 0.0 | 0.0 |
| 2006 | 8089 | 0.0 | 0.0 | 0.0 |
| 2007 | 7370 | 0.0 | 0.0 | 0.0 |
| 2008 | 7169 | 0.0 | 0.0 | 0.0 |
| 2009 | 8357 | 0.0 | 0.0 | 0.0 |
| 2010 | 8328 | 0.0 | 0.0 | 0.0 |
| 2011 | 6202 | 0.0 | 0.0 | 0.0 |
| 2012 | 7487 | 0.0 | 0.0 | 0.0 |
| 2013 | 7864 | 0.0 | 0.0 | 0.0 |
| 2014 | 8391 | 0.0 | 0.0 | 0.0 |
| 2015 | 8052 | 0.0 | 0.0 | 0.0 |
| 2016 | 8242 | 0.0 | 0.0 | 0.0 |
| 2017 | 8503 | 0.0 | 0.0 | 0.0 |
| 2018 | 6256 | 0.0 | 0.0 | 0.0 |
| 2019 | 3942 | 0.0 | 0.0 | 0.0 |
| 2020 | 1034 | 0.0 | 0.0 | 0.0 |
For data sources see[6]