Well ID: 0325032214020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.750577,"lon":-114.349894,"icon":""}]} |
Location: 02/14-22-032-03W5/0 | |
Location Alias: 02/14-22-32-03 W5M | |
Location Alias 2: 02/14-22-032-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 5 | |
Range: 03 | |
Section: 22 | |
County/Municipality: Mountain View County | |
Well Name: RIDGEBACK HARME 14-22-32-3 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0445297 | |
License Date: 2012-04-09 | |
License Status: Issued | |
Spud Date: 2012-07-15 | |
Final Drill Date: 2012-07-27 | |
Well Total Depth: 3524.00 m | |
Surface Hole Latitude: 51.750577 | |
Surface Hole Longitude: -114.349894 |
Date | Event |
---|---|
2012-04-09 | Obtained License |
2012-07-17 | Surface Casing Operation Performed |
2012-07-20 | Direction Drilling Operation Performed - Deviate |
2012-07-21 | Direction Drilling Operation Performed - Horizontal |
2012-07-27 | Finished Drilling |
2012-07-27 | Well Log Performed |
2012-07-27 | Well Mode changed to Drilled and Cased |
2012-07-28 | Perforation Treatment Performed - Open-Hole Completion |
2012-07-28 | Production Casing Operation Performed |
2012-07-29 | Rig Released |
2012-08-09 | Well Log Performed |
2012-08-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-19 | Well Began Production |
2012-08-19 | Well Fluid changed to Crude Oil |
2012-08-19 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-15 | Savanna Drilling Corp. | 652E | N/A | Drill To LD |
2012-07-15 | Savanna Drilling Corp. | 652E | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-20 | 1624.50 | Deviate (5 - 79 degrees) |
2012-07-21 | 2121.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-28 | Open Hole/Barefoot Completion | 3520.00 | 3524.00 | 0 |
2012-08-16 | Multi-Stage Fracture | 2958.10 | 2958.20 | 0 |
2012-08-16 | Multi-Stage Fracture | 2896.80 | 2896.90 | 0 |
2012-08-16 | Multi-Stage Fracture | 2822.20 | 2822.30 | 0 |
2012-08-16 | Multi-Stage Fracture | 2762.10 | 2762.20 | 0 |
2012-08-17 | Multi-Stage Fracture | 2687.50 | 2687.60 | 0 |
2012-08-17 | Multi-Stage Fracture | 2628.70 | 2628.80 | 0 |
2012-08-17 | Multi-Stage Fracture | 2556.00 | 2556.10 | 0 |
2012-08-17 | Multi-Stage Fracture | 2496.10 | 2496.20 | 0 |
2012-08-17 | Multi-Stage Fracture | 2420.70 | 2420.80 | 0 |
2012-08-17 | Multi-Stage Fracture | 2361.20 | 2361.30 | 0 |
2012-08-16 | Multi-Stage Fracture | 3494.10 | 3494.20 | 0 |
2012-08-17 | Multi-Stage Fracture | 2286.90 | 2287.00 | 0 |
2012-08-17 | Multi-Stage Fracture | 2226.80 | 2226.90 | 0 |
2012-08-16 | Multi-Stage Fracture | 3426.70 | 3426.80 | 0 |
2012-08-16 | Multi-Stage Fracture | 3365.60 | 3365.70 | 0 |
2012-08-16 | Multi-Stage Fracture | 3290.90 | 3291.00 | 0 |
2012-08-16 | Multi-Stage Fracture | 3229.70 | 3229.80 | 0 |
2012-08-16 | Multi-Stage Fracture | 3156.30 | 3156.40 | 0 |
2012-08-16 | Multi-Stage Fracture | 3093.80 | 3093.90 | 0 |
2012-08-16 | Multi-Stage Fracture | 3031.10 | 3031.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2352 | 0.0 | 0.0 | 0.0 |
2013 | 8696 | 0.0 | 0.0 | 0.0 |
2014 | 8591 | 0.0 | 0.0 | 0.0 |
2015 | 8153 | 0.0 | 0.0 | 0.0 |
2016 | 8513 | 0.0 | 0.0 | 0.0 |
2017 | 8591 | 0.0 | 0.0 | 0.0 |
2018 | 7646 | 0.0 | 0.0 | 0.0 |
2019 | 8383 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-29 | No Incident Encountered | 0.00 | 0.00 |
2012-08-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]