X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325032001000

Well Details

Well ID: 0325032001000
Loading map...
Location: 00/01-20-032-03W5/0
Location Alias: 00/01-20-32-03 W5M
Location Alias 2: 00/01-20-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 20
County/Municipality: Mountain View County
Well Name: TAC ET AL HZ HARME 1-20-32-3
Operator Name: Tamarack Acquisition Corp.
License Number: 0433266
License Date: 2011-05-02
License Status: Issued
Spud Date: 2011-06-01
Final Drill Date: 2011-06-16
Well Total Depth: 3200.00 m
Surface Hole Latitude: 51.765244
Surface Hole Longitude: -114.380760

For data sources see[1][2]

Well History

Date Event
2011-05-02 Obtained License
2011-06-01 Well Log Performed
2011-06-05 Surface Casing Operation Performed
2011-06-08 Direction Drilling Operation Performed - Horizontal
2011-06-11 Intermediate Casing Operation Performed
2011-06-16 Finished Drilling
2011-06-16 Well Log Performed
2011-06-16 Well Mode changed to Drilled and Cased
2011-06-18 Liner Casing Operation Performed
2011-06-19 Rig Released
2011-07-01 Well Began Production
2011-07-01 Well Fluid changed to Crude Oil
2011-07-01 Well Mode changed to Flowing
2011-07-06 Well Log Performed
2011-07-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-14 Well Fluid changed to Crude Oil
2012-08-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-06-08 1620.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-07-09 Multi-Stage Fracture 3185.00 3185.50 0
2011-07-09 Multi-Stage Fracture 2565.00 2565.50 0
2011-07-09 Multi-Stage Fracture 2505.00 2505.50 0
2011-07-09 Multi-Stage Fracture 2430.00 2430.50 0
2011-07-09 Multi-Stage Fracture 2357.00 2357.50 0
2011-07-09 Multi-Stage Fracture 2285.00 2285.50 0
2011-07-09 Multi-Stage Fracture 2212.00 2212.50 0
2011-07-09 Multi-Stage Fracture 2166.00 2166.50 0
2011-07-09 Multi-Stage Fracture 3136.00 3136.50 0
2011-07-09 Multi-Stage Fracture 3063.00 3063.50 0
2011-07-09 Multi-Stage Fracture 2989.00 2989.50 0
2011-07-09 Multi-Stage Fracture 2917.00 2917.50 0
2011-07-09 Multi-Stage Fracture 2847.00 2847.50 0
2011-07-09 Multi-Stage Fracture 2773.00 2773.50 0
2011-07-09 Multi-Stage Fracture 2712.00 2712.50 0
2011-07-09 Multi-Stage Fracture 2640.00 2640.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2935 0.0 0.0 0.0
2012 7166 0.0 0.0 0.0
2013 8013 0.0 0.0 0.0
2014 8227 0.0 0.0 0.0
2015 8542 0.0 0.0 0.0
2016 8665 0.0 0.0 0.0
2017 8688 0.0 0.0 0.0
2018 8103 0.0 0.0 0.0
2019 6846 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[6]

References