If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0325031414020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 02/14-14-032-03W5/0 | |
| Location Alias: 02/14-14-32-03 W5M | |
| Location Alias 2: 02/14-14-032-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 14 | |
| County/Municipality: Mountain View County | |
| Well Name: NAL HARME 14-14-32-3 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0420562 | |
| License Date: 2010-05-20 | |
| License Status: Suspension | |
| Spud Date: 2010-06-19 | |
| Final Drill Date: 2010-07-04 | |
| Well Total Depth: 3108.50 m | |
| Surface Hole Latitude: 51.738664 | |
| Surface Hole Longitude: -114.323470 |
| Date | Event |
|---|---|
| 2010-05-20 | Obtained License |
| 2010-06-21 | Surface Casing Operation Performed |
| 2010-06-25 | Well Log Performed |
| 2010-06-27 | Direction Drilling Operation Performed - Horizontal |
| 2010-06-30 | Intermediate Casing Operation Performed |
| 2010-07-04 | Finished Drilling |
| 2010-07-04 | Well Log Performed |
| 2010-07-04 | Well Mode changed to Drilled and Cased |
| 2010-07-06 | Liner Casing Operation Performed |
| 2010-07-06 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-07-07 | Rig Released |
| 2010-07-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-09-04 | Well Began Production |
| 2010-09-04 | Well Fluid changed to Crude Oil |
| 2010-09-04 | Well Mode changed to Pumping |
| 2016-11-01 | Well Fluid changed to Crude Oil |
| 2016-11-01 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-06-27 | 1712.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-07-06 | Open Hole/Barefoot Completion | 2108.00 | 3108.50 | 0 |
| 2010-07-11 | Multi-Stage Fracture | 2180.00 | 2180.10 | 0 |
| 2010-07-11 | Multi-Stage Fracture | 2310.00 | 2310.10 | 0 |
| 2010-07-11 | Multi-Stage Fracture | 2426.00 | 2426.10 | 0 |
| 2010-07-11 | Multi-Stage Fracture | 2556.00 | 2556.10 | 0 |
| 2010-07-11 | Multi-Stage Fracture | 2684.00 | 2684.10 | 0 |
| 2010-07-11 | Multi-Stage Fracture | 2798.00 | 2798.10 | 0 |
| 2010-07-11 | Multi-Stage Fracture | 2925.00 | 2925.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 2556 | 0.0 | 0.0 | 0.0 |
| 2011 | 7607 | 0.0 | 0.0 | 0.0 |
| 2012 | 8740 | 0.0 | 0.0 | 0.0 |
| 2013 | 8167 | 0.0 | 0.0 | 0.0 |
| 2014 | 4253 | 0.0 | 0.0 | 0.0 |
For data sources see[6]