If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0325031414020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.738664,"lon":-114.32347,"icon":""}]} |
Location: 02/14-14-032-03W5/0 | |
Location Alias: 02/14-14-32-03 W5M | |
Location Alias 2: 02/14-14-032-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 5 | |
Range: 03 | |
Section: 14 | |
County/Municipality: Mountain View County | |
Well Name: NAL HARME 14-14-32-3 | |
Operator Name: NAL Resources Limited | |
License Number: 0420562 | |
License Date: 2010-05-20 | |
License Status: Suspension | |
Spud Date: 2010-06-19 | |
Final Drill Date: 2010-07-04 | |
Well Total Depth: 3108.50 m | |
Surface Hole Latitude: 51.738664 | |
Surface Hole Longitude: -114.323470 |
Date | Event |
---|---|
2010-05-20 | Obtained License |
2010-06-21 | Surface Casing Operation Performed |
2010-06-25 | Well Log Performed |
2010-06-27 | Direction Drilling Operation Performed - Horizontal |
2010-06-30 | Intermediate Casing Operation Performed |
2010-07-04 | Finished Drilling |
2010-07-04 | Well Log Performed |
2010-07-04 | Well Mode changed to Drilled and Cased |
2010-07-06 | Liner Casing Operation Performed |
2010-07-06 | Perforation Treatment Performed - Open-Hole Completion |
2010-07-07 | Rig Released |
2010-07-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-09-04 | Well Began Production |
2010-09-04 | Well Fluid changed to Crude Oil |
2010-09-04 | Well Mode changed to Pumping |
2016-11-01 | Well Fluid changed to Crude Oil |
2016-11-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-06-27 | 1712.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-07-06 | Open Hole/Barefoot Completion | 2108.00 | 3108.50 | 0 |
2010-07-11 | Multi-Stage Fracture | 2180.00 | 2180.10 | 0 |
2010-07-11 | Multi-Stage Fracture | 2310.00 | 2310.10 | 0 |
2010-07-11 | Multi-Stage Fracture | 2426.00 | 2426.10 | 0 |
2010-07-11 | Multi-Stage Fracture | 2556.00 | 2556.10 | 0 |
2010-07-11 | Multi-Stage Fracture | 2684.00 | 2684.10 | 0 |
2010-07-11 | Multi-Stage Fracture | 2798.00 | 2798.10 | 0 |
2010-07-11 | Multi-Stage Fracture | 2925.00 | 2925.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2556 | 0.0 | 0.0 | 0.0 |
2011 | 7607 | 0.0 | 0.0 | 0.0 |
2012 | 8740 | 0.0 | 0.0 | 0.0 |
2013 | 8167 | 0.0 | 0.0 | 0.0 |
2014 | 4253 | 0.0 | 0.0 | 0.0 |
For data sources see[6]