If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0325031114020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.721595,"lon":-114.326229,"icon":""}]} |
| Location: 02/14-11-032-03W5/0 | |
| Location Alias: 02/14-11-32-03 W5M | |
| Location Alias 2: 02/14-11-032-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 11 | |
| County/Municipality: Mountain View County | |
| Well Name: CRL HZ 102 HARME 14-11-32-3 | |
| Operator Name: Coastal Resources Limited | |
| License Number: 0470890 | |
| License Date: 2014-10-27 | |
| License Status: Issued | |
| Spud Date: 2014-12-02 | |
| Final Drill Date: 2014-12-16 | |
| Well Total Depth: 3535.00 m | |
| Surface Hole Latitude: 51.721595 | |
| Surface Hole Longitude: -114.326229 |
| Date | Event |
|---|---|
| 2014-10-27 | Obtained License |
| 2014-12-02 | Surface Casing Operation Performed |
| 2014-12-05 | Direction Drilling Operation Performed - Deviate |
| 2014-12-09 | Direction Drilling Operation Performed - Horizontal |
| 2014-12-11 | Intermediate Casing Operation Performed |
| 2014-12-16 | Finished Drilling |
| 2014-12-16 | Well Log Performed |
| 2014-12-16 | Well Mode changed to Drilled and Cased |
| 2014-12-19 | Liner Casing Operation Performed |
| 2014-12-20 | Rig Released |
| 2015-01-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-02-12 | Well Began Production |
| 2015-02-12 | Well Fluid changed to Crude Oil |
| 2015-02-12 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-12-02 | Trinidad Drilling Ltd. | 2 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-12-05 | 460.20 | Deviate (5 - 79 degrees) |
| 2014-12-09 | 2088.40 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-01-06 | Multi-Stage Fracture | 3507.20 | 3507.30 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2889.40 | 2889.50 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2816.90 | 2817.00 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2744.30 | 2744.40 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2671.70 | 2671.80 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2612.80 | 2612.90 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2541.80 | 2541.90 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2469.30 | 2469.40 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2397.70 | 2397.80 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2325.30 | 2325.40 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2266.30 | 2266.40 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 3441.40 | 3441.50 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2207.30 | 2207.40 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 3368.80 | 3368.90 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 3296.20 | 3296.30 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 3223.70 | 3223.80 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 3164.70 | 3164.80 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 3092.20 | 3092.30 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 3019.80 | 3019.90 | 0 |
| 2015-01-06 | Multi-Stage Fracture | 2948.40 | 2948.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-01-06 | 2015-01-06 | 1,958 | 3,043 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 84.4801 | N/A | |||
| Sand (20/40) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 5.9618 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 5.9618 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 5.9617 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 5.9618 | N/A | ||||
| Sand (30/50) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 8.2088 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 8.2088 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 8.2088 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 8.2089 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0125 | N/A | |
| Water | 7732-18-5 | 100 | 0.0125 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.1837 | N/A | |
| Water | 7732-18-5 | 100 | 0.1837 | N/A | ||||
| Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 1.5943 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 1.5943 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0719 | N/A | |
| CAN-2403 nanoFLO | Canyon | Surfactant | Ethanol | 64-17-5 | 100 | 0.0828 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0828 | N/A | ||||
| Terpenes and Terpenoids. sweet orange-oil | 68647-72-3 | 100 | 0.0828 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0828 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-12-28 | 2015-01-03 | Surface Water - Runoff | 2868 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 7170 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8423 | 0.0 | 0.0 | 0.0 |
| 2018 | 8639 | 0.0 | 0.0 | 0.0 |
| 2019 | 8543 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-12-20 | No Incident Encountered | 0.00 | 0.00 |
| 2015-01-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]