X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325030803000

Well Details

Well ID: 0325030803000
Loading map...
Location: 00/03-08-032-03W5/0
Location Alias: 00/03-08-32-03 W5M
Location Alias 2: 00/03-08-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 08
County/Municipality: Mountain View County
Well Name: EMCL / EMCW HZ HARME 3-8-32-3
Operator Name: ExxonMobil Canada Ltd.
License Number: 0451838
License Date: 2012-12-11
License Status: Issued
Spud Date: 2013-01-27
Final Drill Date: 2013-02-04
Well Total Depth: 3696.00 m
Surface Hole Latitude: 51.737340
Surface Hole Longitude: -114.392791

For data sources see[1][2]

Well History

Date Event
2012-12-11 Obtained License
2013-01-28 Surface Casing Operation Performed
2013-01-30 Direction Drilling Operation Performed - Deviate
2013-01-31 Well Log Performed
2013-02-01 Direction Drilling Operation Performed - Horizontal
2013-02-04 Finished Drilling
2013-02-04 Well Log Performed
2013-02-04 Well Mode changed to Drilled and Cased
2013-02-05 Perforation Treatment Performed - Open-Hole Completion
2013-02-05 Production Casing Operation Performed
2013-02-05 Rig Released
2013-05-22 Well Log Performed
2013-07-13 Perforation Treatment Performed - Multi-Stage Fracture
2013-07-14 Well Began Production
2013-07-14 Well Fluid changed to Crude Oil
2013-07-14 Well Mode changed to Flowing
2013-10-06 Well Fluid changed to Crude Oil
2013-10-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-26 Nabors Drilling Limited 30 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-01-30 1097.00 Deviate (5 - 79 degrees)
2013-02-01 2226.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-05 Open Hole/Barefoot Completion 3687.00 3696.00 0
2013-07-13 Multi-Stage Fracture 2914.50 2914.60 0
2013-07-13 Multi-Stage Fracture 2825.10 2825.20 0
2013-07-13 Multi-Stage Fracture 2737.60 2737.70 0
2013-07-13 Multi-Stage Fracture 2645.10 2645.20 0
2013-07-13 Multi-Stage Fracture 2552.80 2552.90 0
2013-07-13 Multi-Stage Fracture 2475.90 2476.00 0
2013-07-13 Multi-Stage Fracture 2385.90 2386.00 0
2013-07-13 Multi-Stage Fracture 3651.30 3651.40 0
2013-07-13 Multi-Stage Fracture 3558.00 3558.10 0
2013-07-13 Multi-Stage Fracture 3469.30 3469.40 0
2013-07-13 Multi-Stage Fracture 3368.20 3368.30 0
2013-07-13 Multi-Stage Fracture 3280.10 3280.20 0
2013-07-13 Multi-Stage Fracture 3192.30 3192.40 0
2013-07-13 Multi-Stage Fracture 3105.60 3105.70 0
2013-07-13 Multi-Stage Fracture 3002.00 3002.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-13 2013-07-13 2,023 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Flowback Water Not Available 100 5.6888 N/A
Fresh water mix Not Available 100 79.9164 N/A
Slickwater; N002 Schlumberger Crystalline silica 14808-60-7 100 7.5417 N/A
Potash Fluid Experts Clay Control Potassium Chloride 7447-40-7 100 1.7072 N/A
Sodium Chloride 8028-77-1 100 0.0172 N/A
Slickwater; N002 Schlumberger Energizing Fluid 2-methyl-2h-isothiazol-3-one 2682-20-4 100 0 N/A
5-chloro-2-methyl-2h-isothiazolol-3-one 26172-55-4 100 0.0002 N/A
Acetic acid 64-19-7 100 0 N/A
Acetic acid; potassium salt 127-08-2 100 0 N/A
Acrylamide; 2-acrylamido-2-methylpropanesulfonic
acid; sodiu
38193-60-1 100 0.0074 N/A
Alcohol; C11-14; ethoxylated 78330-21-9 100 0.0006 N/A
Alcohols; C9-11-iso-; C10-rich 68526-85-2 100 0.0006 N/A
Cristobalite 14464-46-1 100 0 N/A
Diatomaceous earth; calcined 91053-39-3 100 0.0022 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0008 N/A
Distillates (petroleum); hydrotreated light 64742-47-8 100 0.0067 N/A
Magnesium chloride 7786-30-3 100 0.0002 N/A
Magnesium nitrate 10377-60-3 100 0.0004 N/A
Nitrogen; liquid form 7727-37-9 100 5.0856 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0198 N/A
Potassium hydroxide 1310-58-3 100 0 N/A
Propan-2-ol 67-63-0 100 0.0001 N/A
Sodium chloride 7647-14-5 100 0.0032 N/A
Sorbitan monooleate; ethoxylated 9005-65-6 100 0.0003 N/A
Sorbitan; (Z)-9-octadecenoate (2:3) 8007-43-0 100 0.0005 N/A
Tetrasodium ethylenediaminetetraacetate 64-02-8 100 0 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-07-12 2013-07-12 Recycled Fracturing Water (treated at well site) 221
2013-06-18 2013-07-13 Central Water Distribution Facility 2953

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 2189 0.0 0.0 0.0
2014 6992 0.0 0.0 0.0
2015 7166 0.0 0.0 0.0
2016 6075 0.0 0.0 0.0
2017 7691 0.0 0.0 0.0
2018 7904 0.0 0.0 0.0
2019 8226 0.0 0.0 0.0
2020 1712 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-05 No Incident Encountered 0.00 0.00
2013-10-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References