X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325030715000

Well Details

Well ID: 0325030715000
Loading map...
Location: 00/15-07-032-03W5/0
Location Alias: 00/15-07-32-03 W5M
Location Alias 2: 00/15-07-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 07
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 15-7-32-3
Operator Name: ExxonMobil Canada Ltd.
License Number: 0019798
License Date: 1960-10-03
License Status: Abandoned
Spud Date: 1960-10-05
Final Drill Date: 1960-11-04
Well Total Depth: 2616.70 m
Surface Hole Latitude: 51.734892
Surface Hole Longitude: -114.412186

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-10-03 Obtained License
1960-11-04 Finished Drilling
1960-11-04 Well Mode changed to Drilled and Cased
1960-11-06 Perforation Treatment Performed - Jet Perforation
1960-11-06 Production Casing Operation Performed
1960-11-14 Well Began Production
1960-11-14 Well Fluid changed to Crude Oil
1960-11-14 Well Mode changed to Flowing
1984-07-25 Well Log Performed
1985-09-10 Well Fluid changed to Crude Oil
1985-09-10 Well Mode changed to Gas Lift
2009-01-10 Perforation Treatment Performed - Cement Plug
2009-01-10 Perforation Treatment Performed - Jet Perforation
2009-01-10 Plug Back Performed
2009-01-10 Well Fluid changed to Crude Oil
2009-01-10 Well Mode changed to Abandoned Zone
2009-01-11 Well Log Performed
2009-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-12 Perforation Treatment Performed - Remedial Casing
2009-01-13 Well Log Performed
2009-01-15 Perforation Treatment Performed - Jet Perforation
2009-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-16 Perforation Treatment Performed - Remedial Casing
2009-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-17 Perforation Treatment Performed - Jet Perforation
2009-01-17 Perforation Treatment Performed - Remedial Casing
2009-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-18 Perforation Treatment Performed - Jet Perforation
2009-01-18 Perforation Treatment Performed - Remedial Casing
2009-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-19 Perforation Treatment Performed - Jet Perforation
2009-01-19 Perforation Treatment Performed - Remedial Casing
2009-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-18 Well Abandoned
2010-05-18 Well Fluid changed to Crude Oil
2010-05-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-11-06 Perforation 2590.50 2591.70 7
2009-01-16 Remedial Casing Cementing 1607.00 1608.00 0
2009-01-16 Packing Device Capped w/Cement 1580.00 1600.00 0
2009-01-17 Perforation 1334.00 1335.00 17
2009-01-17 Remedial Casing Cementing 1334.00 1335.00 0
2009-01-17 Packing Device Capped w/Cement 1263.00 1329.00 0
2009-01-18 Perforation 883.00 884.00 17
2009-01-18 Perforation 742.50 743.50 17
2009-01-18 Remedial Casing Cementing 883.00 884.00 0
2009-01-18 Remedial Casing Cementing 742.50 743.50 0
2009-01-18 Packing Device Capped w/Cement 671.00 737.00 0
2009-01-10 Cement Plug 2543.00 2558.00 0
2009-01-19 Perforation 566.00 567.00 17
2009-01-19 Remedial Casing Cementing 566.00 567.00 0
2009-01-19 Packing Device Capped w/Cement 345.00 561.00 0
2009-01-22 Packing Device Capped w/Cement 306.00 345.00 0
2009-01-10 Perforation 2011.00 2012.00 17
2009-01-12 Remedial Casing Cementing 2011.00 2012.00 0
2009-01-12 Packing Device Capped w/Cement 2008.00 2016.00 0
2009-01-12 Packing Device Capped w/Cement 1946.00 2006.00 0
2009-01-15 Perforation 1627.00 1628.00 17
2009-01-15 Perforation 1607.00 1608.00 17
2009-01-16 Remedial Casing Cementing 1627.00 1628.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1970 412 0.0 0.0 0.0
1971 515 0.0 0.0 0.0
1972 1185 0.0 0.0 0.0
1974 122 0.0 0.0 0.0
1975 3214 0.0 0.0 0.0
1976 4735 0.0 0.0 0.0
1977 4545 0.0 0.0 0.0
1978 4548 0.0 0.0 0.0
1979 8389 0.0 0.0 0.0
1980 8757 0.0 0.0 0.0
1981 5599 0.0 0.0 0.0
1982 7878 0.0 0.0 0.0
1983 7205 0.0 0.0 0.0
1984 8213 0.0 0.0 0.0
1985 6076 0.0 0.0 0.0
1986 8148 0.0 0.0 0.0
1987 8072 0.0 0.0 0.0
1988 7644 0.0 0.0 0.0
1989 6092 0.0 0.0 0.0
1990 7790 0.0 0.0 0.0
1991 8431 0.0 0.0 0.0
1992 8043 0.0 0.0 0.0
1993 8024 0.0 0.0 0.0
1994 8214 0.0 0.0 0.0
1995 8549 0.0 0.0 0.0
1996 7739 0.0 0.0 0.0
1997 8706 0.0 0.0 0.0
1998 8274 0.0 0.0 0.0
1999 8279 0.0 0.0 0.0
2000 8614 0.0 0.0 0.0
2001 7954 0.0 0.0 0.0
2002 6722 0.0 0.0 0.0
2003 7730 0.0 0.0 0.0
2004 8407 0.0 0.0 0.0
2005 8292 0.0 0.0 0.0
2006 8010 0.0 0.0 0.0
2007 8641 0.0 0.0 0.0
2008 4439 0.0 0.0 0.0

For data sources see[5]

References