X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325030601000

Well Details

Well ID: 0325030601000
Loading map...
Location: 00/01-06-032-03W5/0
Location Alias: 00/01-06-32-03 W5M
Location Alias 2: 00/01-06-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 06
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 1-6-32-3
Operator Name: ExxonMobil Canada Ltd.
License Number: 0019259
License Date: 1960-06-27
License Status: Issued
Spud Date: 1960-07-09
Final Drill Date: 1960-08-08
Well Total Depth: 2653.90 m
Surface Hole Latitude: 51.709040
Surface Hole Longitude: -114.407498

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-06-27 Obtained License
1960-08-08 Finished Drilling
1960-08-08 Well Mode changed to Drilled and Cased
1960-08-10 Production Casing Operation Performed
1960-08-11 Perforation Treatment Performed - Open-Hole Completion
1961-08-19 Well Began Production
1961-08-19 Well Fluid changed to Crude Oil
1961-08-19 Well Mode changed to Flowing
1977-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-18 Perforation Treatment Performed - Jet Perforation
1977-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-20 Well Fluid changed to Crude Oil
1977-10-20 Well Mode changed to Gas Lift
1980-03-11 Well Fluid changed to Crude Oil
1980-03-11 Well Mode changed to Suspended
1984-01-19 Perforation Treatment Performed - Jet Perforation
1984-01-19 Well Log Performed
1984-01-25 Perforation Treatment Performed - Acid Wash - No Pressure
1984-02-01 Well Fluid changed to Crude Oil
1984-02-01 Well Mode changed to Gas Lift
1984-06-20 Well Began Injection
1984-06-20 Well Fluid changed to Water
1984-06-20 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-08-11 Open Hole/Barefoot Completion 2639.60 2653.90 0
1977-09-27 Acid Treatment 2639.60 2653.90 0
1977-10-18 Perforation 2633.50 2639.00 7
1977-10-19 Acid Treatment 2633.50 2639.00 0
1984-01-19 Perforation 2612.60 2614.50 7
1984-01-19 Perforation 2616.30 2621.20 7
1984-01-19 Perforation 2622.30 2626.60 7
1984-01-19 Perforation 2628.80 2633.00 7
1984-01-25 Acid Wash 2612.60 2653.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 372 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 2175 0.0 0.0 0.0
1970 456 0.0 0.0 0.0
1971 258 0.0 0.0 0.0
1972 1815 0.0 0.0 0.0
1973 3828 0.0 0.0 0.0
1974 7697 0.0 0.0 0.0
1975 1790 0.0 0.0 0.0
1978 4465 0.0 0.0 0.0
1984 692 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References